Guidance

Oil and gas: decommissioning of offshore installations and pipelines

Decommissioning programmes, including dates, locations, installations decommissioned, method of decommissioning and close-out reports where available.

Overview

The decommissioning of offshore oil and gas installations and pipelines on the United Kingdom Continental Shelf (UKCS) is controlled through the Petroleum Act 1998.

The responsibility for ensuring that the requirements of the Petroleum Act 1998 are complied with rests with the Offshore Petroleum Regulator for Environment and Decommissioning (OPRED) which sits within the Department for Business, Energy and Industrial Strategy.

Owners of oil and gas installations and pipelines are required to decommission their offshore infrastructure at the end of a field’s economic life and the 1998 Act requires owners to set out the measures to decommission disused installations and/or pipelines in a decommissioning programme.

A decommissioning programme must identify all the items of equipment, infrastructure and materials that have been installed or drilled and describe the decommissioning solution for each.

OPRED aims to be transparent in its consideration of decommissioning programmes. As a result members of the public, other organisations, non-governmental organisations and other government departments or agencies are invited to comment on the proposals set out in a programme.

Details of the current programmes under consideration are noted in the table below.

OPRED provides guidance on the regulatory requirements for decommissioning. Final guidance on the Environmental Considerations for Decommissioning (Section 12) has now been incorporated into the guidance notes Offshore Oil and Gas Decommissioning Guidance Notes November 2018 (PDF, 1.27 MB, 138 pages).

Consultation on our Financial Assurance Guidance for the Decommissioning of Offshore Oil and Gas Installations and Pipelines concluded on 31 March 2019. Comments are being addressed and a final draft will be published in due course. Draft Financial Assurance Guidance (PDF, 300 KB, 17 pages)

The guidance outlines how the government assesses the financial capability of persons with a relevant interest in or considering taking an interest in an offshore oil or gas field. For the purposes of satisfying the Secretary of State that that person will be capable of carrying out a decommissioning programme in relation to that interest.

It explains our financial assurance policy and existing processes setting out the steps taken to assess the financial health of offshore oil and gas companies with an interest or potential interest in a field, outlining how and when we may use the statutory powers set out in the Petroleum Act 1998.

If you have any comments or questions relevant to the guidance, please email us at odu@beis.gov.uk.

Proposed changes to charging a fee in respect of decommissioning offshore (oil and gas) installations and pipelines under the Petroleum Act 1998 as amended by the Energy Act 2008

The aim of this consultation is to formally seek views from stakeholders such as offshore oil and gas operators, companies with an interest in decommissioning offshore oil and gas installations and pipelines, and other interested parties, on the proposal to update the charging regime for activity related to the regulatory functions for the decommissioning of offshore oil and gas installations. Fees consultation document - May 2021 (PDF, 224 KB, 19 pages) Offshore oil and gas cost recovery consultation impact assessment (PDF, 247 KB, 11 pages)

To provide your response, please complete the consultation response form below and e-mail it to odu@beis.gov.uk.

Fees consultation response form - May 2021 (ODT, 53.6 KB)

The deadline for responses is 16 August 2021.

Draft decommissioning programmes under consideration

Decommissioning Field ProgrammeName Field Operator StatusMain points of DPthe programmedocuments Details
JohnstonPremier OIl E&P UK EU LimitedSubsea installations will be recovered to shore for recycling and disposal. Trenched and buried rigid flowlines will be left in situ with exposed ends remediated with rock. Trenched and buried flexible flowlines, umbilicals, spool pieces and jumpers will be removed. Johnston DP (PDF, 948 KB, 39 pages) Johnston CA (PDF, 1.64 MB, 62 pages) Johnston EA (PDF, 5.25 MB, 121 pages)
Scoter and MerganserShell UK LimitedSubsea installations will be recovered to shore along with surface laid spools and jumpers. Buried pipelines will be left in situ. Scoter and Merganser DP (PDF, 2.36 MB, 68 pages) Scoter and Merganser CA (PDF, 1.94 MB, 47 pages) Scoter and Merganser EA (PDF, 6.28 MB, 128 pages)
Caister CM Pipelines - CDP1bChrysaor Production (U.K.) LimitedDraft programme under consideration Buried pipelines will be left in situ and surface laid pipelines will be removed to shore.shore for re-use, recycling or disposal. CDP1b Decommissioning Programme (PDF, 4.87 MB, 51 pages)
CMS Area Environmental Appraisal (PDF, 10 MB, 171 pages)
CMS Area Comparative Assessment (PDF, 13 MB, 144 pages)
Caister-Murdoch System III Installations and Pipelines - Boulton BM, Boulton HM, Hawksley EM, Katy KT, Kelvin TM, McAdam MM, Munro MH, Murdoch K.KM, Watt QMQM, &and Pipelines - CDP2Chrysaor Production (U.K.) LimitedDraft programmes under consideration All topsides and jackets will be recovered to shore.shore for re-use or recycling. Buried pipelines will be left in situ and surface laid pipeline ends will be recovered CDP2 Decommissioning Programme (PDF, 14.1 MB, 124 pages)
CMS Area Environmental Appraisal (PDF, 10 MB, 171 pages)
CMS Area Comparative Assessment (PDF, 13 MB, 144 pages)
Murdoch Installations and Trunk Pipelines - Murdoch MA, Murdoch MC, Murdoch MD, & Associated Trunk Pipelines - CDP3Chrysaor Production (U.K.) LimitedDraft programmes under consideration All topsides and jackets will be recovered.recovered to shore for re-use or recycling. Buried pipelines will be left in situ and all risers and surface laid pipeline ends will be recovered.recovered CDP3 Decommissioning Programme (PDF, 7.32 MB, 76 pages)
CMS Area Environmental Appraisal (PDF, 10 MB, 171 pages)
CMS Area Comparative Assessment (PDF, 13 MB, 144 pages)
Saltire A Topsides and Saltire Area Subsea Infrastructure Decommissioning ProgrammesRepsol Sinopec Resources UK LimitedDraft programmes under considerationThe topsides will be transported ashore for dismantling, refurbished for reusere-use where possible, recycling or disposal as appropriate. Subsea installations will be returned to shore for reusere-use where possible, recycling and disposal. Bundles will be left in situ. situ Trenched and buried power cables and umbilicals will be left in situ with exposed sections being trenched and buried. Spools and transition sections shall be recovered to shore for reuse, recycling and disposal. Saltire A Topsides & Subsea DP (PDF, 1.57 MB, 56 pages)
Saltire CA (PDF, 4.24 MB, 109 pages)
Saltire EA (PDF, 6.19 MB, 104 pages)
Foinaven FPSO Offstation Decommissioning ProgrammeBritoil LimitedDraft programmes under considerationRemoval of FPSO and mooring lines to shore for recycling. Disconnection and placement on seabed of associated risers and umbilicals. Pipelines will be cleaned and flushed. Temporary isolation of wells. Foinaven FPSO Offstation DP (PDF, 2.91 MB, 46 pages)
Hewett Area Subsea InstallationsEni UK LimitedDraft programme under considerationSubsea installations will be fully removed and recovered to shore for reuse, recycling or disposal Hewett Area Subsea Installations DP (PDF, 4.11 MB, 48 pages)
Hewett Area Subsea Installations EA (PDF, 14.7 MB, 137 pages)
Causeway and FionnIthaca Energy (UK) LimitedDraft programmes under consideration Removal of all subsea installations, purge spool and valve skid structure to shore for recycling. Pipelines and umbilicals to remain in situ with cut ends being buried. All exposed end/tie-in spools will be completely removed and returned to shore for recycling. All wells will be plugged and abandoned. Causeway and Fionn DP (PDF, 2.88 MB, 57 pages)
Causeway and Fionn CA (PDF, 2.03 MB, 41 pages)
Causeway and Fionn EA (PDF, 6.77 MB, 94 pages)
SeanONE-Dyas UK LimitedDraft programmes under consideration 3 Platforms will be recovered to shore for reuse or recycling. SSIV protection structure, control umbilical and electrical cable will be recovered to shore for reusere-use or recycling. Trenched and buried pipelines to be decommissioned in situ. Exposed sections will be remediated with rock dump. Sean Decommissioning Programme (PDF, 2.61 MB, 57 pages)
Sean Comparative Assessment (PDF, 2.86 MB, 109 pages)
Sean Environmental Appraisal (PDF, 9.43 MB, 170 pages)
LOGGS Satellites - Mimas MN, Saturn ND and Tethys TNTN, &and Associated Infield Pipelines – LDP2Chrysaor Production (U.K.) LimitedTopsidesDraft programmes under consideration All topsides and jackets will be recovered to shore.shore for re-use or recycling. Buried pipelines will be left in situ and the riser sections of pipelines will be removed to shore.shore for re-use or recycling. LDP2 Decommissioning Programme (PDF, 4.55 MB, 85 pages)
LOGGS LDP2 - LDP5 Comparative Assessment (PDF, 3.21 MB, 203 pages)
LOGGS LDP2 - LDP5 Environmental Appraisal (PDF, 4.23 MB, 182 pages)
LOGGS Satellites V-Fields Area - Vanguard QD, North Valiant SP, South Valiant TD and Vulcan RDRD, &and Associated Infield Pipelines - LDP4Chrysaor Production (U.K.) LimitedTopsidesDraft programmes under consideration All topsides and jackets will be recovered to shore.shore for re-use or recycling. Buried pipelines will be left in situ. LDP4 Decommissioning Programme (PDF, 3.89 MB, 75 pages)
LOGGS LDP2 - LDP5 Comparative Assessment (PDF, 3.21 MB, 203 pages)
LOGGS LDP2 - LDP5 Environmental Appraisal (PDF, 4.23 MB, 182 pages)
Hummingbird FPSO Sailaway and Chestnut riser disconnectionSpirit Energy North Sea Oil LimitedDraft programme under considerationThe FPSO will be removed from station and recovered to shore for recycling unless alternative re-use options can be found. All mooring suction anchors will be fully recovered to shore for re-use or recycling. All pipelines will be flushed and cleaned. The risers between the FPSO and the riser bases will be fully recovered to shore for recycling. Hummingbird FPSO Sailaway and Chestnut Riser disconnection Decommissioning Programmes (PDF, 2.8 MB, 38 pages)
VictoriaNEO Energy (SNS) LimitedDraft programmes under considerationWellhead protection structure will be recovered to shore for re-use, recycling or disposal. Trenched and buried sections of pipelines will be left in situ, removing the pipeline ends. Exposed concrete mattresses and grout bags will be recovered to shore for re-use, recycling or disposal. Victoria Decommissioning Programmes (PDF, 5.05 MB, 47 pages)
Victoria Comparative Assessment (PDF, 3.18 MB, 76 pages)
Victoria Environmental Assessment (PDF, 5.53 MB, 118 pages)
Dunlin Alpha FieldFairfield Betula LimitedDraft programme under considerationDecommissioning in situ of Dunlin Alpha concrete gravity based structure and storage cells. Dunlin Alpha Decommissioning Programme (PDF, 6.5 MB, 77 pages)
Dunlin Alpha Decommissioning Comparative Assessment Report (PDF, 3.66 MB, 133 pages) Dunlin Alpha Decommissioning Environmental Appraisal (PDF, 6.58 MB, 176 pages)
Brae Alpha, Brae Bravo, Central Brae, West Brae and SedgwickMarathon Oil UK LLC Draft programmes under considerationRemoval of Brae Alpha and Brae Bravo jackets to the top of the footings. Removal of Central Brae, West Brae and Sedgwick subsea installations. Pipelines to be decommissioned in a variety of ways including removal, trenching and leave in situ. Brae Alpha, Brae Bravo, Central Brae, West Brae and Sedgwick Decommissioning Programmes (PDF, 15.3 MB, 120 pages)
Brae A etc, Environmental Statement – Main Report (PDF, 14.6 MB, 80 pages) Brae A etc. Environmental Statement - Technical Appendices (PDF, 13.3 MB, 96 pages) Brae A Substructure Comparative Assessment (PDF, 1.7 MB, 30 pages) Brae B Substructure Comparative Assessment (PDF, 1.59 MB, 30 pages) Brae Area Subsea Assets Comparative Assessment (PDF, 6.84 MB, 43 pages)
BrentShell U.K. LimitedDraft programmes under considerationDecommissioning in situ of Brent Bravo, Charlie and Delta concrete gravity based structures. Brent Decommissioning Programme (PDF, 12 MB, 322 pages)
Brent ES (PDF, 12.5 MB, 475 pages)
Brent EIA (PDF, 5.05 MB, 429 pages)
Brent ES Appendix (PDF, 2.52 MB, 45 pages) A suite of detailed Technical Documents which support the Decommissioning Programmes documents are available on the Shell Website
Atlantic and CromartyBG Global Energy Limited and Hess LimitedDraft programmes under considerationManifold and WHPSWell head Protection structures (WHPS) to be removed for recycling/disposal. Partial removal of pipelines and remaining section of buried/trenched pipelines to remain in situ. Atlantic & Cromarty Decommissioning Programmes (PDF, 1.76 MB, 50 pages)
Atlantic & Cromarty Stakeholder Report (PDF, 1.11 MB, 32 pages)
Atlantic & Cromarty Environmental Impact Assessment (PDF, 4.5 MB, 109 pages)
Atlantic & Cromarty Comparative Assessment (PDF, 2.06 MB, 110 pages)

