Oil and gas: decommissioning of offshore installations and pipelines
Decommissioning programmes, including dates, locations, installations decommissioned, method of decommissioning and close-out reports where available.
Overview
The decommissioning of offshore oil and gas installations and pipelines on the United Kingdom Continental Shelf (UKCS) is controlled through the Petroleum Act 1998.
The responsibility for ensuring that the requirements of the Petroleum Act 1998 are complied with rests with the Offshore Petroleum Regulator for Environment and Decommissioning (OPRED) which sits within the Department for Business, Energy and Industrial Strategy.
Owners of oil and gas installations and pipelines are required to decommission their offshore infrastructure at the end of a field’s economic life and the 1998 Act requires owners to set out the measures to decommission disused installations and/or pipelines in a decommissioning programme.
A decommissioning programme must identify all the items of equipment, infrastructure and materials that have been installed or drilled and describe the decommissioning solution for each.
OPRED aims to be transparent in its consideration of decommissioning programmes. As a result members of the public, other organisations, non-governmental organisations and other government departments or agencies are invited to comment on the proposals set out in a programme.
Details of the current programmes under consideration are noted in the table below.
OPRED provides guidance on the regulatory requirements for decommissioning. Final guidance on the Environmental Considerations for Decommissioning (Section 12) has now been incorporated into the guidance notes
.Consultation on our Financial Assurance Guidance for the Decommissioning of Offshore Oil and Gas Installations and Pipelines concluded on 31 March 2019. Comments are being addressed and a final draft will be published in due course.
The guidance outlines how the government assesses the financial capability of persons with a relevant interest in or considering taking an interest in an offshore oil or gas field. For the purposes of satisfying the Secretary of State that that person will be capable of carrying out a decommissioning programme in relation to that interest.
It explains our financial assurance policy and existing processes setting out the steps taken to assess the financial health of offshore oil and gas companies with an interest or potential interest in a field, outlining how and when we may use the statutory powers set out in the Petroleum Act 1998.
If you have any comments or questions relevant to the guidance, please email us at odu@beis.gov.uk.
Proposed changes to charging a fee in respect of decommissioning offshore (oil and gas) installations and pipelines under the Petroleum Act 1998 as amended by the Energy Act 2008
The aim of this consultation is to formally seek views from stakeholders such as offshore oil and gas operators, companies with an interest in decommissioning offshore oil and gas installations and pipelines, and other interested parties, on the proposal to update the charging regime for activity related to the regulatory functions for the decommissioning of offshore oil and gas installations.
To provide your response, please complete the consultation response form below and e-mail it to odu@beis.gov.uk.
The deadline for responses is 16 August 2021.
Draft decommissioning programmes under consideration
Decommissioning | Main points of DP |
documents | ||||||
---|---|---|---|---|---|---|---|---|
Johnston | Premier OIl E&P UK EU Limited | Subsea installations will be recovered to shore for recycling and disposal. Trenched and buried rigid flowlines will be left in situ with exposed ends remediated with rock. Trenched and buried flexible flowlines, umbilicals, spool pieces and jumpers will be removed. | ||||||
Scoter and Merganser | Shell UK Limited | Subsea installations will be recovered to shore along with surface laid spools and jumpers. Buried pipelines will be left in situ. | ||||||
Chrysaor Production (U.K.) Limited | ||||||||
Chrysaor Production (U.K.) Limited | ||||||||
Chrysaor Production (U.K.) Limited | ||||||||
Saltire A Topsides and Saltire Area Subsea Infrastructure |
Repsol Sinopec Resources UK Limited | The topsides will be transported ashore for dismantling, refurbished for reuse |
||||||
Foinaven FPSO Offstation |
Britoil Limited | Removal of FPSO |
||||||
Hewett Area Subsea Installations | Eni UK Limited | Subsea installations will be fully removed and recovered to shore for reuse, recycling or disposal | ||||||
