Guidance

HNTAS: Existing heat networks - draft assessment procedures for Milestone 4

Draft procedures that Heat Network Technical Assurance Scheme (HNTAS) registered assessors will need to follow to assess a heat network’s compliance with HNTAS technical requirements.

Applies to England, Scotland and Wales

Documents

Details

These draft assessment procedures for existing heat networks detail the activities to be undertaken to verify compliance with Milestone 4 requirements in the upcoming Heat Network Technical Assurance Scheme (HNTAS).  They cover the requirements to achieve HNTAS Certification 1.

The documents are for use by:

  • heat network assessors
  • heat network operators

These assessment procedures correspond to the draft the HNTAS technical: Existing heat networks - draft technical specifications for Milestone 4.

Next steps

We will be requesting feedback on the information in these documents. We will run a change management process in parallel with the HNTAS technical standards consultation which willcloses launchon shortly.15 April 2026.

We will make final versions of these documents available before the scheme starts.

Updates to this page

Published 5 January 2026
Last updated 21 January 2026 href="#full-history">+ show all updates
  1. Added link to HNTAS consultation.

  2. First published.

Sign up for emails or print this page