Approved decommissioning programmes

WHPS
Decommissioning Field ProgrammeName Operator at approval Operator following licence / company changeApproved Main Decommissioninginstallations solutiondecommissionedYear Approved of ApprovaloptionClose out report Year closeof out report acceptedapproval
Hummingbird Spirit FPSO Sail away and Chestnut Riser Disconnection (PDF, 2.96 MB, 47 pages)Spirit Energy North Sea Oil Limited-FPSO, mooring suction anchors and risers Removal to shore for either re-use or recyclingMarch 2022  
VictoriaWenlock DP (PDF, 6.064.72 MB, 4251 pages)VictoriaWenlock CA (PDF, 1.813.84 MB, 4844 pages)VictoriaWenlock EA (PDF, 18.46.74 MB, 158119 pages) NEO Alpha EnergyPetroleum (SNS)Resources Limited -Wenlock Platform Recovered will be recovered to shore for reuse,Re-use/recycling recycling or disposal. Trenched and buried sections of pipelines will be left in situ, removing the pipeline ends. Exposed concrete mattresses and grout bags will be recovered to shore.AprilFebruary 2022  
WenlockMid-Line DPtee (PDF,protection 4.72structureRecovered MB,to 51shore pages)Wenlockfor CARe-use/recycling (PDF,or 3.84 MB, 44 pages)Wenlock EA (PDF, 6.74 MB, 119 pages) disposal.AlphaFebruary Petroleum Resources Limited2022
-PipelinesPlatform,Trenched midand lineburied teepipelines protectionwill structure,remain in situ, exposed tie-in spools and stabilisation features will be removedreturned to shore.shore Trenchedfor and buried pipelines will remain in situ.recycling.February 2022  
Cormorant Alpha Topsides DP (PDF, 3.91 MB, 81 pages)Cormorant Alpha Topsides EA (PDF, 8.21 MB, 117 pages) TAQA Bratani Limited-TopsidesCormorant Alpha TopsidesRecovered to shore for reuse/recyclingre-use/recycling or disposalFebruary 2022  
Caledonia Decommissioning Programme (PDF, 3.1 MB, 50 pages)Caledonia Comparative Assessment (PDF, 2.04 MB, 64 pages)Caledonia Environmental Assessment (PDF, 5.56 MB, 113 pages) Premier Oil UK Limited -InstallationsSubsea installations,installations trenchedwill andbe buried flexible pipelines, umbilicals, spools and jumpers returned to shore for recycling or disposalFebruary disposal, 2022
PipelinesTrenched and buried rigid pipelines will be left in situ. Trench and buried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or disposalFebruary 2022  
Thistle Topsides Decommissioning Programme (PDF, 3.11 MB, 38 pages)EnQuest Heather Limited-TopsidesRecovery of topsides to shore for reuse,re-use, recycling or disposalDecember 2021  
Indefatigable 18A Topsides Decommissioning Programme (PDF, 1.29 MB, 50 pages)Perenco UK Limited-TopsidesRecovery of topsides to shore for reuse,re-use, recycling or disposalDecember 2021  
Banff and Kyle Decommissioning Programmes (PDF, 3.23 MB, 71 pages)Banff and Kyle Environmental Appraisal (PDF, 7.07 MB, 114 pages)Banff and Kyle Comparative Assessment (PDF, 2.75 MB, 106 pages) CNR International (U.K.) Limited -Subsea installations,installationsReturned mooringto piles,shore chainsfor andre-use, surfacerecycling laidor pipelinesdisposalNovember returned2021
Mooring Piles and chainsReturned to shore for reuse,re-use, recycling or disposal.disposalNovember 2021
PipelinesTrenched pipelines will be left in situ. Surface laid pipelines will be fully removed and returned to shore. November 2021  
Ensign installation DP (PDF, 2.52 MB, 37 pages)Ensign Pipelines DP (PDF, 1.99 MB, 42 pages)Ensign CA (PDF, 1.67 MB, 48 pages)Ensign EA (PDF, 9.45 MB, 134 pages) Spirit Energy North Sea Limited -InstallationsRemoval and all exposed grout bags and concrete mattresses will be recovered to shore for reuseeither re-use or recycling.recyclingAugust 2021
Pipelines Buried pipelines will be left in situ with exposed ends cut and removed. All associated exposed grout bags and concrete mattresses will be recovered to shore for re-use or recycling. Concrete Plinths and existing rock will be left in situ.August 2021  
Conrie, Don SW, W Don and Ythan Decommissioning Programmes (PDF, 7.29 MB, 88 pages)Don SW and W Don Comparative Assessment (PDF, 5.33 MB, 76 pages)Conrie, Don SW, W Don and Ythan Environmental Appraisal (PDF, 8.07 MB, 132 pages) EnQuest Heather Limited -Installations,InstallationsRemoval surfaceto shore for re-use, recycling or disposalAugust 2021
PipelinesSurface laid pipelines will be cleaned, flushed and associatedfully removed. Trenched and buried sections of pipelines will be left in situ. Associated concrete mattresses and grout bags will be recovered to shore for reuse,re-use, recycling or disposal. TrenchedExisting and buried sections of pipelines and existing rock dump will be left in situ.situAugust 2021  
Fulmar and Auk North Topsides, Subsea Facilities and Pipelines Decommissioning Programme (PDF, 3.83 MB, 78 pages)Fulmar and Auk North Subsea Infrastructure and Pipelines Comparative Assessment (PDF, 4.63 MB, 144 pages)Fulmar & Auk North Environmental Appraisal (PDF, 5.17 MB, 114 pages) Repsol Sinopec Resources UK Limited -RemovalFulmar ofand Auk North TopsidesThe topsides will be transported ashore for dismantling. Cleaned equipment refurbished for re-use where possible. Equipment which cannot be re-used will be recycled for other disposal routes as appropriate. July 2021
Fulmar and subseaAuk North Subsea Facilities Subsea installations will be returned to shore for reuse, recycling or appropriate treatment and disposal.July 2021
Fulmar and Auk North Pipelines Trenched and buried stable pipelines will be left in situ. Tie-inThe tie-in spools and trench transition sections of the pipelines shall be cut, recovered and returned to shore for recycling. ExposedThe exposed and insufficiently covered remaining sections of pipe shall be rock covered.July 2021  
Heather Topsides Decommissioning Programme (PDF, 4.07 MB, 43 pages)EnQuest Heather Limited-TopsidesRecovery of topsides to shore for reuse,re-use, recycling or disposalJuly 2021  
Kingfisher Decommissioning Programme (PDF, 2.95 MB, 76 pages)Kingfisher CA (PDF, 2.19 MB, 51 pages)Kingfisher EA (PDF, 3.48 MB, 119 pages) Shell U.K. Limited -InstallationsRemoval of installations to shore for recycling or reuse.reuseJune 2021
Pipelines Trenched and/or buried pipeline sections will be decommissioned in situ. The end of the pipelines will be cut, and additional rock cover will be added to cut ends to reduce snagging risk.riskJune 2021  
Gaupe Decommissioning Programme (PDF, 1.86 MB, 47 pages) Gaupe CA (PDF, 1.32 MB, 51 pages)Gaupe EA (PDF, 5.77 MB, 113 pages) A/S Norske Shell-PipelinesFull removal of SSIV, full removal of risers.risers PL2783 and PLU2786. Partial removal of pipelines PL2781, PL2782 and umbilicals.umbilicals PLU2784 and PLU2785. May 2021  
PL301 Heimdal to Brae Pipeline Decommissioning Programme (PDF, 7.71 MB, 53 pages) PL301 Heimdal to Brae Pipeline Comparative Assessment (PDF, 6.77 MB, 55 pages)PL301 Heimdal to Brae Environmental Appraisal (PDF, 9.64 MB, 114 pages) Equinor Energy AS-PipelineMajority of pipeline will be left in situ with rock placement over spans/exposures. 20m surface laid section of pipeline out with the existing trench to be removed and recovered to shore. April 2021  
Hunter & Rita Decommissioning Programme (PDF, 2.1 MB, 44 pages)Hunter & Rita CA (PDF, 1.99 MB, 79 pages)Hunter & Rita EA (PDF, 4.96 MB, 131 pages) Premier Oil E&P UK Limited -InstallationsSubsea installations,installations Trenched & buried Flexible Flowlines & Umbilicals Rigid Spool pieces and jumpers will be returned to shore for recycling or disposal.appropriate treatment and disposalApril 2021
PipelinesTrenched and buried pipelines,pipelines failedand flexibletrenched flowlinesand buried Flexible Flowlines (Failed) and umbilical will be left in situ. Exposed ends & areas of exposure to be removed & returned to shore for recycling or appropriate treatment and disposal. Local rock placement will be used to mitigate snag hazard from cut ends. Trenched & buried Flexible Flowlines & Umbilicals Rigid Spool pieces and jumpers shall be fully removed and returned to shore for recyclingApril 2021  
LOGGS PR, LOGGS PC, LOGGS PP, LOGGS PA, North Valiant PD, & Associated Pipelines – LDP5 (PDF, 12.2 MB, 99 pages) Chrysaor Production (U.K.) Limited -RemovalTopsides of topsides and jacketsJacketsRemoval to shore for recycling or disposal.disposalApril 2021
Pipelines Buried pipelines associated with PP will be left in situ and the riser sections of pipelines will be removed to shore for reusere-use or recycling with the PP and PR jackets.April 2021  
Windermere Decommissioning Programme (PDF, 1.95 MB, 41 pages)Windermere CA (PDF, 802 KB, 34 pages)Windermere ES (PDF, 7.86 MB, 231 pages) INEOS UK SNS Limited -RemovalTopsides of topsides and jacketJacketRemoval to shore for recycling or disposal.disposalMarch 2021
PipelinesThe pipelines will be partially removed, the exposed sections adjacent to the platforms will be removed and recycled or disposed onshore. The exposed ends will be lowered to achieve adequate depth of coverage. The existing buried sections of umbilical will be left in situ. All concrete mattresses and grout bags will be recovered to shore for reuse, recycling or disposal.March 2021  
Hewett Decommissioning Programme (PDF, 5.76 MB, 69 pages) Hewett Environmental Appraisal (PDF, 16.9 MB, 134 pages) ENI Hewett Limited-6 PlatformsAll 6 platforms will be removed and returned to shore for processing/recycling or disposalMarch 2021  
Buchan & Hannay Decommissioning Programme (PDF, 3.33 MB, 57 pages)Buchan & Hannay CA (PDF, 3.83 MB, 91 pages)Buchan & Hannay EA (PDF, 8.29 MB, 115 pages) Repsol Sinopec Resources UK Limited -Subsea InstallationsSubsea installations and surface laid pipelines will be removed to shore for either reuse,re-use, disposal or recycling.recyclingMarch 2021
PipelinesBuried and stable pipelines will be left in situ. Surface laid pipelines will be removed to shore for re-use, disposal or recyclingMarch 2021  
Huntington Decommissioning Programme (PDF, 2.52 MB, 41 pages)Huntington CA (PDF, 1.86 MB, 62 pages)Huntington EA (PDF, 5.01 MB, 127 pages) Premier Oil E&P UK Limited -Subsea installations,InstallationsSubsea Trenchinstallations and Buried flexible pipelines, umbilicals, spools and jumpers will be returned to shore for recycling or appropriate treatment and disposal.disposalMarch 2021
PipelinesTrenched and buried rigid, stable pipelines will be left in situ. Trench and Buried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposalMarch 2021  
Northern Producer FPF and Don SW + W Don riser disconnection (PDF, 4.89 MB, 58 pages) Submitted jointly by Qualimar Shipping Company Limited and EnQuest Heather Limited -Northern Producer FPFRemoval for reuse,re-use, recycling or disposalMarch of Northern Producer FPF, 2021
Mooring and anchor systems, mid water arch and risersRemoval andto shore for reuse, recycling or disposalMarch 2021
Pipeline sections and exposed mattresses within the 500m safety zoneRemoval to shore for reuse, recycling or disposalMarch 2021  
Balmoral Decommissioning Programme (PDF, 4.27 MB, 65 pages)Balmoral Area CA (PDF, 2.56 MB, 116 pages)Balmoral Area EA (PDF, 8.03 MB, 196 pages) Premier Oil E&P UK Limited -Balmoral FPVThe Balmoral FPV will be towed to a suitable location for re-sale, reuse,re-use, recycling or disposal.disposalFebruary 2021