Causeway and Fionn | Ithaca Energy (UK) Limited | |||||||
Sean | ONE-Dyas UK Limited | |||||||
Chrysaor Production (U.K.) Limited | Topsides | |||||||
Chrysaor Production (U.K.) Limited | Topsides | |||||||
Dunlin Alpha |
Fairfield Betula Limited | Decommissioning in situ of Dunlin Alpha concrete gravity based structure and storage cells. | ||||||
Brae Alpha, Brae Bravo, Central Brae, West Brae and Sedgwick | Marathon Oil UK LLC |
Removal of Brae Alpha and Brae Bravo jackets to the top of the footings. |
||||||
Brent | Shell U.K. Limited | Decommissioning in situ of Brent Bravo, Charlie and Delta concrete gravity based structures. |
|
|||||
Atlantic and Cromarty | BG Global Energy Limited and Hess Limited | Manifold and WHPS |
Approved decommissioning programmes
Decommissioning | Operator at approval | Operator following licence / company change | Approved | Year | Close out report | Year close |
||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Spirit Energy North Sea Oil Limited | - | FPSO, mooring suction anchors and risers Removal to shore for either re-use or recycling | March 2022 | |||||||||
NEO | - | April |
||||||||||
Alpha |
||||||||||||
- |
Platform, |
February 2022 | ||||||||||
TAQA Bratani Limited | - | Topsides | Recovered to shore for reuse/recycling |
February 2022 | ||||||||
Premier Oil UK Limited | - | Subsea installations, | ||||||||||
Trenched and buried rigid pipelines will be left in situ. |
February 2022 | |||||||||||
EnQuest Heather Limited | - | Recovery of topsides to shore for reuse, |
December 2021 | |||||||||
Perenco UK Limited | - | Recovery of topsides to shore for reuse, |
December 2021 | |||||||||
CNR International (U.K.) Limited | - | Subsea installations, | ||||||||||
Trenched pipelines will be left in situ. |
November 2021 | |||||||||||
- | Installations | |||||||||||
August 2021 | ||||||||||||
- | Installations, | |||||||||||
August 2021 | ||||||||||||
Repsol Sinopec Resources UK Limited | - | Removal | ||||||||||
Trenched and buried |
July 2021 | |||||||||||
EnQuest Heather Limited | - | Recovery of topsides to shore for reuse, |
July 2021 | |||||||||
- | Removal of installations to shore for recycling or reuse. | |||||||||||
June 2021 | ||||||||||||
|
A/S Norske Shell | - | Full removal of SSIV, full removal of risers. |
May 2021 | ||||||||
|
Equinor Energy AS | - | Majority of pipeline will be left in situ with rock placement over spans/exposures. 20m surface laid section of pipeline out with the existing trench to be removed and recovered to shore. |
April 2021 | ||||||||
Premier Oil E&P UK Limited | - | Subsea installations, | ||||||||||
Trenched and buried pipelines, |
April 2021 | |||||||||||
- | Removal | |||||||||||
April 2021 | ||||||||||||
INEOS UK SNS Limited | - | Removal | ||||||||||
The pipelines will be partially removed, the exposed sections adjacent to the platforms will be removed and recycled or disposed onshore. The exposed ends will be lowered to achieve adequate depth of coverage. The existing buried sections of umbilical will be left in situ. All concrete mattresses and grout bags will be recovered to shore for reuse, recycling or disposal. | March 2021 | |||||||||||
|
ENI Hewett Limited | - | All 6 platforms will be removed and returned to shore for processing/recycling or disposal | March 2021 | ||||||||
Repsol Sinopec Resources UK Limited | - | Subsea | ||||||||||
Buried and stable pipelines will be left in situ. |
March 2021 | |||||||||||
Premier Oil E&P UK Limited | - | Subsea installations, | ||||||||||
Trenched and buried rigid, stable pipelines will be left in situ. |
March 2021 | |||||||||||
Submitted jointly by Qualimar Shipping Company Limited and EnQuest Heather Limited | - | Removal for reuse, | ||||||||||
Mooring and | ||||||||||||
Pipeline sections and exposed mattresses within the 500m safety zone | March 2021 | |||||||||||
Premier Oil E&P UK Limited | - | The Balmoral FPV will be towed to a suitable location for re-sale, reuse, | ||||||||||
The mooring chains will be recovered to the point of burial at the anchor pile. | ||||||||||||
Subsea | ||||||||||||
Trenched and buried rigid, stable pipelines will be left in situ. |
February 2021 | |||||||||||
Premier Oil E&P UK Limited | - | Subsea | ||||||||||
Trenched and buried rigid, stable pipelines will be left in situ. |
February 2021 | |||||||||||
Premier Oil E&P UK Limited | - | Subsea | ||||||||||
Trenched and buried rigid, stable pipelines will be left in situ. |
February 2021 | |||||||||||
Premier Oil E&P UK Limited | - | Subsea | ||||||||||
Trenched and buried rigid, stable pipelines will be left in situ. |
