Original document : https://www.gov.uk/government/publications/innovation-in-support-of-operations

Change description : 2025-04-02 08:44:00: Added a notice to the competition document to state that the competition is closed. [Guidance and regulation]

Showing diff : 2024-10-24 11:01:26.146356490 +00:00..2025-04-02 07:44:21.574537937 +00:00

Notice

Innovation in Support of Operations

This DASA competition is seeking proposals that can make a real-world difference, fast and at scale.

Update history

2025-04-02 08:44
Added a notice to the competition document to state that the competition is closed.

2024-10-24 12:01
spelling errors corrected

2024-09-10 10:33
Two clarification questions have been added;Q: For Challenge 4 Innovative solutions for Minefield Breaching, is minefield detection on its own suitable? A: No. This challenge is looking for solutions to effect a breach of minefields as per the challenge information in the competition document. Your innovation must include the actual breaching which is the process of clearing a lane through a minefield. If your innovation is solely related to the detection of mines/minefield then it will be out of scope for this competition. You can use the collaboration survey to find collaborators who may have capability to support you in a fuller proposal.Q: Do I have to conduct a demonstration at the end of the 3 month project?A: Yes. Please provide details of this demonstration which must be conducted in the UK without specific MOD support to conduct that demonstration.

2024-08-20 15:31
Added new pdf “Innovation in Support of Operations Competition Briefing”

2024-07-31 15:35
Section added: Clarification Questions and Answers

2024-07-24 15:43
Para 7.6 has been changed from;the proposal should focus on the requirements to deliver to the (minimum of TRL6) demonstration, but must also include an outline proposal for a 3-month refinement phase beyond the initial delivery – this should be presented as a costed optionThe new paragraph now reads; the proposal should focus on the requirements to deliver to the (minimum of TRL6) demonstration, but should include an outline proposal for a 3-month refinement phase, beyond the initial three month delivery phase if this should be deemed necessary – this should be presented as a costed option.[This is clarify that the refinement phase is optional and not mandatory.]

2024-07-18 11:53
First published.