Mooring systemThe mooring chains will be recovered to the point of burial at the anchor pile.pileFebruary 2021
Subsea InstallationsSubsea installations will be returned to shore for recycling or appropriate treatment and disposal.disposalFebruary 2021
PipelinesTrenched and buried rigid, stable pipelines will be left in situ. Trenched and buriedBuried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposalFebruary 2021  
Brenda Decommissioning Programme (PDF, 1.76 MB, 47 pages) Premier Oil E&P UK Limited -Subsea Installations Subsea installations will be returned to shore for recycling or appropriate treatment and disposal.disposalFebruary 2021
PipelinesTrenched and buried rigid, stable pipelines will be left in situ. Trenched and buriedBuried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal.disposal February 2021  
Glamis Decommissioning Programme (PDF, 2.53 MB, 46 pages) Premier Oil E&P UK Limited -Subsea Installations Subsea installations will be returned to shore for recycling or appropriate treatment and disposal.disposalFebruary 2021
PipelinesTrenched and buried rigid, stable pipelines will be left in situ. Trenched and buriedBuried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal.disposal February 2021  
Nicol Decommissioning Programme (PDF, 1.68 MB, 45 pages) Premier Oil E&P UK Limited -Subsea Installations Subsea installations will be returned to shore for recycling or appropriate treatment and disposal.disposalFebruary 2021
PipelinesTrenched and buried rigid, stable pipelines will be left in situ. Trenched but not backfilled umbilicals will be fully removed by reverse reeling, with deburial, and returned to shore for reuse, recycling or appropriate treatment and disposal. Trenched and buriedBuried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposalFebruary 2021  
Stirling Decommissioning Programme (PDF, 3.13 MB, 44 pages)Premier Oil E&P UK Limited-PipelinesTrenched and buried rigid, stable pipelines will be left in situ. Trenched and buriedBuried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal.disposalFebruary 2021  
Topaz Decommissioning Programme (PDF, 2.21 MB, 31 pages)Topaz CA (PDF, 504 KB, 15 pages)Topaz EA (PDF, 1.22 MB, 37 pages) INEOS UK SNS Limited -Subsea Installations The subsea installation, a Wellhead Protection Structure, will be returned to shore for recycling or appropriate treatment and disposal.disposalFebruary 2021
Pipelines (PL2631 and PLU2632)The Trenched and Buried, stable pipeline and umbilical will both be left in situ.situFebruary 2021  
North Cormorant DP (PDF, 2.56 MB, 50 pages) North Cormorant EA (PDF, 7.26 MB, 93 pages) TAQA Bratani Limited-North Cormorant TopsidesRemoval to shore for recycling or reusere-useNovember 2020  
Tern Topsides - Decommissioning Programme (PDF, 2.84 MB, 52 pages) Tern Topsides EA (PDF, 7.03 MB, 91 pages) TAQA Bratani Limited-Tern TopsidesRemoval to shore for recycling or reusere-useNovember 2020  
Fulmar & Auk North Preparation Work Scopes Decommissioning Programme (PDF, 1.53 MB, 35 pages)Repsol Sinopec North Sea Limited-N/A This Decommissioning Programme is specifically for preparation work scopes relating to the Fulmar and Auk North installations November 2020  
East Brae Topsides and Braemar Decommissioning Programmes (PDF, 3.88 MB, 62 pages) RockRose UKCS8 LLC-TAQAEast BrataniBrae LimitedTopsidesRemoval ofto topsidesshore andfor subseare-use installationsor recycling.September 2020
Subsea InstallationsRemoval to shore for reuserecycling or recycling.re-use.September 2020
PipelinesRemoval to shore of surface laid pipelines. Trenched and buried pipelines to remain in situSeptember 2020  
Brent Alpha Jacket (PDF, 2.82 MB, 101 pages)Shell U.K. Limited-Brent Alpha JacketJacket to be removed to 84.5m below sea level for removal to shore for recycling/disposal. Footings to remain in situJuly 2020  
Amethyst A1D, A2D, B1D & C1D Topsides (PDF, 2.42 MB, 43 pages)Perenco UK Limited-Topsides Removal of topsides to shore for reuse,re-use, recycling or disposalJuly 2020  
Anglia Decommissioning Programme (PDF, 2.18 MB, 61 pages) Anglia CA (PDF, 3.74 MB, 49 pages) Anglia EA (PDF, 5.83 MB, 120 pages) Ithaca Energy UK Limited-RemovalTopside of topsides and jacketJacketsRemoval to shore for recycling or reuse.re-useJune 2020
Pipelines Pipelines will remain in-situ. All tie-in spools for the 8” import line, 12” export line and 3” Methanol line will be completely removed. Partial removal of 6” umbilical. June 2020   
Brynhild Pipelines (PDF, 1.98 MB, 50 pages)Lundin Energy Norway AS -Pipelines The trenched and buried sections of pipelines and umbilicals will be decommissioned in situ. The exposed sections will be remediated by either cut with removal to shore, trench and burial or rock cover. Exposed mattresses will be removed to shore for reuse,re-use, recycling or disposal. The PLET, support frames and protection covers will be completely removed to shore for reuse,re-use, recycling or disposal.disposalJune 2020  
Cormorant Alpha Derrick Structure Removal (PDF, 4.28 MB, 57 pages)TAQA Bratani Limited-Removal of drilling derrick structure and installation of modular drilling rig to facilitate well P&ARemoval to Shore of drilling derrick structureJune 2020  
Cavendish (PDF, 2.4 MB, 40 pages) INEOS UK SNS Limited -Topsides and jacketRemoval to shoreJune of topsides and jacket. 2020
PipelinesPartial removal of pipelines (buried sections left it situ).situ)June 2020  
Banff and Kyle FPSO and FSO Float Off (PDF, 3.45 MB, 39 pages) Banff and Kyle FPSO and FSO Float Off Interim Close Out Report (PDF, 2.31 MB, 36 pages) CNR International (U.K.) Limited. -Removal of FPSO and FSORemoval to shore for redeployment.May 2020 Interim Close Out Report approved May 2021
Subsea InstallationsThe STL Buoy and associated mooring lines will be removed to shore for recycling.recyclingMay 2020
Riser SectionsAssociated riser sections and umbilicals within the water column will be removed to shore for recycling May 2020Banff and Kyle FPSO and FSO Float Off Interim Close Out Report (PDF, 2.31 MB, 36 pages)May 2021
Eider Topsides DP (PDF, 2.38 MB, 50 pages)TAQA Bratani Limited-Eider TopsidesRemoval of topsides to shore for recycling or reusere-useMay 2020  
Ganymede, Europa, Callisto and NW Bell – LDP3 (PDF, 4.85 MB, 101 pages) Chrysaor Production (U.K.) Limited -Topside and JacketsRemoval ofto topsideshore andfor jacketsrecycling toor shore.re-useMay 2020
Pipelines NW Bell pipelines will be recovered to shore.shore for re-use or recycling. Ganymede, Europa and Callisto interfield pipelines will be decommissioned in situ.situ May 2020  
Ganymede ZD Topsides - LDP3b (PDF, 2.31 MB, 46 pages)Chrysaor Production (U.K.) Limited-Ganymede TopsidesRemoval of topsides to shore for recycling or reuse.re-useApril 2020  
Huntington FPSO (Voyageur Spirit) (PDF, 1.19 MB, 21 pages) Premier Oil E&P UK Limited -FPSOThe Huntington FPSO (Voyageur Spirit) is to be floated off station and redeployed.redeployedApril 2020
PipelinesThe risersrisers, PL2805 (ident 2), PL2806 (ident 3), PL2807 (ident 2), PL2808 (ident 2) and PL2809 (ident 2) and mooring system will be removed and taken to shoreApril 2020  
Caister - CDP1a (PDF, 2.93 MB, 49 pages)Chrysaor Production (U.K.) Limited-Topsides and Jacket and associated sections of pipeline risers attached to the Caister platformRemoval removed to shore for recycling or reuse.re-useMarch 2020  
Alma & Galia DPs (PDF, 4.34 MB, 61 pages) EnQuest Heather Limited -FPSORemoval of FPSO to shore for recycling.March 2020
Subsea InstallationsPartial removal of the mooring anchor piles. The mooring chain will be cut locally to the mooring pile and buried to 1m below seabed. Removal of manifolds,manifolds and wellhead protection structures and pipelines.structures.March 2020
 Pipelines Removal to shore.March 2020
Brent Field Pipelines (PDF, 4.05 MB, 130 pages)Shell U.K. Limited-PipelinesRemoval to shore for recycling/disposal, trench/backfill, buried pipelines left in situMarch 2020  
Thistle COS Tanks (PDF, 3.34 MB, 59 pages)EnQuest Heather Limited-RemovalCrude ofOil crudeStorage oilTanksRemoval storage tanks to shore for recyclingJanuary 2020  
Banff SAL Buoy (PDF, 996 KB, 20 pages) Banff SAL Buoy Interim Close Out Report (PDF, 1.22 MB, 12 pages) CNR International (U.K.) Limited. Decommissioning Programmes submitted by Teekay Petrojarl Floating Production UK Ltd. -RemovalSubsea of subsea installationsRemoval to shore for either reusere-use or recycling.recyclingNovember 2019 Interim Close Out Report approved May 2021
PipelinesPart of pipeline to be returned to shore for recyclingNovember 2019Banff SAL Buoy Interim Close Out Report (PDF, 1.22 MB, 12 pages)May 2021
MacCulloch Decommissioning Programmes (PDF, 1.36 MB, 40 pages) Chrysaor Production (U.K.) Limited -Subsea installationsThe anchors will be decommissioned in situ. All other installations and pipelines will be removed to shore for either reusere-use or recyclingNovember 2019
 Pipelines All buried pipeline, flowlines and umbilicals will be removed for recycling and disposalNovember 2019
Goldeneye (PDF, 3.41 MB, 53 pages) Shell U.K. Limited -Topsides and JacketRemoval ofto topsides,shore jacketfor andre-use sectionsor recyclingNovember 2019
PipelinesSections of pipelines from the Goldeneye Platform up to but excluding the main pipeline tie-in flanges removal to shore for reusere-use or recycling.recyclingNovember 2019  
Brae Alpha West Drilling Rig (PDF, 2.2 MB, 24 pages)RockRose Energy UKCS8 LLCTAQA-Drilling Bratani LimitedRigRemoval of the drilling rig to shore for recycling or disposalSeptember 2019  
South Morecambe DP3/DP4 (PDF, 2.72 MB, 57 pages) Spirit Energy Production UK Limited -RemovalTopsides of topsides and jacketsJacketsRemoval to shore for either reusere-use or recycling.recyclingSeptember 2019
PipelinesBuried and stable pipelines left in situ, exposed pipeline ends cut and recovered to shore for either reusere-use or recyclingSeptember 2019  
Pickerill A&B Installations (PDF, 1.79 MB, 54 pages)Perenco Gas (UK) Limited-RemovalTopsides of topsides and jacketsRemoval to shore for eitherre-use, reuserecycling or recycling.disposalSeptember 2019  
Minke Decommissioning Programmes (PDF, 8.56 MB, 59 pages) Neptune E&P UKCS Limited -WHPSRemoval ofto WHPSshore andfor smallre-use surfaceor laidrecyclingSeptember 2019
Pipelinesburied sections of pipelines to shorebe fordecommissioned reusein orsitu recycling.small Buriedsurface laid sections of pipelines to be leftremoved into situshore for re-use or recyclingSeptember 2019  
Ketch (PDF, 2.65 MB, 60 pages) Schooner (PDF, 4.97 MB, 63 pages) DNO North Sea (ROGB) Limited -Topsides, jackets and subsea installationRemoval removed to shore for reuse,re-use, recycling or disposal.disposalAugust 2019
PipelinesTrenched and buried pipelinesand left in situAugust 2019  
Juliet (PDF, 6.16 MB, 47 pages) Neptune E&P UKCS Limited -Subsea InstallationsRemoval to shore offor subsearecycling/disposalAugust installations2019
PipelinesRemoval andto shore for small surface laid sections of the pipeline and umbilical for either reusere-use or recycling; buried sections to be left in-situAugust 2019  
Dunlin Alpha to Cormorant Alpha Pipeline - PL5 (PDF, 4.36 MB, 73 pages)