February 2021 | |||||||||||
Premier Oil E&P UK Limited | - | Trenched and buried rigid, stable pipelines will be left in situ. |
February 2021 | |||||||||
INEOS UK SNS Limited | - | |||||||||||
The Trenched and Buried, stable pipeline and umbilical will both be left in situ. |
February 2021 | |||||||||||
|
TAQA Bratani Limited | - | Removal to shore for recycling or reuse |
November 2020 | ||||||||
|
TAQA Bratani Limited | - | Removal to shore for recycling or reuse |
November 2020 | ||||||||
Repsol Sinopec North Sea Limited | - | November 2020 | ||||||||||
RockRose UKCS8 LLC | TAQA |
Removal of | ||||||||||
Removal to shore of surface laid pipelines. Trenched and buried pipelines to remain in situ | September 2020 | |||||||||||
Shell U.K. Limited | - | July 2020 | ||||||||||
Perenco UK Limited | - | July 2020 | ||||||||||
Ithaca Energy UK Limited | Removal | |||||||||||
Pipelines | |
June 2020 | ||||||||||
Lundin Energy Norway AS |
- | June 2020 | ||||||||||
TAQA Bratani Limited | - | Removal of drilling derrick structure and installation of modular drilling rig to facilitate well P&A | June 2020 | |||||||||
INEOS UK SNS Limited | - | Removal to shore | ||||||||||
Partial removal of pipelines (buried sections left it situ). |
June 2020 | |||||||||||
CNR International (U.K.) Limited. |
- | Removal of FPSO and FSO | ||||||||||
The STL Buoy and associated mooring lines will be removed to shore for recycling. | ||||||||||||
Associated riser sections and umbilicals within the water column will be removed to shore for recycling |
May 2020 | May 2021 | ||||||||||
TAQA Bratani Limited | - | Removal of topsides to shore for recycling or reuse |
May 2020 | |||||||||
Chrysaor Production (U.K.) Limited | - | Removal of | ||||||||||
May 2020 | ||||||||||||
Chrysaor Production (U.K.) Limited | - | Removal of topsides to shore for recycling or reuse. |
April 2020 | |||||||||
Premier Oil E&P UK Limited | - | The Huntington FPSO (Voyageur Spirit) is to be floated off station and redeployed. | ||||||||||
The risers |
April 2020 | |||||||||||
Chrysaor Production (U.K.) Limited | - | Topsides and Jacket and associated sections of pipeline risers attached to the Caister platform | March 2020 | |||||||||
EnQuest Heather Limited | - | Removal of FPSO to shore for recycling. | ||||||||||
Partial removal of the mooring anchor piles. The mooring chain will be cut locally to the mooring pile and buried to 1m below seabed. |
March 2020 | |||||||||||
|
|
|||||||||||
Shell U.K. Limited | - | Removal to shore for recycling/disposal, trench/backfill, buried pipelines left in situ | March 2020 | |||||||||
EnQuest Heather Limited | - | Removal | January 2020 | |||||||||
CNR International (U.K.) Limited. Decommissioning Programmes submitted by Teekay Petrojarl Floating Production UK Ltd. | - | Removal | ||||||||||
Part of pipeline to be returned to shore for recycling | November 2019 | May 2021 | ||||||||||
Chrysaor Production (U.K.) Limited |
- | The anchors will be decommissioned in situ. All other installations and pipelines will be removed to shore for either reuse |
November 2019 | |||||||||
|
|
|||||||||||
Shell U.K. Limited | - | Removal of | ||||||||||
November 2019 | ||||||||||||
RockRose Energy UKCS8 LLC | TAQA | Removal of the drilling rig to shore for recycling or disposal | September 2019 | |||||||||
Spirit Energy Production UK Limited | - | Removal | ||||||||||
Buried and stable pipelines left in situ, exposed pipeline ends cut and recovered to shore for either reuse |
September 2019 | |||||||||||
Perenco Gas (UK) Limited | - | Removal | September 2019 | |||||||||
Neptune E&P UKCS Limited | - | Removal of | ||||||||||
September 2019 | ||||||||||||
DNO North Sea (ROGB) Limited | - | Topsides, jackets and subsea installation | ||||||||||
Trenched and buried pipelines |
August 2019 | |||||||||||
Neptune E&P UKCS Limited | - | Removal to shore of | ||||||||||
August 2019 | ||||||||||||
Fairfield Betula Limited | - | Trenched sections will be left in situ, exposed pipeline ends cut and recovered and severed ends rock dumped | July 2019 | February 2021 | ||||||||
CNR International (U.K.) Limited | - | Topsides and jacket to top of footings to be removed to shore for recycling/disposal. Footings to remain in situ. | June 2019 | |||||||||
Apache Beryl I Limited | - | Removal | June 2019 | |||||||||
Fairfield Betula Limited | - | Removal | May 2019 | |||||||||
Eni Hewett Limited | ENI UK Limited | removal of Vent Stack & other preparatory works | April 2019 | |||||||||
