Local authorities can apply for funding to help with the costs of procurement and installation of on-street charging points for residential use.
This guidance explains:
- who can apply for the funding
- how much funding is available
- the application process and timetable
- the minimum technical specifications required for on-street electric vehicle chargepoint infrastructure
Last updated 5 April 2022 + show all updates
-
The scheme funding amount has changed to a maximum of 60% of project capital costs. Guidance added on the minimum payment method requirement and changes that mean chargepoints may be installed on land not owned by a local authority on a discretionary basis.
-
Addition of fire safety guidance.
-
Updated guidance increasing funding per chargepoint unit to £13,000, removing project size requirements, clarifying expectations regarding installations in local authority-owned car parks, and stating that projects with a completion date no later than 31 March 2023 will be considered.
-
Changes to the grant payment process.
-
Guidance has been revised to include changes to the grant cap per chargepoint, and our approach to allocating funding.
-
Updated to provide clearer guidance to local authorities on eligibility when applying for funding.
-
Guidance revised for additional funding.
-
First published.