PL5 Close Out Report (PDF, 4.74 MB, 27 pages)

Fairfield Betula Limited-PipelinesTrenched sections will be left in situ, exposed pipeline ends cut and recovered and severed ends rock dumpedJuly 2019PL5 Close Out Report (PDF,Approved 4.74 MB, 27 pages)February 2021
Ninian Northern Platform (PDF, 2.34 MB, 70 pages)CNR International (U.K.) Limited-Large Steel PlatformTopsides and jacket to top of footings to be removed to shore for recycling/disposal. Footings to remain in situ.June 2019  
Nevis N11 WHPS (PDF, 1.66 MB, 26 pages)Apache Beryl I Limited-RemovalNevis ofN11 WHPSRemoval to shore for reusere-use or recyclingJune 2019  
Dunlin Alpha Topsides (PDF, 4.97 MB, 44 pages)Fairfield Betula Limited-RemovalDunlin ofAlpha topsidesTopsidesRemoval to shore for recycling or disposalMay 2019  
Hewett (PDF, 1.5 MB, 21 pages)Eni Hewett LimitedENI UK Limitedremoval of Vent Stack & other preparatory worksApril 2019Hewett Vent Stack Close Out Report (PDF, 595 KB, 11 pages) Eni Hewett LimitedENI UK Limited-Vent Stack (2 x 19m pipes) & other preparatory works on 48/29B Platform & PL84Removal to shore for recycling or disposalApril 2019,Close Out Report accepted September 2021
Pickerill A & B (PDF, 1.26 MB, 21 pages)Perenco Gas (UK) Limited-removal of Telecommunication towers, sub-cellar deck equipment, appurtenances, caissons, associated tanks and lift pumps, supply hoses, a pipeline riser emergency shutdown valve and tertiary steelworkRemoval to shore for reuse, recycling or disposalMarch 2019  
Curlew B, C and D (PDF, 2.4 MB, 61 pages) Shell U.K. Limited -FPSO,FPSORemoval subseato installations,shore somefor pipelinesrecycling/disposalMarch removed2019
Subsea InstallationsRemoval to shore for recyclingrecycling/disposalMarch /2019
PipelinesRemoval disposal.to Buriedshore for either re-use or recycling; buried pipelines to remainbe inleft situin-situMarch 2019  
Viking Platforms, Vixen and associated Pipelines (VDP2) (PDF, 33.3 MB, 84 pages) ConocoPhillips (U.K.) Limited -allViking platformsSatellites KD, LD, AR, Viking Bravo Hub BA, BC, BP, BD and subseaVixen installationssub-sea recoveredtiebackRemoval to shore for reuse,re-use, recycling or disposal.disposalJanuary 2019
PipelinesDecommissioned will be left in situJanuary 2019  
Victor (VDP3) (PDF, 21.1 MB, 55 pages) ConocoPhillips (U.K.) Limited -Victor Platform and subsea installationRemoval recovered to shore for reuse,re-use, recycling or disposal.disposalJanuary 2019
PipelinesDecommissioned will be left in situJanuary 2019  
Tyne South Installations (PDF, 1.83 MB, 42 pages)Perenco UK Limited-Topsides, jacket and subsea installationRemoval removed to shore for reuse, recycling or disposalJanuary 2019  
Guinevere Installation (PDF, 2.05 MB, 43 pages)Perenco UK Limited-Topsides and jacketRemoval removed to shore for reuse, recycling or disposalJanuary 2019  
Beatrice Decommissioning Programmes (PDF, 4.45 MB, 88 pages) Repsol Sinopec Resources UK Limited -Beatrice AP Topsides,Topsides; AD, Bravo and Charlie Platforms and AD Drilling TemplateRemoval removal to shore for reuse/recycling.re-use/recyclingJanuary 2019
PipelinesBuried pipelines will be left in situ. Remediation for any exposed sectionssections.January 2019  
Bains Decommissioning Programmes (PDF, 2.57 MB, 36 pages) Spirit Energy Production UK Limited -Subsea InstallationRemoval removed to shore for reuse/recycling.re-use/recyclingJanuary 2019
PipelinesDecommissioned to be decommissioned in situ.situJanuary 2019  
Jacky (PDF, 2.34 MB, 52 pages) Ithaca Energy (UK) Limited -Wellhead Platform and Midline Tee StructureRemoval removed to shore for either reusere-use or recycling.recyclingOctober 2018
PipelinesPipelines are trenched and buried and will be left in situOctober 2018  
Brae Bravo Topsides, Flare Bridge, Flare Tower and Flare Jacket and Substructure (PDF, 4.9 MB, 52 pages)Marathon Oil UK LLCTAQA Bratani Limited-Brae Bravo Topsides, Flare Bridge, Flare Tower and Flare Jacket/SubstructureRemoval removed to shore for either reusere-use or recyclingAugust 2018  
Brent Alpha, Bravo and Charlie Topsides (PDF, 3.34 MB, 81 pages)Shell U.K. Limited-TopsidesBrent removedAlpha, Brent Bravo and Brent Charlie TopsidesRemoval to shore for recycling/disposalAugust 2018  
Stirling A33 WHPS Decommissioning Programme (PDF, 1.13 MB, 27 pages)Premier Oil E&P UK Limited-Subsea installation removed to shore for recyclingMay 2018

