Change description : 2026-02-26 11:00:00: Standard rules: ‘Activity 4 – treating biogas and biomethane’ changed (b) and added (d) and (e). Added technique 21 and 22, 2.5 decarbonisation readiness, 4.2.5 and ‘table 4.2’ captured, treated and stored carbon dioxide. ‘Interpretation’ added last sentence to ‘accident management plan’ and meaning for ‘CCR’, ‘CCR conditions’, ‘change in type of technical assessment’, ‘decarbonisation readiness’, ‘HCR’ and ‘HCR conditions’. Generic risk assessment: added 3.4 Accidental release of CO2. [Guidance and regulation]

Showing diff : 2023-03-13 14:23:25.572124576 +00:00..2026-02-26 11:00:22.118216221 +00:00

Statutory guidance

SR2021 No 8: on-farm anaerobic digestion facility using farm wastes only, including use of the resultant biogas – installations

For a Part A installation with an anaerobic digestion capacity of over 100 tonnes of waste, or a combination of waste and non-waste each day and accepting no more than 100,000 tonnes per year.

Update history

2026-02-26 11:00
Standard rules: ‘Activity 4 – treating biogas and biomethane’ changed (b) and added (d) and (e). Added technique 21 and 22, 2.5 decarbonisation readiness, 4.2.5 and ‘table 4.2’ captured, treated and stored carbon dioxide. ‘Interpretation’ added last sentence to ‘accident management plan’ and meaning for ‘CCR’, ‘CCR conditions’, ‘change in type of technical assessment’, ‘decarbonisation readiness’, ‘HCR’ and ‘HCR conditions’. Generic risk assessment: added 3.4 Accidental release of CO2.

2023-03-13 14:23
In the standard rules permit, changed the text in the introductory note under the minimum distances from sensitive receptors and in condition 2.2 from ‘250 metres of the nearest sensitive receptor where any processing or storage of digestate fibre is in the open’ to ‘250 metres of the nearest sensitive receptor where any further treatment takes place by composting digestate fibre in the open’.

2023-03-01 15:54
Corrected an error in the generic risk assessment. Changed Parameter 3 from ‘The maximum quantity of waste received on site each day, including solids and liquids, is 200 tonnes per day.’ to ‘The maximum quantity of waste received each day shall not exceed the designed storage capacity of the site.’

2022-07-05 13:40
Edit to Appendix A – removal of contact details on form as no longer used.

2022-05-17 17:53
Added ‘or habitats’ to the conservation screening distance in the Introductory note and under section 2.2 The site.

2022-03-04 14:41
Corrected an error under Technique 11 – removed ‘(a) all waste reception, transfer and pre-treatment shall be carried out in an enclosed building with air extraction and an abatement system’ as we should not have included that requirement.