Guidance

Get a permit to deal with coal or coal mines

Information about getting permission to enter, disturb or change coal mines or coal managed or owned by the MiningCoal Remediation Authority that’s on your property.

You needmust aget permitpermission to enter, disturb or change coal mines or coal managed or owned by the MiningCoal Remediation Authority that’s on your property.

This includes:

  • coal seams under your property

  • coal workings, such as existing mine tunnels

  • mine entrances

You need to get a permit if you want to:

  • cap the mine

  • fill the mine

  • drill boreholes through a coal seam

  • build over or near to the entrance to the mine

You need a mining licence or ‘agreement’ to mine coal or extract gas.

How to apply

Fill in the online application form. You’ll needhave to register first if you do not have an account with the MiningCoal Remediation Authority.

YourYou’ll permitneed applicationto must include specific supporting information depending on the type of work you’re proposing.upload:

StandardPlease applicationsnote takethat 20once orprocessing moreof workingthe daysapplication andhas arecommenced chargedno therefund normalof rate.

Expeditedthe applicationsapplication takecharge 10will workingbe daysmade. Application andcharges are chargednon-transferable.

We athave 2.5introduced timesa the5% normaldiscount rate.on Subjectapplication tofees availability.for permit applicants who:

  • Expresshave applicationsbeen takecompliant 5with workingtheir daysprevious andpermits, arewith chargedno atconcerns 4raised timesby the normalMining rate.Remediation SubjectAuthority toor availabilityHealth and restrictedSafety toExecutive

  • have siteno investigationoutstanding applicationsclosure thatreports dofrom notpreviously relateissued topermits

  • have minenot entriesconducted (shaftsany oractivity adits).on Furtherour exemptionsPermitting maynon-compliance apply.policy

    How

  • are muchusing ita costs

    Permitcontractor chargeswhose areoperations basedhave on:

    • thebeen numberaudited ofby boreholes

    • thean areaindependent ofmining theengineer application

    • thewithin number15 ofmonths mineprior entries to bethe investigatedpermit and/or treatedapplication

    YouApplicants canclaiming paya bydiscount debitmust card,provide creditproof cardof orthe BACS.independent Chargesmining areengineer non-transferableaudit.

    Please anddo non-refundable.not Allschedule chargesworks includeuntil VAT.

    Permitthe charges

    Chargepermit basisMinimumMaximumPercertificate unit
    Areahas ofbeen applicationissued.

    Permission (anyto numberenter ofor shafts,disturb aditsMining andRemediation unrecordedAuthority mining featuresinterests

    Express included)

    £167£4,186applications

    Express (for(5 areasworking moredays) thanapplications 2.5are hectares)

    £167charged perat 0.14 hectaretimes (1,000m2)
    Numberthe ofnormal boreholesapplicable (initialrate. investigationThese only)£167£4,186£84are persubject borehole
    Numberto ofavailability mineand entriesrestricted to besite investigatedinvestigation orapplications treatedthat (whendo not includedrelate into themine areaentries, charge)£167£4,186£167also perknown shaftas shafts or adit
    Applicationadits.

    Further includingexemptions minemay entryapply.

    Expedited andapplications

    Expedited treatment

    Total(10 feesworking fordays) eachapplications shaftare orcharged adit£4,186-
    Waterat resources2 consentsand fora capitalhalf floodtimes riskthe projects£167£4,186Samenormal asapplicable standardrate permitand applications
    will be subject to availability.

    OtherStandard feesapplications

    Fee

    Standard type

    Cost
    Administration(20 feeplus forworking minordays) changesapplications andare addingcharged investigationthe fornormal unrecordedapplicable miningrate.

    Submission features

    £74
    Permitof extension£167
    information required as part of intervention measures and notices

    TheseRetrospective feesubmission ratesof reflectclosure ourreports costsand ininformation linerequired withas thepart principlesof inintervention Managingand Publicenforcement Moneyaction Mayagainst 2023unpermitted document.

    Wework areor committedbreach toof keepingpermit costsconditions aswill lowbe ascharged possibleat one and dohalf nottimes makethe anyrate profitfor froma fees.standard application for similar activities.

    5% discount

    YouWhere couldwe qualifyissue for a 5notice %for discountunauthorised onwork applicationwe feesrequire ifthe yourelevant meetparty allto submit the followingnecessary criteria:

    • youclosure havereport beencovering compliantworks withundertaken. previousAn permits,acknowledgement withletter nowill concernsbe raisedissued, byhowever thewe Miningwill Remediationconsider Authoritythe oradvice of the Health and Safety Executive regarding the granting of a permit.

    • Time and material charges

      youWhere haveadditional notime outstandingis closurespent reportson froman previouslyapplication issuedafter permits

    • youmore havethan not2 conductedrequests anyfor activitythe same information we will charge for time and materials costs based on ourcurrent PermittingMining non-complianceRemediation policyAuthority charge-out rates.

    • youThese arewill usingbe ainvoiced contractoron whosea operationscase haveby beencase auditedbasis. byTime anand independentmaterial miningcharges engineerwill withinalso 15apply monthsto beforeany the permit applicationproject work.

    Water Resources and flood defence consents

    YouConsents mustfor providecapital proofflood ofdefence infrastructure will be charged for at the independentsame miningrate engineeras auditstandard whenpermit claimingapplications thisto discount.recover costs. 

