Change of https://www.gov.uk/guidance/the-2020-eia-regulations

Change description : 2025-02-24 13:43:00: Schedule 3 Projects Register updated. [Guidance and regulation]

Showing diff : 2025-02-17 13:42:08.257495887 +00:00..2025-02-24 13:43:45.441459369 +00:00

Guidance

The 2020 EIA Regulations

The 2020 EIA Regulations

From 1st January 2021

Environmental Impact Assessments (EIA)

Projects listed in Schedule 1 of the 2020 EIA Regulations are subject to an EIA process as required by regulation 5(1). Projects listed in Schedule 2 are subject to a screening process to determine if an EIA is necessary, but the developer may wish to undertake an EIA as set out in regulation 5(2)(b), if they choose. To access further information on projects which are subject to the EIA process, please use the relevant link below.

Environmental Impact Assessments (EIA) - Transitional Cases

For projects where the Oil and Gas Authority decision on whether to grant consent is pending at the time when the 2020 EIA Regulations came into force, EIA’s are subject to the provisions of regulation 29 (Transitional and Saving Provisions relating to the 1999 Regulations). To access further information on EIA projects which are subject to the provisions of regulation 29, please use the relevant link below.

Screening Directions

Projects listed in Schedule 2 of the 2020 EIA Regulations require a screening direction in accordance with regulation 5(2)(a) to determine if an EIA is necessary. Screening directions for projects which have been through the screening process since 1st January 2021 can be accessed using the link below.

Deep Drilling Screening Directions

Pipeline Screening Directions

Production Screening Directions

Regulation 5(3) Decisions that No environmental impact assessment is needed without a screening direction

Schedule 3 Projects

The 2020 EIA Regulations provide that projects that fall under Schedule 3 do not require an EIA where the Secretary of State considers that the project is not likely to have a significant effect on the environment pursuant to regulation 7. Those projects are:

  • The construction of a pipeline for the transport of oil, combustible gas, or chemicals, or for the transport of carbon dioxide streams for the purposes of geological storage of carbon dioxide, or the maintenance, repair, replacement, protection or extension of an existing pipeline constructed for those purposes where no part of the pipeline or related works would extend more than 500 metres from a well or any part of an installation to which that pipeline would be directly or indirectly attached.

A list of Schedule 3 project decisions made since 1st January 2021 can be accessed at the following link:

Updates to this page

Published 5 January 2021
Last updated 1724 February 2025 + show all updates
  1. Schedule 3 Projects Register updated.

