FG2: Sheep netting
Find out about eligibility and requirements for the sheep netting item.
- From:
-
- Published
- 2 April 2015
- Last updated
-
3
12FebruaryAugust20252024— See all updates
- Grant type:
-
- Capital item
- Land use:
- Land use:
-
,and Water quality - Tiers or standalone items:
- Tiers or standalone items:
-
,and Standalone capital items - Funding (per unit per year):
- Funding (per unit per year):
-
- Up to £100
- Grant type:
This item is part of Capital Grants. You must read the Capital items: guidance for applicants and agreement holders to understand the rules and how to apply.
How much you’llwill be paid paid
£7.47 per metre (m).
HowWhere thisto itemuse benefitsthis the environmentitem
ControllingIt livestockis protectsavailable environmentalfor featuresCountryside andStewardship helpsMid toTier manage habitats.
This item can help you protect, recover and improveHigher biodiversityTier onif yourone land.
Whereof youthe canfollowing use this item
You can use this item either:apply:
- alongside
Inconjunctionwithmanagementrestoration or creation action or option where you need new fencingisrequiredoption - to
Toprevent water pollution caused by farming –(approvalyou do not need approval from Catchment Sensitive Farming,FarmingisnotrequiredHighpriorityPriorityarea for water qualityquality) - to
Toprotect environmental features such(forasexamplenewly planted trees, buffer strips and field corners taken out of managementmanagement)(ororas agreed with yourtheForestry Commission adviser)WoodlandOfficer. - as
It partis ofavailable afor WoodlandCountryside TreeStewardship HealthCapital grant
YouGrants cannotand useWoodland thisTree item:health:
- on
toapreventsitewaterwherepollutionacausedfencebyhasfarmingreceived(approvalafromgrantCatchmentinSensitivetheFarminglastis7notyears - to
requiredprotectnorestablisheddoeswoodlandthefromparcellivestockneedunlesstoagreedbewithinyouraForestryHighCommissionPriorityadviserareaforwaterquality)
Your
- scheduled
trees,monuments - registered
bufferparksstripsand gardens - registered
fieldbattlefields - Selected
cornersHeritagetakenInventoryoutforofNaturalmanagement)Englandor(SHINE)assitesagreedwiththeForestryCommissionWoodlandOfficer.
You
Where must not use this item oncannot scheduledbe monuments,used
Onregisteredhistoricparks and gardens or registeredarchaeologicalbattlefieldsfeatureswithoutaswrittenidentifiedapprovalinfromtheHistoric England.You
EnvironmentmustFarmnotEnvironmentuseRecordsthis(HEFER)OnitemaonsiteSHINEwheresitesawithoutfencewrittenhasapprovalreceivedfromayourgrantlocalinauthoritythehistoriclastenvironment7adviser.years
WhatHow youthis mustitem dowill tobenefit usethe thisenvironment
This item protects environmental features from livestock and helps manage habitats.
Requirements
WhenFor usingnew woodenagreements posts, you must:
- remove
Removeall old fencing material before putting up the new fencing
For wooden posts you must:
- use
Usesoftwood timber that’sthatistreated,or treated with an HSE approved industrial wood preservative, sotoyou comply with Use Class 4 that’sasdefined in BS8417:2014 ‘Preservation of Wood-Practice’.–Youyou canalsofencing.Asanalternativetowoodenfenceposts,youcanusemetalfenceposts.ForHigherTieryoushouldagreethiswithyourNaturalEnglandAdviserorForestryCommissionWoodlandOfficer Erectthesteelwiremeshfencetoatleast1.05mhighwheninstalled.Youcanheight,Useusingstrands of galvanised 4mm mild plain steel wire or 2.5mm barbed wire or high tensile wire- use
Usestraining poststhat100long,xat least 100mm by 100mm square when sawnsawn,or have at least a 125mm top diameterdiameter,andareatleast2.1mlong.Setthestrainingpostsnomorethan150mapartifusingmildsteelor600mapartforhightensilewire - set
Placethe straining posts no more than 150m apart if you use mild steel wireline(orwire,orwire - use
Usea straining post at every change of direction (horizontal or vertical) and at each end of the fence – you can use suitable bracing to achieve stability - use
Usestruts that arehaveataleasttop75mmdiameterbyof75mm square or have at least a75mm,75mmortop diameter and are at75mmleastby2.1m75mmlongwhen–sawn.youYoucan use a box strainer withwith,or instead of a strutstrut. - mortice
Mortice(cut) struts into the straining post at an angle of no more than 45 degreesdegrees.–Dodo not secure by a nail alone - set
Usethe intermediate posts 3mthatorhavelessaaparttopfordiametermildofsteel and at least 4.5m65mm,fororhigharetensile75mmsteelby–75mmadjustwhenthese measurements according to the ground conditionssawn - use
Useintermediate posts that are at least 75mm75byx75mm squaresquare,or have at least a 65mm top diameterdiameter,and are at least 1.65m long
When
- agree
moreusingthanmetal3mpostsapartwithforyourmildNaturalsteel,EnglandandoratForestryleastCommission4.5advisermetresifforinstallinghighontensilelandsteel.inAdjustatheseCountrysidemeasurementsStewardshipaccordingHighertoTiertheagreementgroundconditions. - remove
Makeallsureoldthatfencingallmaterialthebeforeworkputtingmeetsupthenewrelevantfencing - erect
BritishtheStandardssteel-wireseemeshcopiesfenceoftotheatmostleastup-to-date1.05mstandardshighforwhen installedguidance
You can use additionalany strandstype of galvanisedmetal steelpost, wirebut (plainthey ormust barbed)be ifsuitable youfor needthe extrasite height.