Perenco Gas (UK) Limited | - | removal of Telecommunication towers, sub-cellar deck equipment, appurtenances, caissons, associated tanks and lift pumps, supply hoses, a pipeline riser emergency shutdown valve and tertiary steelwork | March 2019 | |||||||||
Shell U.K. Limited | - | FPSO, | ||||||||||
March 2019 | ||||||||||||
ConocoPhillips (U.K.) Limited | - | all | ||||||||||
Pipelines | January 2019 | |||||||||||
ConocoPhillips (U.K.) Limited | - | |||||||||||
Pipelines | January 2019 | |||||||||||
Perenco UK Limited | - | Topsides, jacket and subsea installation | January 2019 | |||||||||
Perenco UK Limited | - | Topsides and jacket | January 2019 | |||||||||
Repsol Sinopec Resources UK Limited | - | |||||||||||
Buried pipelines will be left in situ. Remediation for any exposed sections |
January 2019 | |||||||||||
Spirit Energy Production UK Limited | - | Subsea Installation | ||||||||||
Pipelines | January 2019 | |||||||||||
Ithaca Energy (UK) Limited | - | Wellhead Platform and Midline Tee Structure | ||||||||||
Pipelines | October 2018 | |||||||||||
Marathon Oil UK LLC | TAQA Bratani Limited |
Brae Bravo Topsides, Flare Bridge, Flare Tower and Flare Jacket/Substructure | August 2018 | |||||||||
Shell U.K. Limited | - | Topsides | August 2018 | |||||||||
Premier Oil E&P UK Limited | - | Subsea installation removed to shore for recycling | May 2018 | February |
||||||||
Spirit Energy North Sea Limited | - | |||||||||||
Buried and stable pipelines left in situ. |
April 2018 | |||||||||||
Spirit Energy North Sea Limited | - | |||||||||||
Buried and stable pipelines left in situ. |
April 2018 | |||||||||||
Spirit Energy North Sea Limited | - | Topsides | ||||||||||
Buried and stable pipelines left |
April 2018 | |||||||||||
Repsol Norge AS | - | Buried | April 2018 | |||||||||
Centrica Production Nederland B.V. | Spirit Energy Nederland B.V. | |||||||||||
February 2018 | ||||||||||||
July 2021 | ||||||||||||
Fairfield Fagus Limited | - | |||||||||||
Full removal with the exception of the Bundles, Umbilical Risers within the Dunlin Alpha Concrete Gravity Based Structure or those trenched, |
December 2017 | |||||||||||
January 2021 | ||||||||||||
Fairfield Fagus Limited | - | |||||||||||
Full removal with the exception of trenched and rock dumped pipelines |
December 2017 | January 2021 | ||||||||||
Fairfield Fagus Limited | - | |||||||||||
Full removal with the exception of trenched and rock |
December 2017 | January 2021 | ||||||||||
ConocoPhillips (U.K.) Limited | - | All pipelines and associated mattresses to remain in situ. |
November 2017 | |||||||||
ConocoPhillips (U.K.) Limited | - | Topsides | ||||||||||
All pipelines and associated mattresses to remain in situ. |
November 2017 | |||||||||||
Shell U.K. Limited | - | Topside and jacket removed to shore for reuse/recycling. | April 2017 | |||||||||
Nexen Petroleum U.K |
- | FPSO | ||||||||||
Subsea equipment | ||||||||||||
March 2017 | ||||||||||||
Centrica North Sea Limited | - | WHPS | February 2017 | |||||||||
Maersk Oil UK Limited | - | FPSO | ||||||||||
Subsea equipment | ||||||||||||
September 2016 | ||||||||||||
Ithaca Energy (UK) Limited | - | FPSO | ||||||||||
Subsea equipment | ||||||||||||
All pipelines |
September 2016 | |||||||||||
ConocoPhillips (U.K.) Limited | - | Topsides | September 2016 | |||||||||
Maersk Oil North Sea UK Limited | - | FPSO | ||||||||||
Removal of 2 x bundle towheads and mid-line structure to shore for disposal; removal of 2 x drill centres to shore for disposal. | ||||||||||||
2 x pipeline |
March 2016 | |||||||||||
TAQA Bratani Limited | - | Harding Submerged Turret Loading (STL) System | December 2015 | June 2017 | ||||||||
Tullow Oil SK Limited | - | Removal of topsides and jackets to shore for recycling/disposal. | ||||||||||
Pipelines | November 2015 | |||||||||||
Tullow Oil SK Limited | - | Removal of subsea installations to shore for recycling/disposal. | ||||||||||
Pipelines | November 2015 | |||||||||||
Tullow Oil SK Limited | - | Removal of subsea installations to shore for recycling/disposal. | ||||||||||
Pipelines | November 2015 | |||||||||||
Perenco UK Limited | - | Removal of topsides and jackets to shore for recycling/disposal. | ||||||||||
Removal of subsea installations to shore for recycling/disposal. | ||||||||||||
Pipelines | October 2015 | |||||||||||
Perenco UK Limited | - | Removal of subsea installations to shore for recycling/disposal. | ||||||||||
Pipelines | October 2015 | |||||||||||
Perenco UK Limited | - | Removal of subsea installations to shore for recycling/disposal. | ||||||||||
Pipelines | October 2015 | |||||||||||
Shell U.K. Limited | - | July 2015 | ||||||||||
February 2020 | ||||||||||||
