SEI reports for new significant environmental effects on the HS2 Phase One route
HS2 Ltd is required by the General Principles of the High Speed Rail (London – West Midlands) Environmental Minimum Requirements to report any new significant environmental effects that exceed those which were reported in the Phase 1 Environmental Statement (as amended).
- From:
- High Speed Two (HS2) Limited
- Published
- 8 December 2023
- Last updated
-
1628 August 2024 — See all updates
Documents
Temporary closure of A38 northbound and southbound slip roads at Streethay
PDF, 1.74 MB, 97 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
Princes Risborough to Aylesbury (PRA) Rail Line
PDF, 1.1 MB, 30 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
Princes Risborough to Aylesbury (PRA) Rail Line Underpass Footpaths
PDF, 796 KB, 16 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
BanburyTemporary Road,closure Stonetonof Dalehouse Lane
PDF, 5.42 MB, 94 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
Canterbury Works Ventilation Shaft S1
PDF, 1.95482 MBKB, 2428 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
Details
HS2 Ltd is required by the General Principles of the High Speed Rail (London – West Midlands) Environmental Minimum Requirements to report any new significant environmental effects that exceed those which were reported in the Phase 1 Environmental Statement (as amended).
If through the design and/or construction process, there are predicted to be new residual significant environmental effects that HS2 Ltd is unable to minimise or reduce through taking all reasonable steps then they must be reported. This reporting is done through Supplementary Environmental Information (SEI).
Updates to this page
Last updated
-
The following SEI reports were added: Temporary closure of Dalehouse Lane Canterbury Works Ventilation Shaft S1
-
The following SEI reports have been added: Princes Risborough to Aylesbury (PRA) Rail Line Princes Risborough to Aylesbury (PRA) Rail Line Underpass Footpaths Banbury Road, Stoneton Lane and Wormleighton Road
-
First published.
Sign up for emails or print this page
Update history
2025-01-24 12:06
Added Temporary closure of Rocky Lane and Temporary phased closures of Station Road, Quainton.
2025-01-17 12:01
Added Footpath SBH27 and Bridleway SBH19.
2024-11-26 11:34
Banbury Road, Stoneton Lane and Wormleighton Road – file attachment created
2024-10-03 13:42
Princes Risborough to Aylesbury (PRA) Rail Line Underpass Footpaths – file attachment updated
2024-08-28 09:44
The following SEI reports were added: Temporary closure of Dalehouse LaneCanterbury Works Ventilation Shaft S1
2024-08-16 11:56
The following SEI reports have been added:Princes Risborough to Aylesbury (PRA) Rail LinePrinces Risborough to Aylesbury (PRA) Rail Line Underpass FootpathsBanbury Road, Stoneton Lane and Wormleighton Road
2023-12-08 09:27
First published.