Local Environmental Management Plans for HS2 Phase One
These plans set out the site-specific control measures for HS2 contractors working within local authorities along the Phase One route.
- From:
- High Speed Two (HS2) Limited
- Published
- 5 July 2017
- Last updated
-
287NovemberApril20242025 — See all updates
Documents
Birmingham City Council Local Environmental Management Plan
PDF, 639 KB, 60 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
Curzon Street Station (Birmingham City Council) Local Environmental Management Plan
PDF, 1.1 MB, 41 pages
London Borough of Brent Local Environmental Management Plan
PDF, 528 KB, 40 pages
Buckinghamshire Council Local Environmental Management Plan
PDF, 2.98 MB, 126 pages
London Borough of Camden Local Environmental Management Plan
PDF, 811 KB, 52 pages
Cherwell District Council Local Environmental Management Plan
PDF, 1.01 MB, 50 pages
London Borough of Ealing Local Environmental Management Plan
PDF, 547 KB, 61 pages
London Borough of Hammersmith and Fulham Local Environmental Management Plan
PDF, 1020617 KB, 4241 pages
HEx Depot (Langley) Local Environmental Management Plan
PDF, 962 KB, 36 pages
London Borough of Hillingdon Local Environmental Management Plan
PDF, 811 KB, 86 pages
Royal Borough of Kensington and Chelsea Local Environmental Management Plan
PDF, 525 KB, 37 pages
Lichfield District Council Local Environmental Management Plan
PDF, 775 KB, 61 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
North Warwickshire Borough Council Local Environmental Management Plan
PDF, 831 KB, 63 pages
Solihull Metropolitan Borough Council Local Environmental Management Plan
PDF, 871 KB, 85 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
Stratford‐on‐Avon District Council Local Environmental Management Plan
PDF, 1.13 MB, 51 pages
Warwick District Council Local Environmental Management Plan
PDF, 574 KB, 63 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
West Northamptonshire District Council Local Environmental Management Plan
PDF, 1.51 MB, 72 pages
City of Westminster Local Environmental Management Plan
PDF, 456 KB, 33 pages
Details
High Speed Two (HS2) Ltd and its consultant have produced Local Environmental Management Plans (LEMPs), a requirement under the Code of Construction Practice (CoCP). These plans are specific to each local authority area along the Phase One route. The LEMPs are based on environmental information currently available to the project, as reported within the Environmental Statement (including Supplementary and Additional Provision Environmental Statements).
The contractors working for HS2 Ltd will be required to comply with the LEMPs during construction works and must meet the High Speed Rail (London to West Midlands) Environmental Minimum Requirements (EMRs). The EMRs set out high-level environmental and sustainability commitments to be carried out during the planning and implementation of works along the Phase One route. The CoCP forms part of the EMRs.
Are the LEMPs finalised?
HS2 Ltd has been consulting with local authorities during the production of the LEMPs. The most up to date version of the LEMPs are published on this page. If, up to and during detailed design, new environmental baseline information comes to light (such as the identification of new sensitive receptors), then the LEMPs will be updated to reflect these changes.
What happens next?
Engagement events will be carried out to introduce and brief communities on local environmental information, management and mitigation. If local communities have comments relevant to the content of the LEMPs, they will be reviewed and updated, as required.
Details
High Speed Two (HS2) Ltd and its consultant have produced Local Environmental Management Plans (LEMPs), a requirement under the Code of Construction Practice (CoCP). These plans are specific to each local authority area along the Phase One route. The LEMPs are based on environmental information currently available to the project, as reported within the Environmental Statement (including Supplementary and Additional Provision Environmental Statements).
The contractors working for HS2 Ltd will be required to comply with the LEMPs during construction works and must meet the High Speed Rail (London to West Midlands) Environmental Minimum Requirements (EMRs). The EMRs set out high-level environmental and sustainability commitments to be carried out during the planning and implementation of works along the Phase One route. The CoCP forms part of the EMRs.
Are the LEMPs finalised?
HS2 Ltd has been consulting with local authorities during the production of the LEMPs. The most up to date version of the LEMPs are published on this page. If, up to and during detailed design, new environmental baseline information comes to light (such as the identification of new sensitive receptors), then the LEMPs will be updated to reflect these changes.
What happens next?
Engagement events will be carried out to introduce and brief communities on local environmental information, management and mitigation. If local communities have comments relevant to the content of the LEMPs, they will be reviewed and updated, as required.
Updates to this page
Sign up for emails or print this page
Update history
2025-04-07 14:07
Updated London Borough of Hammersmith and Fulham Local Environmental Management Plan
2024-11-28 11:01
Solihull Metropolitan Borough Council Local Environmental Management Plan – file attachment updated
2024-11-06 09:48
Birmingham City Council Local Environmental Management Plan – file attachment updated
2024-10-25 15:30
Warwick District Council Local Environmental Management Plan – file attachment updated
2024-10-23 15:13
Lichfield District Council Local Environmental Management Plan – file attachment updated
2024-10-23 13:17
North Warwickshire Borough Council Local Environmental Management Plan – file attachment updated
2024-03-25 13:28
Updated Buckinghamshire LEMP
2023-03-10 10:33
Updated London Borough of Hammersmith and Fulham Local Environmental Management Plan.
2023-02-15 10:56
Updated Brent, Camden, Ealing, Hillingdon, Kensington and Chelsea and City of Westminster.
2022-11-11 12:10
Updated Stratford-on-Avon, Cherwell and West Northamptonshire and added Buckinghamshire whilst removing Aylesbury, Chiltern and Wycombe and Three Rivers and South Bucks.