Stirling WHPS Close Out Report (PDF, 2.57 MB, 15 pages)

FebruaryPremier 2019Oil E&P UK Limited-Subsea installationRemoval to shore for recyclingMay 2018
Ann and Alison (PDF, 2.98 MB, 60 pages) Spirit Energy North Sea Limited -Subsea installationsRemoval and surface laid pipelines recovered to shore for either reusere-use or recycling.recyclingApril 2018
PipelinesBuried and stable pipelines left in situ. Surface laid pipelines removed to shore for re-use or recyclingApril 2018  
Saturn (Annabel) (PDF, 2.49 MB, 47 pages) Spirit Energy North Sea Limited -Subsea installationsRemoval and surface laid pipelines recovered to shore for either reusere-use or recycling.recyclingApril 2018
PipelinesBuried and stable pipelines left in situ. Surface laid pipelines removed to shore for re-use or recyclingApril 2018  
Audrey (PDF, 2.87 MB, 58 pages) Spirit Energy North Sea Limited -Topsides2 andfixed jacketsplatformsRemoval removedof totopsides shore for recycling/disposal and surfacejackets laid pipelines recovered to shore for eitherrecycling reuse or recycling.disposalApril 2018
PipelinesBuried and stable pipelines leftdecommissioned in situ. Surface laid pipelines removed to shore for re-use or recyclingApril 2018  
Rev Decommissioning Programme (PDF, 12 MB, 42 pages)Repsol Norge AS-BuriedPipelinesFully buried and stable pipeline to be left in situ. RemainingAll other pipelines recovered to shorebe alongremoved. withAll mattresses.mattresses on pipelines to be removedApril 2018  
Markham ST-1 (PDF, 2.39 MB, 49 pages)

Markham ST-1 Close Out Report (PDF, 6.19 MB, 68 pages)

Centrica Production Nederland B.V. Spirit Energy Nederland B.V.Fixed PlatformRemoval removed to shore for reuse/recyclingeither andre-use or recyclingFebruary 2018, Close Out Report Received July 2021
PipelinesTwo pipelines to be leftdecommissioned in situ.situFebruary 2018Markham2018, ST-1 Close Out Report Received July 2021
Osprey (PDF, 6.193.92 MB, 68 pages)July 2021

Osprey Close Out Report (PDF, 3.921.71 MB, 6834 pages)

Fairfield Fagus Limited -Subsea InstallationRemoved removedand recovered to shore for recycling/disposal.recycling/disposalDecember 2017 Close Out Report Approved January 2021
PipelinesFull removal with the exception of the Bundles, Umbilical Risers within the Dunlin Alpha Concrete Gravity Based Structure or those trenched,trenched and rock dumped.dumpedDecember 2017Osprey Close Out Report Approved January 2021
Merlin (PDF, 1.712.97 MB, 3456 pages)January 2021

Merlin Close Out Report (PDF, 2.971.47 MB, 5627 pages)

Fairfield Fagus Limited -Subsea InstallationRemoved removedand recovered to shore for recycling/disposal.recycling/disposalDecember 2017 Close Out Report Approved January 2021
PipelinesFull removal with the exception of trenched and rock dumped pipelinesPipelines and umbilicalsUmbilicals and umbilicalUmbilical riserRiser within the Dunlin Alpha Concrete Gravity Based Structure.StructureDecember 2017Merlin Close Out Report (PDF,Approved 1.47 MB, 27 pages)January 2021
Dunlin Fuel Gas Import (DFGI) and Dunlin Power Import (DPI) (PDF, 3.48 MB, 54 pages)

DFGI/DPI Close Out Report (PDF, 2.19 MB, 30 pages)

Fairfield Fagus Limited -Subsea InstallationRemoved removedand recovered to shore for recycling/disposal.recycling/disposalDecember 2017 Close Out Report Approved January 2021
PipelinesFull removal with the exception of trenched and rockburied dumpedPipelines pipelines and rigidRigid riserRiser and riserRiser cableCable within the Dunlin Alpha Concrete Gravity Based Structure.StructureDecember 2017DFGI/DPI Close Out Report (PDF,Approved 2.19 MB, 30 pages)January 2021
Viking Satellites CD, DD, ED, GD, HD Pipelines (PDF, 6.77 MB, 32 pages)ConocoPhillips (U.K.) Limited-PipelinesAll pipelines and associated mattresses to remain in situ.situNovember 2017  
LOGGS Satellites Vulcan UR, Viscount VO, Vampire OD - LDP1 (PDF, 17.5 MB, 61 pages) ConocoPhillips (U.K.) Limited -Topsides3 x fixed platforms - Vulcan UR, Viscount VO and jacketsVampire removedODRemoval to shore of topsides and jackets for recycling/disposal.recycling/disposalNovember 2017
PipelinesAll pipelines and associated mattresses to remain in situ.situNovember 2017  
Leman BH Decommissioning Programme (PDF, 4.66 MB, 46 pages)Shell U.K. Limited-Topside and jacket removed to shore for reuse/recycling.April 2017

Leman BH Close Out Report (PDF, 1.71 MB, 25 pages)

Shell U.K. Limited-1 x platformRemoval to shore for either re-use or recyclingApril 2017 Close Out Report Approved March 2019
Ettrick and Blackbird (PDF, 2.1 MB, 62 pages) Nexen Petroleum U.KUK Limited -FPSORemoval removed for reusere-use at different location.locationMarch 2017
Subsea equipmentEquipmentRemoval removed to shore for reuse/recycling.either Buriedre-use pipelinesor recyclingMarch 2017
PipelinesRemoval to beshore leftfor ineither siture-use withor therecycling; remainingburied pipelines removed to shore.be left in-situMarch 2017  
Ann A4 Decommissioning Programme (PDF, 1.37 MB, 29 pages)Centrica North Sea Limited- WHPSA4 toWellhead beProtection removedStructureRemoval to shore for reuse/recycling.either re-use or recyclingFebruary 2017  
Janice James & Affleck (PDF, 3.8 MB, 115 pages) Maersk Oil UK Limited -FPSORemoval removed to shore for recycling.recyclingSeptember 2016
Subsea equipmentEquipmentRemoval removed to shore for reuse/recycling.either Buriedre-use pipelinesor recyclingSeptember 2016
PipelinesRemoval to beshore leftfor ineither siture-use withor therecycling; remainingburied pipelines removed to shore.be left in-situSeptember 2016  
Athena Decommissioning Programmes (PDF, 3.88 MB, 70 pages) Ithaca Energy (UK) Limited -FPSORemoval removed for reusere-use at different location.locationSeptember 2016
Subsea equipmentEquipmentRemoval removed to shore for reuse/recycling.either re-use or recyclingSeptember 2016
PipelinesAll pipelines32 pipeline to be removed and returned to shore.shore for re-use or recyclingSeptember 2016  
Viking Platforms (PDF, 3.53 MB, 40 pages)ConocoPhillips (U.K.) Limited-Topsides5 andx jacketsfixed toplatforms beViking removedCD, DD, ED, GD, HDRemoval to shore of topsides and jackets for recycling/disposal.recycling/disposalSeptember 2016  
Leadon (PDF, 1.71 MB, 53 pages) Maersk Oil North Sea UK Limited -FPSORemoval removed for reusere-use at different location.locationMarch 2016
SubseaRemoval of 2 x bundle towheads and mid-line structure to shore for disposal; removal of 2 x drill centres to shore for disposal.disposalMarch 2016
Pipelines2 x pipelinePipeline bundles to be left inin-situ, situ, partial removal of gas import pipeline.pipelineMarch 2016  
Harding STL (PDF, 2.61 MB, 73 pages)

Harding STL Close-Out Report (PDF, 1.62 MB, 26 pages)