Centrica Resources Limited | - | Removal of subsea installations to shore for recycling/disposal. | ||||||||||
Removal of sections of untrenched |
May 2015 | |||||||||||
October 2018 | ||||||||||||
Centrica North Sea Gas Limited | - | Removal of subsea installations to shore for recycling/disposal. | ||||||||||
Removal of sections of untrenched |
April 2015 | February 2019 | ||||||||||
CNR | - | Removal | ||||||||||
Export pipeline to |
August 2014 | |||||||||||
Endeavour Energy UK Limited | - | Removal of subsea installations to shore for recycling/disposal. Selective recovery of pipelines. | April 2014 | |||||||||
BP Exploration (Alpha) Limited |
- |
Footings to remain in situ. |
December 2013 | |||||||||
Britoil Limited | - | |||||||||||
April |
||||||||||||
May 2019 | ||||||||||||
Hess Limited |
||||||||||||
Removal of subsea installations to shore for recycling/disposal. | ||||||||||||
Selective recovery of pipelines. | February 2013 | |||||||||||
December 2015 | ||||||||||||
Energy Resource Technology (UK) Limited | - | Removal | ||||||||||
Pipelines | June 2012 | |||||||||||
August 2013 | ||||||||||||
Hess Limited | - | FPSO | ||||||||||
Removal of subsea installations to shore for recycling/disposal. |
February 2012 | |||||||||||
December 2014 |
||||||||||||
Don (PDF, 8 MB, 175 pages) | Britoil Public Limited Company | - | Removal | |||||||||
Pipelines | May 2011 | |||||||||||
Perenco UK Limited | - | Removal of | ||||||||||
September |
September 2020 | |||||||||||
4.11 |
Silverstone Energy Limited | Bridge Energy UK Limited | Removal | |||||||||
Production pipeline with piggy-backed umbilical - leave in situ; jumpers, spool pieces and associated pipeline equipment - remove to shore for re-use or recycling. |
August |
January 2011 | ||||||||||
3.23 |
Premier Oil | - | ||||||||||
June 2010 |
||||||||||||
4.28 |
Venture North Sea Oil Limited | - | ||||||||||
June |
July 2012 | |||||||||||
Total E&P |
- | Concrete | September |
March 2013 | ||||||||
Venture North Sea Oil Limited | - | Exposed Location Single Buoy Mooring System (ELSBM) | May 2008 | |||||||||
Mobil North Sea LLC | - | Removal of | ||||||||||
July |
||||||||||||
November 2013 | ||||||||||||
Shell UK |
- | Removal | ||||||||||
May 2007 | ||||||||||||
December 2014 | ||||||||||||
Amoco (U.K.) Exploration Company - now a subsidiary of BP plc | - | Footings to remain in place, steel topsides and jacket to top of footings to be removed to shore. Pipelines to remain in situ. |
February 2006 | |||||||||
October 2014 |
||||||||||||
Ardmore | British American Offshore Limited | - | Mobile Jack-Up rig removed for reuse. |
2005 |
|
|||||||
Ardmore | Ugland Nordic Shipping AS | - | Single Anchor Loading Systems | 2005 | ||||||||
|
|
|||||||||||
Ardmore | Acorn Oil & Gas Limited | - | Subsea equipment including guide frame | 2005 | ||||||||
Shell | - | Brent Flare | 2004 | |||||||||
Beatrice | Talisman Energy (UK) Limited | - | Platforms |
2004 |
|
|||||||
Forbes and Gordon |
BHP Billiton | - | 2003 | - | ||||||||
Total E&P Norge AS | - | May 2003 | May 2011 | |||||||||
Durwood |
Amerada Hess | - | Pipelines | 2002 | ||||||||
Hutton | Kerr McGee | - | Tension Leg Platform | |||||||||
1 pipeline |
2002 | - | ||||||||||
Camelot CB | ExxonMobil | - | 2001 |
|||||||||
Blenheim and Bladon | Talisman | - | FPSO to be removed for reuse. Pipelines to be removed to shore. | 2000 | ||||||||
|
|
|||||||||||
Durwood | Amerada Hess | - | FPSO to be removed for reuse. | |||||||||
Subsea facilities | 2000 | |||||||||||
Maureen and Moira | Phillips | - | Platform | |||||||||
Concrete Loading Column | ||||||||||||
2 pipelines |
2000 | |||||||||||
Brent Spar | Shell | - | Oil Storage and Loading Facility | |
||||||||
Donan | BP | - | FPSO to be removed for reuse. | 1998 |
|
|||||||
Fulmar SALM | Shell | - | Single Anchor Leg Mooring Buoy | |||||||||
1998 | ||||||||||||
Emerald | MSR | - | FPSO to be removed for reuse. Pipeline to be left in situ. | 1996 | ||||||||
|
|
|||||||||||
Frigg FP | Elf Norge | TotalFinaElf Norge | Flare column | 1996 | ||||||||
Leman BK | Shell | - | Platform | 1996 | ||||||||
Staffa | Lasmo | - | Pipeline | 1996 | ||||||||
Viking AC, AD, AP & FD | Conoco | - | Platforms | 1996 | ||||||||
Esmond CP & CW | BHP | - | Platforms | 1995 | ||||||||
Gordon BW | BHP | - | Platform | 1995 | ||||||||
Angus | Amerada Hess | - | FPSO |
1993 |
|
|||||||
Forbes AW | Hamilton | BHP | Platform | 1993 | ||||||||
Argyll, Duncan and Innes | Hamilton | BHP | FPSO | |||||||||
Catenary Anchor Leg Mooring (CALM) Buoy | 1992 | |||||||||||
|
|
|||||||||||
Blair | Sun Oil | AGIP | 1 pipeline |
1992 | ||||||||
Crawford | Hamilton Oil | BHP | FPF | |||||||||
