UK ETS: Register your installation as an ultra-small emitter
How to register your installation as an 'ultra-small emitter' and comply with your emissions targets.
- From:
- Department for Energy Security and Net Zero
- Published
- 10 August 2021
- Last updated
-
117OctoberJanuary20242025 — See all updates
You don’t need to participate in the UK Emissions Trading Scheme if your installation emits less than 2,500 tonnes of carbon dioxide equivalent (CO2eq) in the relevant period.
You can instead register your installation as an ‘ultra-small emitter’ (USE) under the Ultra-small Emitter scheme. You must continue to monitor your emissions and notify the regulator if your emissions exceed the agreed threshold.
This guidance tells you:
- how to register your installation as an USE
- how to comply with your emissions targets as an USE
- what to do if your installation no longer qualifies as an USE
Aircraft operators cannot apply to register as ultra-small emitters. Read separate guidance for aircraft operators with low emissions.
Eligibility
Eligibility for the 2021 to 2025 allocation period.period
Your installation is classed as an USE if it is included in the ultra-small emitter list for the 2021 to 2025 allocation period.
List of ultra-small emitters for the 2021 to 2025 allocation period
ODS, 26.8 KB
This file is in an OpenDocument format
There will be no new USEUSEs’s during this allocation period.
Installations on the ultra-small emitters list for 2021 to 2025 had their greenhouse gas emissions permit or excluded installation emissions permit revoked in December 2020, as a permit is no longer required.
Eligibility for the 2026 to 2030 allocation period
Your installation is eligible if:
- your installation’s reportable emissions are 2,500 tonnes of CO2eq or below in scheme years 2021, 2022 and 2023
- you were carrying out a regulated activity at your installation on or before 1 January 2021
How to apply
Applications for USE status for the 20212026 to 20252030 allocation period
Between 1 April and 30 June 2025, all installation operators within scope of the UK Emissions Trading Scheme (UK ETS) are closed.required to submit data to their regulator ahead of the next allocation period. If you wish to have the status of an Ultra Small Emitter (USE) for the 2026-2030 period, you must participate and apply.
YouThe USE data collection template and guidance are designed for existing USEs who are applying for USE status for the 2026-2030 period. Existing USEs will be ableasked to applysubmit fortheir USE data collection report, with the 2026verification report appended to 2030it, allocationto periodtheir fromregulator 1by Aprilemail 2025(see tothe 30Regulator Junecontact 2025.details).
Read Detailsthe ofguidance before filling in the processUSE willdata becollection madetemplate. availableThe closertemplate includes instructions on how to thesecomplete dates.it correctly.
AsExisting partGreenhouse ofGas yourEmitters application(GHGE) or Hospital and Small Emitter (HSE) operators wishing to apply to join the USE list for the 2026first totime 2030should allocationcomplete period,the you2025 Baseline Data Collection and scheme status applications, rather than the templates here. Guidance for these will needbe toavailable submitseparately in advance of the followingapplication toperiod yourand regulator:submission windows.
detailsIf
ofyouyourareinstallation,anincludingexistingdetailsUSEofapplyinganytoUKjoinETSthe USEpermitlistinforforceevidence2026-2030,thatparagraphyour3installationofmeetsSchedule 8 to theeligibilityOrdercriteriasetsandoutsupportingthe information
EvidenceThe operator must provide:
a. Details of the installation.
b. Evidence that the installation’s reportable emissions mustin beeach verifiedof beforethe being2021, submitted2022 toand your2023 regulator.scheme Theyears do not exceed the maximum amount.
c. A verification report which verifies evidence of historicemissions reportableas emissionssatisfactory.
Existing mustUSEs bemaking an application for USE status are required to have their evidence verified as satisfactory in accordance with the Verification Regulation 2018. As such, their emissions data must have been verified as modifiedsatisfactory by a UKAS accredited verifier to demonstrate the fulfilment of the USE qualifying criteria. Please use the verification template here.
A site visit will be required by the verifier in accordance with Schedule 8, paragraph 4 (11) of the UK ETS Order, orwhich mayrefers beout self-verified,to ifthe yourVerification installationRegulation was2018. aThe hospitalsite ormust smallhave emitterbeen invisited theat 2021least toonce 2025during the 2021-2025 allocation period.
Ultra-small emitter data template, verification report and guidance
- Ultra-Small Emitter data collection template (MS Excel Spreadsheet, 4.41 MB)
- Ultra-Small Emitter verification report (MS Excel Spreadsheet, 130 KB)
- Ultra-Small Emitter application process guidance (PDF, 461 KB, 19 pages)
Regulator contact details
Use these contact details for queries and submissions:
- for sites in England - the Environment Agency (EA) at ethelp@environment-agency.gov.uk
- for sites in Scotland - the Scottish Environment Protection Agency (SEPA) at emission.trading@sepa.org.uk
- for sites in Wales - National Resources Wales (NRW) at GHGHelp@naturalresourceswales.gov.uk
- for sites in Northern Ireland - the Northern Ireland Environment Agency (NIEA) at emissions.trading@daera-ni.gov.uk
After you have submitted your application
Once you submit your application, your regulator will make a preliminary assessment of whether your installation meets the conditions required to be an USE.
Your regulator will then send this preliminary assessment to the UK ETS authority for a final assessment. If the UK ETS authority considers that the installation meets the criteria, it will include it in the ultra-small emitter list for 2026-2030.
If your installation is included in the list, it will be a USE for the 2026 to 2030 allocation period. This list will be published by the UK ETS authority by 30 April 2025.
The regulator will then revoke any existing greenhouse gas emissions permit or hospital or small emitter permit.
You do not need any type of UK ETS permit during the period in which your installation is an USE.
How to comply with your emissions targets
You must monitor your emissions and notify your regulator if you emit more than 2,500 tonnes of CO2eq in any scheme year.
To monitor your emissions, you must follow the methodology set out in your monitoring plan. Your plan must be kept up to date in line with the provisions in the UK ETS Order and must ensure this remains fit for purpose.
If your installation no longer qualifies as an ultra-small emitter
Your installation cannot voluntarily cease to be an USE during the allocation periods.
Your installation will no longer be an USE if its reportable emissions exceed 2,500t CO2eq in either:
- any of the 2021 to 2023 scheme years in relation to the 2021-2025 allocation period
- any of the 2026 to 2028 scheme years in relation to the 2026-2030 allocation period
If your installation ceases to be an USE, you must notify your regulator by 31 March of that scheme year. If you do not, you will be liable to a civil penalty.
Your regulator will then send you a notice requiring you to either:
- join the UK ETS main scheme
- join the Hospital and Small Emitter scheme (if you meet the eligibility criteria)
You must then apply for either a greenhouse gas emissions permit or a hospital or small emitter permit.
You will remain liable for any unpaid penalties and any further sanctions applied for non-payment of those penalties arising from your time as an USE.
Updates to this page
Last updated
-
Added templates and guidance on how existing USEs should apply for USE status for the 2026 to 2030 allocation period.
-
The application dates for the 2026 to 2030 allocation period will now be from 1 April to 30 June 2025.
-
First published.
Sign up for emails or print this page
Explore the topic
Update history
2025-01-17 17:00
Added templates and guidance on how existing USEs should apply for USE status for the 2026 to 2030 allocation period.
2024-10-01 14:56
The application dates for the 2026 to 2030 allocation period will now be from 1 April to 30 June 2025.