TAQA Bratani Limited-Harding Submerged Turret Loading (STL) SystemHarding Submerged Turret Loading (STL) System to be replaced by new Offshore Loading System. STL to be removed to shore for recycling/disposal and shuttle tanker mooring and loading buoy interfaces returned to owner.ownerDecember 2015Harding STL Close-Out Report (PDF, 1.62 MB, 26 pages)June 2017
Thames Area – Horne & Wren (PDF, 1.57 MB, 48 pages) Tullow Oil SK Limited -1x fixed platformRemoval of topsides and jackets to shore for recycling/disposal.recycling/disposalNovember 2015
PipelinesTo to remain buried in situ.situNovember 2015  
Thames Area – Orwell (PDF, 828 KB, 42 pages) Tullow Oil SK Limited -Subsea InstallationsRemoval of subsea installations to shore for recycling/disposal.recycling/disposalNovember 2015
PipelinesTo to remain buried in situ.situNovember 2015  
Thames Area – Wissey (PDF, 1.26 MB, 43 pages) Tullow Oil SK Limited -Subsea InstallationsRemoval of subsea installations to shore for recycling/disposal.recycling/disposalNovember 2015
PipelinesTo to remain buried in situ.situNovember 2015  
Thames Area – Thames Complex (PDF, 15.9 MB, 76 pages) Perenco UK Limited -3x fixed platformsRemoval of topsides and jackets to shore for recycling/disposal.recycling/disposalOctober 2015
Subsea InstallationsRemoval of subsea installations to shore for recycling/disposal.recycling/disposalOctober 2015
PipelinesTo to remain buried in situ.situOctober 2015  
Thames Area – Gawain (PDF, 3.8 MB, 47 pages) Perenco UK Limited -Subsea InstallationsRemoval of subsea installations to shore for recycling/disposal.recycling/disposalOctober 2015
PipelinesTo to remain buried in situ.situOctober 2015  
Thames Area – Arthur (PDF, 4.41 MB, 46 pages) Perenco UK Limited -Subsea InstallationsRemoval of subsea installations to shore for recycling/disposal.recycling/disposalOctober 2015
PipelinesTo to remain buried in situ.situOctober 2015  
Brent - Brent Delta Topside (PDF, 3.55 MB, 72 pages)

Brent Delta Topside Close Out Report (PDF, 4.42 MB, 53 pages)

Shell U.K. Limited-Brent Delta Topside Removal of topside to shore for recycling and disposal.disposalJuly 2015Brent2015, Delta Topside Close Out Report approved February 2020
Rose Decommissioning Programmes (PDF, 4.422.87 MB, 5342 pages)February 2020

Rose DecommissioningClose ProgrammesOut Report (PDF, 2.873.31 MB, 4236 pages)

Centrica Resources Limited -Subsea InstallationsRemoval of subsea installations to shore for recycling/disposal.recycling/disposalMay 2015 Close Out Report Approved October 2018
PipelinesRemoval of sections of untrenchedun-trenched pipelines,pipelines; trenched pipelines todecommissioned remain in situ.situMay 2015Rose Close Out Report Approved October 2018
Stamford (PDF, 3.312.71 MB, 3639 pages)October 2018

Stamford Close Out Report (PDF, 2.712.66 MB, 3936 pages)

Centrica North Sea Gas Limited -Subsea InstallationsRemoval of subsea installations to shore for recycling/disposal.recycling/disposalApril 2015 Close Out Report approved February 2019
PipelinesRemoval of sections of untrenchedun-trenched pipelines,pipelines; trenched pipelines todecommissioned remain in situ.situApril 2015Stamford Close Out Report (PDF,approved 2.66 MB, 36 pages)February 2019
Murchison (PDF, 2.37 MB, 70 pages) CNR -RemovalLarge ofSteel topsidesPlatformTopsides and jacketsjacket to top of footings to be removed to shore for recycling/disposal. Footings to remain in situ.situAugust 2014
PipelinesExport pipeline todecommissioned remain in situ with remedial rock placement.

Infield Flowlines to be removed for recycling/disposal.
August 2014  
Rubie & Renee (PDF, 2.47 MB, 50 pages)Endeavour Energy UK Limited-Removal of subsea installations to shore for recycling/disposal. Selective recovery of pipelines.April 2014

Rubie Renee Decommissioning Close Out Report (PDF, 9.98 MB, 66 pages)

Endeavour Energy UK LimitedHess LimitedSubsea InstallationsRemoval to shore for recycling/disposalApril 2014, Close Out Report accepted September 2021
PipelinesSelective RecoveryApril 2014, Close Out Report accepted September 2021
Miller (PDF, 6.57 MB, 198 pages)BP Exploration (Alpha) Limited - Large Steel PlatformFootings to remain in situ.place, Steelsteel topsides and jacket to top of footings to be removed to shore.shoreDecember 2013  
Schiehallion & Loyal Phase One (PDF, 1.84 MB, 60 pages)

Schiehallion & Loyal Phase One Close Out Report (PDF, 1010 KB, 22 pages)

Britoil Limited -Schiehallion FPSORemoval removed for potential reuse.re-use2013, PipelineClose recoveryOut Report Approved May 2019
PipelinesRecovery where possible. Production pipelinesflowlines to remainbe left in situ.situApril2013, 2013SchiehallionClose &Out LoyalReport PhaseApproved OneMay Close2019
IVRR Out- Reportdecommissoning programme (PDF, 10101.57 KBMB, 22102 pages)May 2019

IVRR -Close decommissoningOut programmeReport (PDF, 1.574.74 MB, 10235 pages)

Hess Limitedlimited - FPSO removedRemoval for reusere-use at different location.location2013
Subsea installationsRemoval of subsea installations to shore for recycling/disposal. recycling/disposal2013
PipelinesSelective recovery of pipelines.February 2013
IVRR Close Out ReportCamelot (PDF, 4.74488 MBKB, 3539 pages)December 2015

Camelot Close out report (PDF, 4882.27 KBMB, 3941 pages)

Energy Resource Technology (UK) Limited -RemovalSmall ofSteel platformPlatformRemoval to shore for recycling/disposal.recycling / disposal2012
PipelinesPipelines todecommissioned remain in situ.situJune 2012
CamelotFife, CloseFlora, outFergus, reportAngus: decommissioning programme (PDF, 2.278.36 MB, 41135 pages)August 2013

Fife,FFFA Flora,Close Fergus,Out Angus: decommissioning programmeReport (PDF, 8.361.49 MB, 13533 pages)

Hess Limited -FPSORemoved removed for reusere-use at different location.location2012
Subsea installationsRemoval of subsea installations to shore for recycling/disposal.recycling Removal/ of untrenched pipelines, trenched pipelines to remain in situ.disposalFebruary 2012
FFFAPipelinesFull Closeremoval Outof Reportun-trenched (PDF,pipelines; 1.49trenched MB,pipelines 33decommissioned pages)in situDecember 20142012
Don (PDF, 8 MB, 175 pages) Britoil Public Limited Company -RemovalSubsea of subsea installationRemoval to shore for recycling/disposal.recycling / disposal2011
PipelinesDecommissioned to remain in situ with selective recovery.recoveryMay 2011  
Welland

Welland DPClose Out Report (PDF, 1.747.42 MB, 39130 pages)

Perenco UK Limited -Small Steel PlatformRemoval offor subseare-use installationoutside toof shoreUK forwaters2010, recycling/disposal.Close PipelinesOut toReport remainApproved October 2020
PipelinesDecommissioned in situ with selective recovery.recoverySeptember2010, 2010Welland Close Out Report (PDF,Approved 7.42October MB, 130 pages)September 2020
Tristan NW DP (PDF,

4.11Close MB,out 119 pages)report

Silverstone Energy Limited Bridge Energy UK LimitedRemovalSubsea of subsea installationRemoval to shore for recycling.recycling2010; close-out report received January 2011
PipelinesProduction pipeline with piggy-backed umbilical - leave in situ; jumpers, spool pieces and associated pipeline equipment - remove to shore for re-use or recycling.recyclingAugust2010; 2010Tristanclose-out NW close out report (PDF,received 2.3 MB, 23 pages)January 2011
Shelley DP (PDF,

3.23Close MB,out 83 pages)report

Premier Oil -Sevan Voyageur FPSOTow removedaway for reusefuture use at differentanother location.location2010; Removalclose-out ofreport subseareceived installationsFebruary 2012
Manifold and WellheadRemove to shore for recycling/disposal.re-use, Productionrecycling pipelineor todisposal2010; remainclose-out inreport situ.received UmbilicalFebruary removed in sections.2012
June 2010PipelinesShelleyProduction closepipeline out- reportleave (PDF,in 4.49situ; MB,umbilical 62- pages)remove in sections2010; close-out report received February 2012
Kittiwake SalSAL DPExport System (PDF,

4.28Close MB,out 87 pages)report

Venture North Sea Oil Limited -Kittiwake SAL AssemblySAL Assembly - removal to shore for re-use. Revision to approved decommissioning programme: Completion of the removal of the SAL Assembly extended to 31 July 2012.20122009; Theclose-out report received July 2012
PipelinesPipeline - flexible flowline removed to shore for re-use.re-useJune2009; 2009Kittiwakeclose-out Sal close out report (PDF,received 588 KB, 13 pages)July 2012
MCP-01 DP (PDF,

7.41Close MB,out 336 pages)report

Total E&PE& P UK Limited-ConcreteManifold substructure& toCompression remainPlatformPermit ingranted situ;for the disposal in-situ of the concrete substructure; topsides to be removed to shore for re-use, recycling or disposal.disposalSeptember2008; 2007MCP-01close-out close out report (PDF,received 23.1 MB, 113 pages)March 2013
Kittiwake BuoyLoading DPBuoy (PDF, 3.46 MB, 118 pages)Venture North Sea Oil Limited-Exposed Location Single Buoy Mooring System (ELSBM)Removals removal to shore for recycling or disposal.disposalMay 2008  
Linnhe (PDF, 2.25 MB, 66 pages)</p>Linnhe Close Out Report (PDF, 1000 KB, 22 pages) Mobil North Sea LLC -Wellhead Protection StructureRemoval ofto WHPSshore. Revision to shoreapproved fordecommissioning recycling.programme: Removalcompletion of subseathe installationsremoval toof shorethe forWellhead recycling/disposal. PipelinesProtection Structure extended to remain30 June 20102008; year of revised approval: 2010
PipelinesDecommissioned in situ; pipeline sections outside trenches removed to shore. Revision to approved decommissioning programme: completion of the abandonment of the pipelines extended to 30 June 2010July2008; 2008year of revised approval: 2010
LinnheIndefatigable Close(Shell) Out Report (PDF, 100011.6 KBMB, 22224 pages)November 2013
</p>IndefatigableClose (Shell)Out Report (PDF, 11.62.47 MB, 22464 pages) Shell UKU.K. Limited -Removal6 ofx installationsfixed steel platformsRemoval to shore.shore2007
Pipelines2 Infieldx andhose exportbundles pipelinesremoval to remainshore; in5 situ;x hoseinfield bundles+ removedexport todecommissioned shore.in situMay 2007
CloseNW OutHutton: Reportdecommissioning programme (PDF, 2.4714.9 MB, 64320 pages)December 2014