Catenary Anchor Leg Mooring (CALM) Buoy | ||||||||||||
Subsea facilities | 1991 | |||||||||||
Piper Alpha | Occidental | Talisman | Platform |
1988 |
|
Notification of disused pipelines
(the DPN form to take pipeline(s) out of use is currently being updated. A copy can be made available on request at odu@beis.gov.uk)
During the course of a field’s life, pipelines/sections of pipelines may be taken out of use, e.g. due to corrosion, problems with reservoir pressure, damage to the pipeline, etc. When this happens, under the Petroleum Act 1998 the Secretary of State has the option of immediately calling for a full decommissioning programme. This is not always considered an appropriate option however, and so it has been agreed consideration will be given to handling suitable pipelines, under an informal decommissioning regime, thereby deferring a formal programme until the end of the field’s life.
If a formal decommissioning programme is not immediately deemed suitable, details of the out of use pipeline(s) will be circulated to other government departments for comment. Following this, OPRED will decide one of the following:
- we are content with the proposals for monitoring and maintaining the out-of-use pipeline
- we request additional information or further remedial action
- we request a formal decommissioning programme
The Interim Pipeline Regime is intended to ensure out of use lines do not pose a risk to other users of the sea or the environment and that they are covered by an appropriate surveying and maintenance regime from the point when they are taken out of use until approval of the formal decommissioning programme, which is usually at the end of field life. It should be noted that any interim solution should not prejudice the final decommissioning options for that line, including complete removal. The department expects operators to submit details of out of use pipelines/sections of a pipeline as soon as they are taken out of use.
Operators are reminded that any works that are proposed on any pipelines under the Pipeline Works Authorisation regime, as per their Terms and Conditions of the PWA, must have a legal consent in place before works can commence which includes but is not exclusive to any proposed decommissioning works. Consents are issued by the Oil & Gas Authority and operators are requested to email consents@ogauthority.co.uk on any queries that they may have relating to legal consents. Further guidance can also be found on the Oil & Gas Authority website.
Once the necessary legal consent has been issued by OGA, Consents & Authorisations Section, Operators are to email a completed DPN form to odu@beis.gov.uk.
If you are an operator, aware of any out of use pipelines that have not been referred to the department, please submit a completed DPN form at your earliest convenience.
Following confirmation a pipeline has been accepted under the Interim Pipeline Regime, the Offshore Decommissioning Unit will continue to monitor the condition of the pipeline by asking the Operator to confirm the status of the pipeline remains unchanged following future surveys.
Further information
A list of all installations on the UKCS and their current status is available from the OSPAR Website
At the first ministerial meeting of the Commission for the Protection of the Marine Environment of the North East Atlantic (OSPAR) in 1998, a binding decision was agreed that set rules for the disposal of offshore installations at sea. Under the decision the dumping and leaving wholly or partly in place of offshore installations is prohibited. Decision 98/3 recognises it may be difficult to remove the ‘footings’ of large steel jackets weighing more than 10,000 and concrete installations. As a result there are derogations for these categories of installations if the internationally agreed assessment and consultation process shows leaving them in place is justifiable.
OPRED has utilised decommissioning programme templates for derogation and non-derogation projects. These templates include all required content as detailed in Annex C of the guidance notes. There are also templates available which are currently being trialled for more specific and small scale decommissioning activity including rig reactivation and removal of a single Wellhead Protection Structure. Operator’s should discuss all individual cases with OPRED who will advise of the appropriate template.
A
is available - (November 2018).A
is also available (November 2018).A word version of these templates can also be requested from OPRED. Please email odu@beis.gov.uk for further details.