  2. Schedule 3 Projects Register updated

  3. Schedule 3 register updated

  4. Uploaded Schedule 3 Projects Register w.c. 03.02.2025

  5. Schedule 3 Register updated.

  6. Schedule 3 Projects Register updated

  7. Deep Drilling Screening Directions 2025 Environmental Impact Assessments (EIA) 2025

  8. Schedule 3 Projects Register - updated

  9. Schedule 3 Projects Register updated

  10. Updated SNS Activity Tracker W/C 16/12/2024.

  11. Schedule 3 Projects Register - uploaded

  12. Schedule 3 Projects Register updated.

  13. Schedule 3 Projects Register - Uploaded

  14. Schedule 3 Projects Register- Uploaded

  15. Schedule 3 Projects Register- uploaded

  16. Schedule 3 Projects Register - file attachment updated

  17. Schedule 3 Projects Register updated

  18. Update Schedule 3

  19. Schedule 3 Spreadsheet updated.

  20. Schedule 3 Projects Register updated.

  21. Schedule 3 Projects Register updated

  22. Schedule 3 Projects Register updated

  23. Schedule 3 Projects Register updated

  24. Schedule 3 Projects register updated.

  25. Schedule 3 Projects Register updated

  26. Schedule 3 Projects Register updated

  27. Schedule 3 Tracker Update

  28. Schedule 3 Projects Register updated

  29. Schedule 3 Projects Register updated

  30. Schedule 3 Projects Register updated to most recent version

  31. Schedule 3 Projects Register updated

  32. Schedule 3 Projects Register updated

  33. Schedule 3 Projects Register updated

  34. Update Schedule 3 - 24.06.24

  35. Schedule 3 project register updated.

  36. Schedule 3 Projects Register Updated to most recent version

  37. Schedule 3 Projects Register updated

  38. Schedule 3 register updated

  39. Schedule 3 Projects Register updated

  40. Schedule 3 Projects Register updated

  41. Schedule 3 Projects Register updated to most recent version

  42. schedule 3 spreadsheet updated

  43. New link to 2024 Production Screening Directions added

  44. Schedule 3 update

  45. Schedule 3 Projects Register updated to most recent version

  46. Schedule 3 projects register updated.

  47. Update of Schedule 3 document

  48. schedule 3 project register updated to most recent version

  49. Schedule 3 Projects Register updated

  50. Schedule 3 Projects Register updated

  51. Schedule 3 Projects Register updated

  52. Schedule 3 Project Register updated

  53. Addition of link to 2024 PL screening directions

  54. Schedule 3 Projects Register updated

  55. Schedule 3 Projects Register updated to most recent version

  56. Schedule 3 - 29/01/2024

  57. 2024 page added

  58. Schedule 3 register updated

  59. Schedule 3 updated

  60. Link to Deep Drilling Screening Directions - 2024 added

  61. Schedule 3 spreadsheet updated

  62. Schedule 3 register updated

  63. Schedule 3 Projects register updated to most recent version

  64. Schedule 3 - Updated

  65. Schedule 3 updated

  66. Schedule 3 Projects Register updated

  67. Updated Schedule 3 Projects Register Spreadsheet

  68. Schedule 3 Projects Register updated to most recent version

  69. Schedule 3 projects register updated

  70. Update Schedule 3

  71. Schedule 3 Projects Register updated

  72. Schedule 3 Spreadsheet updated

  73. Schedule 3 Projects Register updated to most recent version

  74. Link added to EIA Submissions and Decisions - 2023 webpage

  75. Schedule 3 Projects Register updated to most recent version

  76. Schedule 3 Projects Register updated to most recent version

  77. Schedule 3 project register - updated

  78. Schedule 3 Projects register updated

  79. Schedule 3 Projects Register - file attachment UPDATED

  80. Schedule 3 Projects Register weekly update

  81. Schedule 3 Projects Register updated to most recent version

  82. Schedule 3 Projects register - weekly update

  83. Schedule 3 updated

  84. Schedule 3 spreadsheet updated

  85. Schedule 3 Projects register updated to most recent version

  86. Updated Schedule 3 Projects Register - 03/07/2023

  87. Schedule 3 Projects Register w.c. 26.06.2023 - updated

  88. Schedule 3 spreadsheet updated

  89. Schedule 3 Projects Register updated to most recent version

  90. Schedule 3 Project Register updated to most recent version

  91. Schedule 3 Projects Register - 29.05.2023 - UPDATE

  92. Current Schedule 3 Spreadsheet