NWClose Hutton:Out decommissioning programmeReport (PDF, 14.92.52 MB, 32032 pages)
Amoco (U.K.) Exploration Company - now a subsidiary of BP plc -Large Steel PlatformFootings to remain in place, steel topsides and jacket to top of footings to be removed to shore. Pipelines to remain in situ.shoreFebruary 2006
ClosePipelinesDecommissioned Outin Report (PDF, 2.52 MB, 32 pages)situOctober 20142006
ArdmoreBritish American Offshore Limited-Mobile Jack-Up rig removed for reuse.Rig2005Re-use 2005 
Ardmore Ugland Nordic Shipping AS -Single Anchor Loading SystemsRe-use/removal to be removed to shore for reuse. Pipelines to be removed for reuse2005
 Pipelines Re-use2005
ArdmoreAcorn Oil & Gas Limited-Subsea equipment including guide frameRemoval removed to shore.shore2005  
Brent Flare DP (PDF, 2.93 MB, 122 pages)Shell-Brent FlareRemovals removal to shore for recycling and disposal.disposal2004  
BeatriceTalisman Energy (UK) Limited-PlatformsFixed toSteel be removed for reuse.Platforms2004Re-use 2004 
Forbes and Gordon Infield PipelinesBHP Billiton-Infield PipelinesDecommission to be left in situ - retrench any area of pipeline with less than 0.4m depth of cover.cover2003-2003; close-out report received May 2005
Frigg DPTP1, (PDF,QP 10& MB,CDP1 450

pages)Close out report

Total E&P Norge AS-Treatment Platform 1 (TP1), Quarters Platform (QP) and Concrete Drilling Platform 1 (CDP1)Concrete substructures to remain in place; concrete topsides to be removed to shore; steel installations to be removed to shore; infield pipelines to be removed to shoreMay 2003Frigg close out report (PDF, 3.46 MB, 62 pages)May 2011
DurwoodDurward and DauntlessAmerada Hess-PipelinesDecommissioned to be left in situ.situ2002  
HuttonKerr McGee Kerr-McGee -Tension Leg PlatformRe-use2002; toclose-out bereport removedreceived forJuly reuse. 2004
Pipelines1 pipelinex toremoval be removed to shore.shore; 1 pipelinex todecommissioned bein leftsitu in(with situ.future monitoring programme)2002-2002; close-out report received July 2004
Camelot CBExxonMobil-Fixed Steel PlatformRe-use or removal to beshore removedfor recycling. Revision to approved decommissioning option: removal to shore for reusedismantling orand recycling.recycling20012001. Year of revised approval: 2002  
Blenheim and Bladon Talisman -FPSO to be removed for reuse. Pipelines to be removed to shore.Re-use2000
 Pipelines Removal to shore2000
Durwood Durward and Dauntless Amerada Hess -FPSO to be removed for reuse. Re-use2000
Subsea facilitiesFacilitiesRemoval removal to shore.shore2000  
Maureen and Moira Phillips -PlatformLarge removalSteel Gravity PlatformRemoval to shore for reusere-use or recycling. recycling2000
Concrete Loading ColumnRemoval removal to shore for reusere-use or recycling. recycling2000
Pipelines2 pipelinesx removal to shore.shore;1 1x pipelinedecommissioned to be left in situ.situ2000  
Brent SparShell-Oil Storage and Loading FacilityRe-use to be removed for reuse as part of quay extension. Revision to approved decommissioning option: Brent Spar Anchor Blocks - removal to shore for reuse, recycling or disposal 1998 Year of revised approval: 2004 
DonanBP-FPSO to be removed for reuse.1998Re-use 1998 
Fulmar SALM Shell -Single Anchor Leg Mooring BuoyRemoval to beshore1998
16” removed to shore. PipelineDecommissioned to be left in situ.situ1998  
Emerald MSR -FPSO to be removed for reuse. Pipeline to be left in situ.Re-use1996
 Pipeline Decommissioned in situ1996
Frigg FPElf NorgeTotalFinaElf NorgeFlare columnColumnRemoval to be removed to shore.shore1996  
Leman BKShell-PlatformFixed removalSteel PlatformRemoval to shore.shore1996  
StaffaLasmo-PipelinePipelinesRemoval to be removed to shore.shore1996  
Viking AC, AD, AP & FDConoco-Platforms4 tox beFixed removedSteel PlatformRemoval to shore.shore1996  
Esmond CP & CWBHP-Platforms2 tox beFixed removedSteel PlatformRemoval to shore.shore1995  
Gordon BWBHP-PlatformFixed toSteel bePlatformRemoval removed to shore.shore1995  
AngusAmerada Hess-FPSOFloating toProduction, beStorage removedand forOffloading reuse.(FPSO) Vessel1993Re-use 1993 
Forbes AWHamiltonBHPPlatformFixed toSteel bePlatformRemoval removed to shore.shore1993  
Argyll, Duncan and Innes Hamilton BHPFPSOFloating toProduction, beFacility removed(FPF)Removal to shore. shore1992
Catenary Anchor Leg Mooring (CALM) BuoyRemoval to be removed to shore. Pipelines to be removed to shore.shore1992
 Pipelines Removal to shore1992
BlairSun OilAGIPPipelines1 pipelinex removalRe-use; for reuse. 1 pipelinex toDecommissioned be left in situ.situ1992  
Crawford Hamilton Oil BHPFPFFloating toProduction, beFacility removed(FPF)Removal to shore. shore1991
Catenary Anchor Leg Mooring (CALM) BuoyRemoval to be removed to shore. shore1991
Subsea facilitiesFacilitiesRemoval removal to shore.shore1991  
Piper AlphaOccidentalTalismanPlatformFixed leftSteel in situ.Platform1988Toppling 1988 

Notification of disused pipelines

(the DPN form to take pipeline(s) out of use is currently being updated. A copy can be made available on request at odu@beis.gov.uk)

During the course of a field’s life, pipelines/sections of pipelines may be taken out of use, e.g. due to corrosion, problems with reservoir pressure, damage to the pipeline, etc. When this happens, under the Petroleum Act 1998 the Secretary of State has the option of immediately calling for a full decommissioning programme. This is not always considered an appropriate option however, and so it has been agreed consideration will be given to handling suitable pipelines, under an informal decommissioning regime, thereby deferring a formal programme until the end of the field’s life.

If a formal decommissioning programme is not immediately deemed suitable, details of the out of use pipeline(s) will be circulated to other government departments for comment. Following this, OPRED will decide one of the following:

  • we are content with the proposals for monitoring and maintaining the out-of-use pipeline
  • we request additional information or further remedial action
  • we request a formal decommissioning programme

The Interim Pipeline Regime is intended to ensure out of use lines do not pose a risk to other users of the sea or the environment and that they are covered by an appropriate surveying and maintenance regime from the point when they are taken out of use until approval of the formal decommissioning programme, which is usually at the end of field life. It should be noted that any interim solution should not prejudice the final decommissioning options for that line, including complete removal. The department expects operators to submit details of out of use pipelines/sections of a pipeline as soon as they are taken out of use.

Operators are reminded that any works that are proposed on any pipelines under the Pipeline Works Authorisation regime, as per their Terms and Conditions of the PWA, must have a legal consent in place before works can commence which includes but is not exclusive to any proposed decommissioning works. Consents are issued by the Oil & Gas Authority and operators are requested to email consents@ogauthority.co.uk on any queries that they may have relating to legal consents. Further guidance can also be found on the Oil & Gas Authority website.

Once the necessary legal consent has been issued by OGA, Consents & Authorisations Section, Operators are to email a completed DPN form to odu@beis.gov.uk.

If you are an operator, aware of any out of use pipelines that have not been referred to the department, please submit a completed DPN form at your earliest convenience.

Following confirmation a pipeline has been accepted under the Interim Pipeline Regime, the Offshore Decommissioning Unit will continue to monitor the condition of the pipeline by asking the Operator to confirm the status of the pipeline remains unchanged following future surveys.

Further information

A list of all installations on the UKCS and their current status is available from the OSPAR Website

At the first ministerial meeting of the Commission for the Protection of the Marine Environment of the North East Atlantic (OSPAR) in 1998, a binding decision was agreed that set rules for the disposal of offshore installations at sea. Under the decision the dumping and leaving wholly or partly in place of offshore installations is prohibited. Decision 98/3 recognises it may be difficult to remove the ‘footings’ of large steel jackets weighing more than 10,000 and concrete installations. As a result there are derogations for these categories of installations if the internationally agreed assessment and consultation process shows leaving them in place is justifiable.

OPRED has utilised decommissioning programme templates for derogation and non-derogation projects. These templates include all required content as detailed in Annex C of the guidance notes. There are also templates available which are currently being trialled for more specific and small scale decommissioning activity including rig reactivation and removal of a single Wellhead Protection Structure. Operator’s should discuss all individual cases with OPRED who will advise of the appropriate template.

A Standard Decommissioning Programme Template (Non-Derogation Cases) (PDF, 1.03 MB, 34 pages) is available - (November 2018).

A Standard Decommissioning Programme Template (Derogation Cases) (PDF, 1.11 MB, 37 pages) is also available (November 2018).

A word version of these templates can also be requested from OPRED. Please email odu@beis.gov.uk for further details.