Cost recovery
OPRED will charge a fee in respect of offshore (oil and gas) installations and pipelines decommissioning programmes under the Petroleum Act 1998. Guidance, including the indicative fee structure, is available in
Last updated 20
-
Approval of Decommissioning Programme
-
New DPs out to consultation
-
wenlock DP approval re-added appears to have been deleted in error
-
Consultation DP
-
Approved DP
-
Approved DP
-
DP approval
-
Draft programme for consultation
-
DP approval
-
Consultation DP added
-
DP approved
-
Causeway and Fionn DP consultation
-
DP approval
-
Decommissioning Programme for consultation
-
Decommissioning Programmes added for Public Consultation
-
Acceptance of Close Out Report
-
DP Consultation
-
COR accepted
-
Consultation DP added
-
ensign DP approved
-
Consultation DP
-
markham close out report added
-
Consultation DP
-
DP approval
-
Cost recovery consultation impact assessment added
-
DP Approval
-
DP approval
-
newly approved DP
-
Decommissioning programme for consultation
-
Consultation draft DP added
-
Edited 'Overview' section to publish details of consultation on proposed changes to fee charging regime.
-
interim CORs added for Banff FPSO and SAL buoy DPS
-
approval of Gaupe DP
-
Approval of Decommissioning Programme
-
DP approved
-
Adding an approved DP
-
Consultation DP
-
DP approved
-
Approved Decommissioning Programme
-
Decommissioning Programmes for consultation
-
DP approved
-
DP approved
-
DP approved
-
COR added
-
Approved DPs added
-
Close Out Reports Approved
-
Adding A Decommissioning Programme which is out to Public Consultation.
-
Consultation DPs added
-
Consultation DP added
-
Consultation DP added
-
Approval of Decommissioning Programme
-
Decommissioning Programme Approved
-
Approval of preparatory works
-
Consultation DP added
-
Accepted Close Out Report added
-
Approval of Decommissioning Programme
-
Five new DPs out to consultation
-
A new DP is out to public consultation
-
draft DP added
-
Decommissioning Programmes for consultation
-
Approval of A DP and Derogation
-
Draft decommissioning programme for consultation
-
Decommissioning Programme for consultation
-
document replaced with updated version
-
Decommissioning Programme Approval
-
Approved Decommissioning Programme
-
Consultation DP added
-
DP has been approved
-
Decommissioning Programme for consultation
-
A DP has been added for public consultation
-
Approval of Decommissioning Programme
-
Approved DP added
-
Approval of Decommissioning Programme
-
approval of Eider topsides DP
-
A Decommissioning Programme has been approved
-
consultation DP added
-
Approval of a DP
-
Approved DP
-
Approval of a DP
-
Decommissioning Programme for consultation
-
Approved DP
-
Decommissioning Programme now approved
-
Consultation DPs
-
Decommissioning Programme for consultation
-
CoR added to website
-
DP approval
-
Huntington Consultation DP added
-
New Decommissioning Programmes out to consultation.
-
New DP out to consultation
-
New DP out to consultation
-
Decommissioning Programmes for consultation
-
Decommissioning Programme for consultation
-
Decommissioning Programme for consultation
-
Approved of Banff SAL Buoy DP
-
Consultation of Cavendish Decommissioning Programme
-
MacCulloch DP approved
-
New approved DP
-
Consultation of Ensign
-
Approval of Decommissioning Programme
-
Approval of South Morecambe DP3/DP4 Decommissioning Programmes
-
Pickerill installations DP approved
-
Minke DP approved
-
Banff SAL buoy DP for consultation
-
Addition of two approved decommissioning programmes
-
Added the approved Juliet DP to the website
-
PL5 approved
-
NNP approved
-
Decommissioning Programme for consultation
-
Consultation of MacCulloch Field Decommissioning Programmes
-
Revised CAs for Brae A, Brae B and East Brae
-
Approval of Nevis N11 WHPS Decommissioning Programme
-
Change of email to a generic one rather than a personal email.
-
Schiehallion & Loyal Phase One Close Out Report Approved
-
Approval of the Dunlin Alpha Topsides Decommissioning Programme
-
Update of the content of the DP
-
Approval of Hewett Vent Stack DP
-
consultation closed
-
Consultation DP and supporting documents for PL5
-
Minke and Juliet consultation DPs published
-
Addition of Close Out Report
-
New Approved Programme
-
New programme for consultation
-
Publishing approved Curlew DP
-
Morecambe DPs published for consultation
-
Added a CoR
-
Addition of Close Out Report
-
Approved DPs for VDP2 and VDP3 added
-
Addition of approved DPs for Tyne South Installations and Guinevere Installation
-
Addition of approved decommissioning programme
-
Approval of a Decommissioning Programme
-
Addition of Brent Delta Close Out Report
-
Addition of 2 decommissioning programmes for consultation
-
Update decommissioning templates added
-
Guidance document was updated and uploaded
-
Adding Goldeneye DP for consultation.