  93. Schedule 3 Projects Register updated to most recent version

  94. Updated Schedule 3

  95. Schedule 3 Project Register updated to latest version

  96. add 2023 Pipeline Screening Directions link

  97. Schedule 3 projects register update

  98. Schedule 3 Projects Register updated

  99. Link added to Deep Drilling Screening Directions - 2023

  100. Schedule 3 Projects Register updated to most recent version

  101. Schedule 3 spreadsheet updated

  102. Schedule 3 Project Register updated.

  103. Most recent Schedule 3 projects register uploaded

  104. Schedule 3 register updated

  105. Updated Schedule 3 Projects Register added

  106. Updated Schedule 3 spreadsheet

  107. Schedule 3 Projects Register Updated

  108. Update to schedule 3 projects register

  109. Updated Schedule 3 Projects Register as at 22.08.2022

  110. Schedule 3 uploaded

  111. Schedule 3 Projects Register updated

  112. Schedule 3 register updated

  113. Schedule 3 Projects Register w.c. 18.07.2022 - Update

  114. Schedule 3 projects register updated

  115. Schedule 3 updated

  116. Schedule 3 updated

  117. Schedule 3 spreadsheet updated

  118. Schedule 3 register updated

  119. Schedule 3 updated

  120. Schedule 3 Projects Register updated to most recent version

  121. A link to 2022 Environmental Statements added.

  122. Schedule 3 updated

  123. Schedule 3 updated

  124. Schedule 3 register updated

  125. Schedule 3 replaced with the newest version

  126. Schedule 3 Register updated

  127. Schedule 3 Register updated

  128. Schedule 3 project register updated

  129. Update to Schedule 3 Projects Register

  130. Updated schedule 3 spreadsheet

  131. Addition of Pipeline Screening Directions - 2022

  132. Schedule 3 register updated

  133. Addition of link to Production Screening Direction 2022 page

  134. Weekly Schedule 3 Projects Register update

  135. Weekly Schedule 3 Projects Register Spreadsheet Update

  136. Weekly Update to Schedule 3 Projects Register

  137. Addition of Deep Drilling Screening Directions page for 2022

  138. Schedule 3 Project Tracker updated

  139. Schedule 3 tracking sheet updated.

  140. Schedule 3 tracking spreadsheet updated

  141. Schedule 3 register updated

  142. Schedule 3 tracker updated.

  143. Schedule 3 Projects Register updated.

  144. Weekly Schedule 3 Projects Register Spreadsheet

  145. Updated Schedule 3 register

  146. Schedule 3 tracking register updated.

  147. New schedule 3 register uploaded

  148. Schedule 3 Projects Register updated.

  149. Updated Schedule 3 register

  150. Updated Schedule 3 Projects Register,

  151. Schedule 3 Register updated

  152. updated schedule 3 register

  153. Weekly Schedule 3 Projects Register udpate

  154. Updated schedule 3 register

  155. Updated Schedule 3 Register

  156. Schedule 3 Projects Register weekly update

  157. Weekly Schedule 3 Projects Register update

  158. Schedule 3 projects register updated.

  159. Schedule 3 register updated

  160. Updated Schedule 3 Register

  161. Schedule 3 tracking spreadsheet updated.

  162. Updated Schedule 3 Register

  163. Schedule 3 tracker updated.

  164. Schedule 3 tracker updated.

  165. Schedule 3 register updated.

  166. Weekly 'Schedule 3 Projects Register' update

  167. Schedule 3 Register updated

  168. Schedule 3 tracking sheet updated.

  169. Schedule 3 Projects Register updated.

  170. Weekly Update to Schedule 3 Projects Register Spreadsheet

  171. Schedule 3 tracking updated.

  172. Schedule 3 tracking spreadsheet updated.

  173. Schedule 3 tracking spreadsheet updated.

  174. Update to Schedule 3 Projects Register

  175. Schedule 3 Projects Register updated.

  176. Addition of section for 'Environmental Impact Asssements (EIA) - Transitional Cases' within the 'Environmental Impact Assesssments (EIA)' section

  177. Weekly update to the Schedule 3 Projects spreadsheet

  178. Update of - Sched 3 spreadsheets - 25/01/2021

  179. 'Schedule 3 Projects Register' spreadsheet weekly update

  180. First published.

Sign up for emails or print this page

Update history

2025-12-15 08:57
Schedule 3 Projects Register updated

2025-12-08 16:14
Schedule 3 Projects Register – updated

2025-12-01 15:06
Schedule 3 Projects Register updated.

2025-11-24 15:58
Schedule 3 Projects Register updated.

2025-11-18 09:53
Schedule 3 updated.

