Proposed refinements for Allocation Round 8 and future rounds
- From:
- Department for Energy Security and Net Zero
- Published
- 16 December 2025
- Last updated
-
201MarchJune 2026 — See all updates
Applies to England, Scotland and Wales
Read the full outcome
Government response to legislativethe proposals on proposed refinements for Allocation Round 8 and future allocation rounds
This
PDF, document373 setsKB, out46 thepages
We
Detail willof publishoutcome
Government a separate government response settingto outlegislative ourproposals decisions on theproposed otherrefinements measuresfor proposedAllocation inRound the8 consultation.
and future rounds
Following the consultation, we will amend the Contracts for Difference (Allocation) Regulations 2014 to allow NESO to correct certain types of delivery body errors and to consider new documentary evidence or information when examining ‘Tier 1’ appeals in respect of non-qualifying applications.
The Allocation Regulations are also being amended to clarify the treatment of pending applications in light of operational experience from Allocation Round 7 (AR7) held in 2025.
Detail of feedback received
We received 79 responses to this part of the consultation, with the majority coming from industry (trade associations, renewables developers and supply chain companies) and a small number from public bodies, investors and individuals.
The overall stakeholder response was very positive, with high levels of support for several proposals.
Original consultation
Summary
We're seeking views on several refinements to ensure that the CfD continues to reflect current policy and that the scheme continues to function as originally intended.
This consultation ran from
to
Consultation description
This consultation seeks views on proposed refinements to the Contracts for Difference (CfD) contract terms in advance of Allocation Round 8 (AR8). The proposals in this consultation cover a range of areas, including:
- policy on surrendered CfD capacity – making permanent the restriction on bidding previously surrendered capacity into future rounds to protect auction integrity and deployment timelines
- hybrid metering for single technology/ multiple commercial arrangements – enabling CfD and merchant assets of the same technology to share metering infrastructure, reducing costs
- contractual changes for floating offshore wind (FLOW) – extending the Longstop Period and reducing the Required Installed Capacity threshold to reflect the scale and complexity of future projects
- introducing a new technology category for Other Deepwater Offshore Wind (ODOW) – enabling innovative foundation designs for deepwater sites to compete for CfD support
- changes to improve scheme efficiency – proposed legislative amendments to allow the National Energy System Operator (NESO) to correct errors made during the assessment of CfD applications and consider new documentary evidence to clarify non-material errors and omissions in applications, and minor adjustments to improve administration of the pending applications process
- strengthening Unilateral Commercial Operations Notice (UCON) provisions – improving metering access and enforcement to prevent distribution-connected generators from delaying CfD start dates and operating on a merchant basis at elevated wholesale prices
- excluding applications with Gate 1 connection offers – aligning CfD eligibility with grid connection reforms to prioritise projects with firm connection dates
- visibility of sealed bids – changing our approach on the ability of the Secretary of State to see bids for AR8
- minor and technical changes to the CfD contract terms to update the CPI inflation factor and amend the definition of Inside Information
- in addition, to provide a policy update on fixing the appeals timeline
Together, these reforms are designed to maintain investor confidence, support timely delivery of renewable capacity, and ensure the CfD remains fit for purpose as projects scale up in size and complexity.
The proposed drafting changes are shown as tracked amendments in the CfD contract documents, published alongside the consultation document. We welcome responses from anyone with an interest in the proposals, in particular those considering participating in AR8.
Read our consultation privacy notice.
Documents
Proposed refinements for Allocation Round 8 and future rounds: consultation document
PDF, 374 KB, 41 pages
DRAFT: Contracts for Difference Allocation Round 8 (Phase 1): Agreement (Apportioned)
PDF, 365 KB, 49 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.
DRAFT: Contracts for Difference Allocation Round 8: Agreement (Generic)
PDF, 236 KB, 33 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.
DRAFT: Contracts for Difference Allocation Round 8: Standard Terms and Conditions
PDF, 3.9 MB, 592 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.
Share this page
The following links open in a new tab
Updates to this page
Published 16 December 2025
Last updated 201 MarchJune 2026
+ show all updates
-
Published the second part of the government response for this consultation.