-
Jacky Decommissioning Programmes Approved
-
Approval of Close out Report
-
Approval of Decommissioning Programme
-
VDP2 and VDP3 consultation draft Decommissioning Programmes added
-
Approval of Brent Alpha, Bravo and Charlie Topsides Decommissioning Programme
-
Offshore Oil and Gas Decommissioning Programme out to consultation
-
Addition of a new decommissioning programme for consultation
-
Tyne South and Guinevere Installation Decommissioning Programmes published for consultation
-
Addition of Curlew DPs, CA and EIA for Public Consultation.
-
Decommissioning Programme Approved
-
Updated Offshore decommissioning guidance has been added
-
Ann & Alison, Saturn (Annabel) and Audrey DPs have been approved
-
Changed document to final version
-
A decommissioning programme has been approved
-
Approved Markham DP
-
Bains Documents Added
-
Updated Environmental Guidance on Decommissioning
-
Jacky DP Consultation
-
Draft Consultation Decommissioning Programme uploaded
-
Updated guidance for Offshore Decommissioning on website for feedback
-
Addition of approved DPs
-
Approved DPs added
-
Saturn Annabel, Audrey and LDP1 Programmes for public consultation
-
DPN form corrected
-
generic email address added and DPN form updated (with generic email address)
-
Ann and Alison DP's and associated documents added for public consultation
-
Fairfield Fagus Limited's Dunlin Fuel Gas Import and Power Import, Merlin and Osprey Decommissioning Documents uploaded
-
Brae Area DPs and associated documents available for consultation
-
Harding STL Close Out Report added
-
Disused Pipeline Notification Form revised - 03 May 17
-
Leman BH Decommissioning Programme approved
-
Approval of Ettrick and Blackbird DP
-
Ninian North Platform documents published for public consultation A4 Programme approved
-
Brent Decommissioning Programmes published for consultation
-
IVRR Close Out Report added
-
Ann A4 Installation Decommissioning Programme added for consultation
-
Approved Decommissioning Programmes added
-
Atlantic and Cromarty Draft Decommissioning Programmes Consultation
-
references of DECC amended to BEIS (including DPN form)
-
Janice, James & Affleck Fields - Draft programmes under consideration (added)
-
Markham ST-1 Decommissioning Programmes - (added)
-
Oil & Gas: Update Notification of Disused Pipelines
-
Oil & Gas: Update Table of draft decommissioning programmes under consideration.
-
Leadon Decommissioning Programmes - (added)
-
Notification of Disused Pipelines form - (updated)
-
Harding STL approved decommissioning programme - (added)
-
Thames Area - Horne & Wren, Orwell and Wissey approved decommissioning programmes - (added)
-
Fife, Flora, Fergus, Angus: decommissioning programme FFFA Close Out Report - (added)
-
Thames Area – Thames Complex, Gawain & Arthur - Approved decommissioning programmes - (added)
-
Viking Satellites CD,DD,ED,GD,HD draft decommissioning programmes under consideration - (added)
-
Oil and Gas: Updated document for Harding STL Decommissioning Programme
-
Oil and Gas: Updated “Table of approved decommissioning programmes” table.
-
Leman BH draft decommissioning programme - (added)
-
Oil and Gas: Addition of Brent field to approved decommissioning programme
-
Oil and gas: Rose approved decommissioning programme - (added)
-
Decommissioning - Leadon draft programme, follow up consultation - (added)
-
Oil and gas: Stamford decommissioning programme - (added)
-
Oil and gas: Rose Field decommissioning programmes - (added)
-
Oil and gas: Brent – Brent Delta Topside draft decommissioning programme - (added)
-
Oil and Gas: Addition of Stamford Field to decommissioning programmes table
-
Oil and Gas: Updated the disused pipeline notification form
-
Oil and gas: Decommissioning - Streamlined Decommissioning Programme Template (Derogation Cases) - (added)
-
Oil and gas: NW Hutton close out report - (added)
-
Oil and gas: Decommissioning draft prgrams - Thames - (added)
-
Oil and gas: Indefatigable (Shell) close out report - (added)
-
Oil and gas: Streamlined Decommissioning Programme Template (Non-Derogation Cases) - (updated)
-
Oil and gas: Murchison approved decommissioning programme - (added)
-
Oil and gas: Rubie & Renee - Approved decommissioning programme - (added)
-
Oil and gas: Decommisiioning Linhe close out report - (added)
-
Oil and gas: Streamlined Decommissioning Programme Template (Non Derogation Cases) - updated
-
Oil and gas: Leadon Draft Decommissioning Programme - added
-
Oil and gas: Miller decommissioning programme - (added)
-
Oil and gas: Rubie/Renee Draft Decommissioning Programme - (added)
-
Camelot close out report - added
-
Added Murchison draft decommissioning programme
-
Added streamlined decommissioning programme template
-
Re-created table, added H2's and anchors
-
First published.