2025-11-10 15:21
Schedule 3 Projects Register – Updated

2025-11-03 13:49
Schedule 3 updated.

2025-10-27 12:47
Schedule 3 Projects Register – file attachment updated

2025-10-20 11:47
Schedule 3 Projects Register updated.

2025-10-13 15:22
Schedule 3 Projects Register – Updated

2025-10-07 15:51
Schedule 3 Projects Register updated

2025-09-29 10:46
Schedule 3 Projects Register Updated

2025-09-22 12:03
Schedule 3 Projects Register – updated

2025-09-15 11:16
Schedule 3 Projects Register updated

2025-09-08 13:59
Schedule 3 Projects Register uploaded

2025-09-01 10:43
Schedule 3 Projects Register Update

2025-08-26 11:56
Schedule 3 updated

2025-08-18 13:45
Schedule 3 Projects Register updated.

2025-08-11 09:11
Schedule 3 Projects Register Updated

2025-08-04 10:46
Schedule 3 Projects Register updated.

2025-07-28 15:50
Schedule 3 Projects Register – Updated

2025-07-21 12:13
Schedule 3 Projects Register

2025-07-14 11:28
Schedule 3 spreadsheet updated.

2025-07-09 09:53
Schedule 3 Projects register updated.

2025-06-30 14:14
Schedule 3 project register – updated

2025-06-24 11:22
Schedule 3 register updated

2025-06-16 15:44
Schedule 3 Projects Register – Updated

2025-06-09 13:59
Schedule 3 Projects Register updated

2025-06-02 14:38
Updated Schedule 3 Projects Register.

2025-05-26 15:53
Schedule 3 spreadsheet updated.

2025-05-19 13:55
Schedule 3 Projects Register – Uploaded

2025-05-13 10:24
Schedule 3 Projects Register updated

2025-05-06 08:52
Schedule 3 Projects Register updated

2025-04-28 10:16
Schedule 3 Project Register uploaded.

2025-04-22 13:29
Schedule 3 Spreadsheet updated.

2025-04-14 16:13
Schedule 3 Projects Register updated

2025-04-07 15:21
Schedule 3 Projects Register – Uploaded

2025-04-01 07:49
Schedule 3 Projects Register – uploaded

2025-03-24 16:44
Schedule 3 Projects Register updated

2025-03-17 13:03
Schedule 3 Spreadsheet updated.

2025-03-10 12:57
Schedule 3 Projects Register- uploaded

2025-03-03 15:48
2025 Production Screening Directions and 2025 Pipeline Screening Directions added

2025-03-03 14:27
Schedule 3 Projects Register – uploaded

2025-02-24 13:43
Schedule 3 Projects Register updated.

2025-02-17 13:41
Schedule 3 Projects Register updated

2025-02-11 13:58
Schedule 3 register updated

2025-02-03 11:09
Uploaded Schedule 3 Projects Register w.c. 03.02.2025

2025-01-27 15:08
Schedule 3 Register updated.

2025-01-20 15:19
Schedule 3 Projects Register updated

2025-01-13 13:57
Deep Drilling Screening Directions 2025Environmental Impact Assessments (EIA) 2025

2025-01-13 13:37
Schedule 3 Projects Register – updated

2025-01-06 09:25
Schedule 3 Projects Register updated

2024-12-16 10:52
Updated SNS Activity Tracker W/C 16/12/2024.

2024-12-09 14:01
Schedule 3 Projects Register – uploaded

2024-12-03 12:47
Schedule 3 Projects Register updated.

2024-11-25 14:10
Schedule 3 Projects Register – Uploaded

2024-11-18 14:27
Schedule 3 Projects Register- Uploaded

2024-11-11 12:09
Schedule 3 Projects Register- uploaded

2024-11-05 10:54
Schedule 3 Projects Register – file attachment updated

2024-10-29 09:33
Schedule 3 Projects Register updated

2024-10-23 10:50
Update Schedule 3

2024-10-18 12:54
Schedule 3 Spreadsheet updated.

