Guidance
Delivery of Results: guide to the data submission process
Guide to Ofqual's submission process.
- From:
- Ofqual
- Published
- 1 May 2024
- Last updated
-
1531AugustMarch20242025 — See all updates
Applies to England
Documents
Details
Guide to Ofqual’s submission process.
Updates to this page
Published 1 May 2024
Last updated 1531 AugustMarch 2024
+ show2025
href="#full-history">+ show all updates
-
Sign up for emails or print this page
Update history
2026-05-01 09:30
Updated the document template and clarified aspects of the text. Updated centre type codes to align with NCN centre types. Also made changes due to non-close monitoring AOs no longer being required to submit data for Part Three.
2025-03-31 15:08
Guidance has been reformatted
2024-08-15 13:48
Annex with Centre Type Codes was added.
2024-08-09 09:09
Dates of Part 3 have been amended
2024-07-26 14:21
Updated to show that NPM can now be accepted in the ResultIssued column.
2024-05-01 10:05
First published.
Details
Guide to Ofqual’s submission process.
Updates to this page
Published 1 May 2024
Last updated Sign up for emails or print this page
Update history
2026-05-01 09:30
Updated the document template and clarified aspects of the text. Updated centre type codes to align with NCN centre types. Also made changes due to non-close monitoring AOs no longer being required to submit data for Part Three.
2025-03-31 15:08
Guidance has been reformatted
2024-08-15 13:48
Annex with Centre Type Codes was added.
2024-08-09 09:09
Dates of Part 3 have been amended
2024-07-26 14:21
Updated to show that NPM can now be accepted in the ResultIssued column.
2024-05-01 10:05
First published.