-
Published the first part of the government response for this consultation.
-
First published.
Sign up for emails or print this page
Government response to legislativethe proposals on proposed refinements for Allocation Round 8 and future allocation rounds
This
PDF, document373 setsKB, out46 thepages
We
Detail willof publishoutcome
Government a separate government response settingto outlegislative ourproposals decisions on theproposed otherrefinements measuresfor proposedAllocation inRound the8 consultation.
Following the consultation, we will amend the Contracts for Difference (Allocation) Regulations 2014 to allow NESO to correct certain types of delivery body errors and to consider new documentary evidence or information when examining ‘Tier 1’ appeals in respect of non-qualifying applications.
The Allocation Regulations are also being amended to clarify the treatment of pending applications in light of operational experience from Allocation Round 7 (AR7) held in 2025.
Detail of feedback received
We received 79 responses to this part of the consultation, with the majority coming from industry (trade associations, renewables developers and supply chain companies) and a small number from public bodies, investors and individuals.
The overall stakeholder response was very positive, with high levels of support for several proposals.
Original consultation
Summary
We're seeking views on several refinements to ensure that the CfD continues to reflect current policy and that the scheme continues to function as originally intended.
This consultation ran from
to
Consultation description
This consultation seeks views on proposed refinements to the Contracts for Difference (CfD) contract terms in advance of Allocation Round 8 (AR8). The proposals in this consultation cover a range of areas, including:
- policy on surrendered CfD capacity – making permanent the restriction on bidding previously surrendered capacity into future rounds to protect auction integrity and deployment timelines
- hybrid metering for single technology/ multiple commercial arrangements – enabling CfD and merchant assets of the same technology to share metering infrastructure, reducing costs
- contractual changes for floating offshore wind (FLOW) – extending the Longstop Period and reducing the Required Installed Capacity threshold to reflect the scale and complexity of future projects
- introducing a new technology category for Other Deepwater Offshore Wind (ODOW) – enabling innovative foundation designs for deepwater sites to compete for CfD support
- changes to improve scheme efficiency – proposed legislative amendments to allow the National Energy System Operator (NESO) to correct errors made during the assessment of CfD applications and consider new documentary evidence to clarify non-material errors and omissions in applications, and minor adjustments to improve administration of the pending applications process
- strengthening Unilateral Commercial Operations Notice (UCON) provisions – improving metering access and enforcement to prevent distribution-connected generators from delaying CfD start dates and operating on a merchant basis at elevated wholesale prices
- excluding applications with Gate 1 connection offers – aligning CfD eligibility with grid connection reforms to prioritise projects with firm connection dates
- visibility of sealed bids – changing our approach on the ability of the Secretary of State to see bids for AR8
- minor and technical changes to the CfD contract terms to update the CPI inflation factor and amend the definition of Inside Information
- in addition, to provide a policy update on fixing the appeals timeline
Together, these reforms are designed to maintain investor confidence, support timely delivery of renewable capacity, and ensure the CfD remains fit for purpose as projects scale up in size and complexity.
The proposed drafting changes are shown as tracked amendments in the CfD contract documents, published alongside the consultation document. We welcome responses from anyone with an interest in the proposals, in particular those considering participating in AR8.
Read our consultation privacy notice.
Documents
Proposed refinements for Allocation Round 8 and future rounds: consultation document
PDF, 374 KB, 41 pages
DRAFT: Contracts for Difference Allocation Round 8 (Phase 1): Agreement (Apportioned)
PDF, 365 KB, 49 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
DRAFT: Contracts for Difference Allocation Round 8: Agreement (Generic)
PDF, 236 KB, 33 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
DRAFT: Contracts for Difference Allocation Round 8: Standard Terms and Conditions
PDF, 3.9 MB, 592 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.
Share this page
The following links open in a new tab
Updates to this page
-
Published the second part of the government response for this consultation.
-
Published the first part of the government response for this consultation.
-
First published.
Sign up for emails or print this page
Update history
2026-06-01 11:31
Published the second part of the government response for this consultation.
2026-03-20 09:30
Published the first part of the government response for this consultation.
2025-12-16 10:00
First published.