Original document : https://www.gov.uk/government/publications/storing-and-physically-treating-hazardous-metal-shredder-residues-rps-274

Change description : 2025-03-14 11:55:00: In ‘conditions’ you must have the correct level of technical competence to cover accepting and physically treating hazardous shredder residues within 12 months of the issue of the permit variation to include 19 10 03* or 19 10 05* (or both). ‘Things to note’ you will have 12 months from permit variation issue to gain the right qualification. Updated to the latest RPS template. This RPS will be reviewed by 31 March 2026. [Guidance and regulation]

Showing diff : 2024-03-06 13:47:18.526047937 +00:00..2025-03-14 11:55:26.755187673 +00:00

Guidance

Storing and physically treating hazardous metal shredder residues: RPS 274

Environment Agency regulatory position on when you can store and physically treat hazardous metal shredder residues without the correct waste codes on your permit.

Update history

2025-03-14 11:55
In ‘conditions’ you must have the correct level of technical competence to cover accepting and physically treating hazardous shredder residues within 12 months of the issue of the permit variation to include 19 10 03* or 19 10 05* (or both). ‘Things to note’ you will have 12 months from permit variation issue to gain the right qualification. Updated to the latest RPS template. This RPS will be reviewed by 31 March 2026.

2024-03-06 13:45
We have extended the deadline for variation applications to add hazardous shredder residues to 1 April 2024. You need to have the correct level of technical competence to accept and treat hazardous shredder residues by 31 December 2024. We have added a ‘Things to note’ section. You must keep records for 3 years.This RPS will be reviewed by 31 December 2024.

2023-05-31 08:00
First published.