For ormetal highposts tensileyou wire
- use
Usestraining posts which are at least 2.4m in lengthlength. - place
Placea straining post at every change of direction (horizontal or vertical) and at each end of the fence – you can use suitable bracing to achieve stabilityfence. - use
Useintermediate posts at least 1.65m longlong. - struts
Strutsshould be at least 1.8m longlong. Attachandstrutsattached to posts using a suitable connectorconnector.
You
You can install the startmetal posts according to the installation recommendation of yourthe agreement.manufacturer.
YouDo must not:
- attach the fence to trees or hedgerows
- block or restrict access to open access land
- hard staple the wire to intermediate posts
posts.–Thethe wire should be a running fit so it can move, contract and expand in different temperatures
Evidence
If you have an existing agreement, you must keep continue to follow the specifications in that agreement.
Keeping records
You must keep photographs of the completedfollowing workrecords and providesupply them with your claim.payment claim:
photographsofthecompletedwork
You must also keep the following records and providesupply them on request:
- any consents or permissions connected with the work
- receipted invoices
invoices,or bank statements where a receipted invoice is unavailable - photographs of the site before work starts
ReadPlease see the record keeping and siteinspection visit requirements as set out in the Agreementrelevant holder’sMid guide:Tier, Higher Tier or Capital Grants,Grants Higherguidance Tierfor capitalmore grantsdetail. andYou Protectioncan andfind Infrastructurethe grantslatest forguidance moreat information.
ItemsCountryside Stewardship: get funding to protect and supplementsimprove the land you canmanage.
Related useMid withTier thisand Capital Grants item
Capital items
You can use this item withon thesethe items:same feature as the following supplement:
Biodiversity
FY6:This Restoreitem coppicinghas been identified as being beneficial for biodiversity. All Countryside Stewardship habitat creation, restoration and management options are of great significance for biodiversity recovery, as are the wide range of arable options in woodland
Supplements
Youthe scheme. Capital items and supplements can usesupport this itemhabitat withwork FG4:depending Rabbiton fencingthe supplement.holding’s situation and potential.
Advice
The toconnectivity helpof youhabitats useis thisalso item
Thevery followingimportant adviceand mayhabitat helpoptions youshould tobe uselinked thiswherever item,possible. butBetter youconnectivity dowill notallow havewildlife to followmove/colonise itfreely to getaccess paid.water, It’sfood, notshelter partand breeding habitat, and will allow natural communities of thisboth item’sanimals requirements. and plants to adapt in response to environmental and climate change.
BritishFurther Standards
CheckRead Countryside Stewardship: get funding to makeprotect sureand improve the workland meetsyou relevantmanage Britishto Standards.find out more information about Mid Tier, Higher Tier and Capital Grants including how to apply.
Updates to this page
Last updated 3
-
General improvement for clarity.
-
One sentence has been altered in the 'where this item cannot be used' section and multiple bullet points have been removed and replaced all throughout the 'requirements' section.
-
Update to requirements section.
-
Removal of text confirming FG2 Sheep netting availability under Countryside Stewardship Capital Grants (SFI pilot), as the SFI Capital offer is no longer available.
-
The Requirements section of this page has been updated
-
These requirements apply to agreements with a start date from 2023. For any existing live agreements, you must adhere to the specification as outlined in your agreement.
-
'Where to use this item' section updated to include detail on SFI pilot. 'Requirements' section updated.
-
Updated Where to use this item
-
'Air quality' added to Land use.
-
Added in links to Capital Grants manual as this option is now available for Capital Grants
-
Page updated to show latest record keeping
-
Capital item now includes woodland.
-
Updated for 2017 applications.
-
Information updated for applications in 2016.
-
First published.
Explore the topic
Update history
2025-02-03 13:59
General improvement for clarity.
2024-08-12 12:13
One sentence has been altered in the ‘where this item cannot be used’ section and multiple bullet points have been removed and replaced all throughout the ‘requirements’ section.
2024-05-08 10:40
Update to requirements section.
2023-11-06 14:40
Removal of text confirming FG2 Sheep netting availability under Countryside Stewardship Capital Grants (SFI pilot), as the SFI Capital offer is no longer available.
2023-01-05 12:22
The Requirements section of this page has been updated
2022-02-23 11:11
These requirements apply to agreements with a start date from 2023. For any existing live agreements, you must adhere to the specification as outlined in your agreement.