Cost recovery

OPRED will charge a fee in respect of offshore (oil and gas) installations and pipelines decommissioning programmes under the Petroleum Act 1998. Guidance, including the indicative fee structure, is available in Guidance on charging a fee for offshore (oil and gas) installations and pipelines under the Petroleum Act 1998 (PDF, 308 KB, 9 pages)

Published 23 January 2013
Last updated 207 AprilMarch 2022 + show all updates
  1. Approval of Decommissioning Programme

  2. New DPs out to consultation

  3. wenlock DP approval re-added appears to have been deleted in error

  4. Consultation DP

  5. Approved DP

  6. Approved DP

  7. DP approval

  8. Draft programme for consultation

  9. DP approval

  10. Consultation DP added

  11. DP approved

  12. Causeway and Fionn DP consultation

  13. DP approval

  14. Decommissioning Programme for consultation

  15. Decommissioning Programmes added for Public Consultation

  16. Acceptance of Close Out Report

  17. DP Consultation

  18. COR accepted

  19. Consultation DP added

  20. ensign DP approved

  21. Consultation DP

  22. markham close out report added

  23. Consultation DP

  24. DP approval

  25. Cost recovery consultation impact assessment added

  26. DP Approval

  27. DP approval

  28. newly approved DP

  29. Decommissioning programme for consultation

  30. Consultation draft DP added

  31. Edited 'Overview' section to publish details of consultation on proposed changes to fee charging regime.

  32. interim CORs added for Banff FPSO and SAL buoy DPS

  33. approval of Gaupe DP

  34. Approval of Decommissioning Programme

  35. DP approved

  36. Adding an approved DP

  37. Consultation DP

  38. DP approved

  39. Approved Decommissioning Programme

  40. Decommissioning Programmes for consultation

  41. DP approved

  42. DP approved

  43. DP approved

  44. COR added

  45. Approved DPs added

  46. Close Out Reports Approved

  47. Adding A Decommissioning Programme which is out to Public Consultation.

  48. Consultation DPs added

  49. Consultation DP added

  50. Consultation DP added

  51. Approval of Decommissioning Programme

  52. Decommissioning Programme Approved

  53. Approval of preparatory works

  54. Consultation DP added

  55. Accepted Close Out Report added

  56. Approval of Decommissioning Programme

  57. Five new DPs out to consultation

  58. A new DP is out to public consultation

  59. draft DP added

  60. Decommissioning Programmes for consultation

  61. Approval of A DP and Derogation

  62. Draft decommissioning programme for consultation

  63. Decommissioning Programme for consultation

  64. document replaced with updated version

  65. Decommissioning Programme Approval

  66. Approved Decommissioning Programme

  67. Consultation DP added

  68. DP has been approved

  69. Decommissioning Programme for consultation

  70. A DP has been added for public consultation

  71. Approval of Decommissioning Programme

  72. Approved DP added

  73. Approval of Decommissioning Programme

  74. approval of Eider topsides DP

  75. A Decommissioning Programme has been approved

  76. consultation DP added

  77. Approval of a DP

  78. Approved DP

  79. Approval of a DP

  80. Decommissioning Programme for consultation

  81. Approved DP

  82. Decommissioning Programme now approved

  83. Consultation DPs

  84. Decommissioning Programme for consultation

  85. CoR added to website

  86. DP approval

  87. Huntington Consultation DP added

  88. New Decommissioning Programmes out to consultation.

  89. New DP out to consultation

  90. New DP out to consultation

  91. Decommissioning Programmes for consultation

  92. Decommissioning Programme for consultation

  93. Decommissioning Programme for consultation

  94. Approved of Banff SAL Buoy DP

  95. Consultation of Cavendish Decommissioning Programme

  96. MacCulloch DP approved

  97. New approved DP

  98. Consultation of Ensign

  99. Approval of Decommissioning Programme

  100. Approval of South Morecambe DP3/DP4 Decommissioning Programmes

  101. Pickerill installations DP approved

  102. Minke DP approved

  103. Banff SAL buoy DP for consultation

  104. Addition of two approved decommissioning programmes

  105. Added the approved Juliet DP to the website

  106. PL5 approved

  107. NNP approved

  108. Decommissioning Programme for consultation

  109. Consultation of MacCulloch Field Decommissioning Programmes

  110. Revised CAs for Brae A, Brae B and East Brae

  111. Approval of Nevis N11 WHPS Decommissioning Programme

  112. Change of email to a generic one rather than a personal email.

  113. Schiehallion & Loyal Phase One Close Out Report Approved

  114. Approval of the Dunlin Alpha Topsides Decommissioning Programme

  115. Update of the content of the DP

  116. Approval of Hewett Vent Stack DP

  117. consultation closed

  118. Consultation DP and supporting documents for PL5

  119. Minke and Juliet consultation DPs published

  120. Addition of Close Out Report

  121. New Approved Programme

  122. New programme for consultation

  123. Publishing approved Curlew DP

  124. Morecambe DPs published for consultation

  125. Added a CoR

  126. Addition of Close Out Report

  127. Approved DPs for VDP2 and VDP3 added

  128. Addition of approved DPs for Tyne South Installations and Guinevere Installation

  129. Addition of approved decommissioning programme

  130. Approval of a Decommissioning Programme

  131. Addition of Brent Delta Close Out Report

  132. Addition of 2 decommissioning programmes for consultation

  133. Update decommissioning templates added

  134. Guidance document was updated and uploaded

  135. Adding Goldeneye DP for consultation.

  136. Jacky Decommissioning Programmes Approved

  137. Approval of Close out Report

  138. Approval of Decommissioning Programme

  139. VDP2 and VDP3 consultation draft Decommissioning Programmes added

  140. Approval of Brent Alpha, Bravo and Charlie Topsides Decommissioning Programme

  141. Offshore Oil and Gas Decommissioning Programme out to consultation

  142. Addition of a new decommissioning programme for consultation

  143. Tyne South and Guinevere Installation Decommissioning Programmes published for consultation

  144. Addition of Curlew DPs, CA and EIA for Public Consultation.

  145. Decommissioning Programme Approved

  146. Updated Offshore decommissioning guidance has been added

  147. Ann & Alison, Saturn (Annabel) and Audrey DPs have been approved

  148. Changed document to final version

  149. A decommissioning programme has been approved

  150. Approved Markham DP

  151. Bains Documents Added

  152. Updated Environmental Guidance on Decommissioning

  153. Jacky DP Consultation

  154. Draft Consultation Decommissioning Programme uploaded

  155. Updated guidance for Offshore Decommissioning on website for feedback

  156. Addition of approved DPs

  157. Approved DPs added

  158. Saturn Annabel, Audrey and LDP1 Programmes for public consultation

  159. DPN form corrected

  160. generic email address added and DPN form updated (with generic email address)

  161. Ann and Alison DP's and associated documents added for public consultation

  162. Fairfield Fagus Limited's Dunlin Fuel Gas Import and Power Import, Merlin and Osprey Decommissioning Documents uploaded

  163. Brae Area DPs and associated documents available for consultation

  164. Harding STL Close Out Report added

  165. Disused Pipeline Notification Form revised - 03 May 17

  166. Leman BH Decommissioning Programme approved

  167. Approval of Ettrick and Blackbird DP

  168. Ninian North Platform documents published for public consultation A4 Programme approved

  169. Brent Decommissioning Programmes published for consultation

  170. IVRR Close Out Report added

  171. Ann A4 Installation Decommissioning Programme added for consultation

  172. Approved Decommissioning Programmes added

  173. Atlantic and Cromarty Draft Decommissioning Programmes Consultation

  174. references of DECC amended to BEIS (including DPN form)

  175. Janice, James & Affleck Fields - Draft programmes under consideration (added)

  176. Markham ST-1 Decommissioning Programmes - (added)

  177. Oil & Gas: Update Notification of Disused Pipelines

  178. Oil & Gas: Update Table of draft decommissioning programmes under consideration.

  179. Leadon Decommissioning Programmes - (added)

  180. Notification of Disused Pipelines form - (updated)

  181. Harding STL approved decommissioning programme - (added)

  182. Thames Area - Horne & Wren, Orwell and Wissey approved decommissioning programmes - (added)

  183. Fife, Flora, Fergus, Angus: decommissioning programme FFFA Close Out Report - (added)

  184. Thames Area – Thames Complex, Gawain & Arthur - Approved decommissioning programmes - (added)

  185. Viking Satellites CD,DD,ED,GD,HD draft decommissioning programmes under consideration - (added)

  186. Oil and Gas: Updated document for Harding STL Decommissioning Programme

  187. Oil and Gas: Updated “Table of approved decommissioning programmes” table.

  188. Leman BH draft decommissioning programme - (added)

  189. Oil and Gas: Addition of Brent field to approved decommissioning programme

  190. Oil and gas: Rose approved decommissioning programme - (added)

  191. Decommissioning - Leadon draft programme, follow up consultation - (added)

  192. Oil and gas: Stamford decommissioning programme - (added)

  193. Oil and gas: Rose Field decommissioning programmes - (added)

  194. Oil and gas: Brent – Brent Delta Topside draft decommissioning programme - (added)

  195. Oil and Gas: Addition of Stamford Field to decommissioning programmes table

  196. Oil and Gas: Updated the disused pipeline notification form

  197. Oil and gas: Decommissioning - Streamlined Decommissioning Programme Template (Derogation Cases) - (added)

  198. Oil and gas: NW Hutton close out report - (added)

  199. Oil and gas: Decommissioning draft prgrams - Thames - (added)

  200. Oil and gas: Indefatigable (Shell) close out report - (added)

  201. Oil and gas: Streamlined Decommissioning Programme Template (Non-Derogation Cases) - (updated)

  202. Oil and gas: Murchison approved decommissioning programme - (added)

  203. Oil and gas: Rubie & Renee - Approved decommissioning programme - (added)

  204. Oil and gas: Decommisiioning Linhe close out report - (added)

  205. Oil and gas: Streamlined Decommissioning Programme Template (Non Derogation Cases) - updated

  206. Oil and gas: Leadon Draft Decommissioning Programme - added

  207. Oil and gas: Miller decommissioning programme - (added)

  208. Oil and gas: Rubie/Renee Draft Decommissioning Programme - (added)

  209. Camelot close out report - added

  210. Added Murchison draft decommissioning programme

  211. Added streamlined decommissioning programme template

  212. Re-created table, added H2's and anchors

  213. First published.