Guidance

New nuclear power stations: assessing reactor designs

The Environment Agency’s Generic Design Assessment (GDA) of new nuclear power station designs and how we engage with others during the process.

Applies to England and Wales

Update history

2025-12-11 09:45
Updated to reflect the progress of the GE Vernova Hitachi Nuclear Energy, Holtec International, and Rolls Royce reactor Generic Design Assessments (GDAs). Added links to the latest information from government and the regulators.

2024-12-12 10:15
Updated the sections about GE-Hitachi’s BWRX-300 small modular reactor, as the regulators have completed Generic Design Assessment Step 1 and begun Step 2. Updated the ‘Modernised GDA process and updated guidance’ section to list the companies that have entered the early engagement process.

2024-08-01 10:35
Added a summary of the latest information on ‘Holtec International – SMR-300 small modular reactor’ and ‘Rolls-Royce SMR Limited – 470MWe small modular reactor’. Added a link to new joint regulatory guidance for developers and designers about early engagement before entering into generic design assessment and permitting. Added a link to a report from the regulators, partners and Sciencewise about public views toward the siting and deployment of advanced nuclear technologies. Updated the ‘Contacts’ section to remove reference to the joint e-bulletin, as this is no longer available.

2024-01-25 13:06
Added information about the Generic Design Assessment on GE-Hitachi Nuclear Energy’s BWRX-300 small modular reactor.

2023-12-22 12:22
Added information about the Generic Design Assessment for Holtec International’s SMR-300 small modular reactor.

2023-04-03 16:22
Added a link to the latest blog – Taking the Rolls-Royce Small Modular Reactor (SMR) to the next step.

2023-04-03 09:29
Updated with information about completing Step 1 and starting Step 2 of GDA on Rolls-Royce SMR Ltd’s 470MWe Small Modular Reactor.

2022-05-10 14:41
Added a ‘latest news’ section as highlights of recent activity. Added a section on ‘Rolls-Royce SMR Ltd – 470MWe Small Modular Reactor’ to the ‘Ongoing and completed GDAs’ section.