    Making changes to a current permit

    IfWe recognise that in some cases, new information arises after a permit has been issued, youwhich canwill applyrequire changes to the permit or approved methods and techniques. An application to change or vary yourthe permit.permit Thiscan preventsbe submitted to formalise these changes and prevent a breach of permit conditions.

    Significant variations

    AAn significantapplication variationfor isa anysignificant changevariation thatto requires a technicalcurrent assessment.permit Thesewill arebe charged atfor the cost of the additional new activity.

    If yourthe original application was made on an area basis, the variation will be charged at either:

    • 60% of the standard application fee,fee or
    • the costcosts of the additional new activity

    activity, whichever is lower.

    If youIn paideither thecase, where a maximum fee forwas yourpaid, originalthe application,variation youfee will onlybe payfor an administrative charge for the variation.only.

    Minor variations

    A minorsignificant variation is any variation that requires a technical assessment to be done. 

    A minor administrative change thator doesvariation can be applied for changes which do not require technical assessment.assessment, Thissuch includesas an application made to change administrative changesdetails suchof aspermit, updatingwhich include name changes where a company changes its name wherebut retains the same management structure, systems and insuranceinsurance.

    An remainapplication theto same.

    Permitextend extensions

    Youtime validity of a current permit can applybe made to extend the time period of youra permit.permit only. This does not require aany additional technical assessment.assessment to be done.

    Multiple activities on onesame permit application

    IfWhere youone applypermit forapplication is made to cover multiple activities on a single site, the application fee payable is the totalaggregate sum of alleach of the proposed activities.

    If multiple phases of work are neededrequired forin relation to a mine entryentry, (forsuch example,as investigation followed by capping),capping youor cangrouting includefollowed by capping, these can be covered on a single application.application Thewith the permit will be issued on a conditional basis, depending on the information available.

    This allows youthe initial phase to startcommence with the initialapplicant phasereturning andto complete the engineering appraisal later.

    Theprocess at a later date. The application fee will be the totalsum of the mine entry investigation and the mine treatment activities.

    Intervention

    Permitting measurescharges andare notices

    shown inclusive of VAT. Payment can be made by debit or credit card or BACS.

    IfPayment youmust submitbe closuremade reportsin orfull informationbefore retrospectivelythe aspermit partcan ofbe enforcementprocessed actionand againstgranted.

    Permitting unpermittedcharges workbased oruponMinimum breachchargeMaximum chargeCharges per unit
    Area of permitapplication conditions,- youany willnumber beof chargedshafts atand 1.5adits timesare included within the standardfee£162£4,056 application(for rate.

    Ifover weand issueabove a2.5 noticehectares)

    £162 per 0.1 hectare (1,000m2)
    Number of boreholes for unauthorisedinitial work,investigation youpurposes mustonly£162£4,056£81 submitper aborehole
    The closurenumber reportof coveringmine theentries workto undertaken.be Weinvestigated willor sendtreated, anwhen acknowledgementnot letterincluded andin considerthe Healtharea andcharge£162£4,056£162 Safetyper Executiveshaft adviceor beforeadit grantinginvestigation aor permit.

    Timetreatment

    The andnumber materialof charges

    Ifmine weentries requestto be treated, when not included in the samearea informationcharge

    £162£4,056£162 moreper thanshaft twiceor andadit spendinvestigation additionalor timetreatment
    Application onincluding yourmine application,entry weand willtreatmentAggregate chargefees for timeeach andshaft materialsor atadit currentto Miningbe Remediationinvestigated Authorityor rates.treated£4,080Aggregate Wefees willfor invoiceeach theseshaft onor aadit case-by-caseto basis.

    Timebe andinvestigated materialor chargestreated

    Application alsofor applywater resources consents relating to permitcapital projectflood work.

    risk projects
    £162£4,056Charged for at same rate as standard permit applications

    Water
    Other resourcesfeesCost
    Administration fee for minor changes and floodadding defenceinvestigation consentsfor unrecorded mining features£72
    Application fee for permit extension£156

    ConsentsThese forfee capitalrates floodreflect defencethe infrastructurecosts areof chargedthe atservices that the samePermissions rateTeam asprovides, standardin line with the principles in Managing Public Money May 2023 document.

    The Mining Remediation Authority permit applications.permissions team is committed to restricting its costs as far as possible and is not permitted to make any profit from its fees.

    ContactIf usyou need help with your application

    Contact the Mining Remediation Authority Permitting and Licensing team.

    LicensingPermitting and PermissionsLicensing team

    Mining Remediation Authority
    200 Lichfield Lane
    Mansfield
    Nottinghamshire
    NG18 4RG

    Monday to Thursday: 8:45am to 5:00pm
    Friday: 8:45am to 4:30pm

Updates to this page

Published 12 August 2021
Last updated 1 April 20262025 + show all updates
  1. Updated to include detailed costs for applying for a permit to deal with coal or coal mines.

Sign up for emails or print this page

Update history

2026-04-01 07:00
Updated permit fees for April 2026 and new guidance checklists have been added to the page to explain the documents users are required to submit when applying for a permit.

2025-04-01 06:00
Updated to include detailed costs for applying for a permit to deal with coal or coal mines.