2024-10-07 11:51
Schedule 3 Projects Register updated.

2024-09-30 15:08
Schedule 3 Projects Register updated

2024-09-23 09:54
Schedule 3 Projects Register updated

2024-09-17 10:29
Schedule 3 Projects Register updated

2024-09-10 13:31
Schedule 3 Projects register updated.

2024-09-02 13:25
Schedule 3 Projects Register updated

2024-08-28 10:15
Schedule 3 Projects Register updated

2024-08-19 14:54
Schedule 3 Tracker Update

2024-08-12 15:10
Schedule 3 Projects Register updated

2024-07-29 10:05
Schedule 3 Projects Register updated

2024-07-23 08:56
Schedule 3 Projects Register updated to most recent version

2024-07-15 11:12
Schedule 3 Projects Register updated

2024-07-08 11:27
Schedule 3 Projects Register updated

2024-07-01 10:41
Schedule 3 Projects Register updated

2024-06-24 10:50
Update Schedule 3 – 24.06.24

2024-06-20 10:19
Schedule 3 project register updated.

2024-06-10 16:17
Schedule 3 Projects Register Updated to most recent version

2024-06-03 09:35
Schedule 3 Projects Register updated

2024-05-27 11:27
Schedule 3 register updated

2024-05-20 11:52
Schedule 3 Projects Register updated

2024-05-14 13:21
Schedule 3 Projects Register updated

2024-04-30 14:22
Schedule 3 Projects Register updated to most recent version

2024-04-22 16:04
schedule 3 spreadsheet updated

2024-04-18 14:37
New link to 2024 Production Screening Directions added

2024-04-16 13:29
Schedule 3 update

2024-04-09 15:22
Schedule 3 Projects Register updated to most recent version

2024-04-02 13:33
Schedule 3 projects register updated.

2024-03-26 14:16
Update of Schedule 3 document

2024-03-21 10:11
schedule 3 project register updated to most recent version

2024-03-12 15:18
Schedule 3 Projects Register updated

2024-03-04 15:39
Schedule 3 Projects Register updated

2024-02-27 08:21
Schedule 3 Projects Register updated

2024-02-20 11:21
Schedule 3 Project Register updated

2024-02-14 15:35
Addition of link to 2024 PL screening directions

2024-02-12 15:50
Schedule 3 Projects Register updated

2024-02-07 09:20
Schedule 3 Projects Register updated to most recent version

2024-01-30 08:41
Schedule 3 – 29/01/2024

2024-01-22 13:54
2024 page added

2024-01-22 11:00
Schedule 3 register updated

2024-01-15 14:08
Schedule 3 updated

2024-01-12 13:35
Link to Deep Drilling Screening Directions – 2024 added

2024-01-09 09:37
Schedule 3 spreadsheet updated

2024-01-03 14:17
Schedule 3 register updated

2023-12-18 11:47
Schedule 3 Projects register updated to most recent version

2023-12-11 16:19
Schedule 3 – Updated

2023-12-04 14:17
Schedule 3 updated

2023-11-27 14:49
Schedule 3 Projects Register updated

2023-11-23 16:14
Updated Schedule 3 Projects Register Spreadsheet

2023-11-13 13:37
Schedule 3 Projects Register updated to most recent version

2023-11-06 14:49
Schedule 3 projects register updated

2023-10-30 16:35
Update Schedule 3

2023-10-24 15:38
Schedule 3 Projects Register updated

2023-10-17 11:37
Schedule 3 Spreadsheet updated

2023-10-13 10:59
Schedule 3 Projects Register updated to most recent version

2023-10-05 15:06
Link added to EIA Submissions and Decisions – 2023 webpage

2023-10-03 15:16
Schedule 3 Projects Register updated to most recent version

2023-09-05 13:18
Schedule 3 Projects Register – file attachment UPDATED

2023-08-29 16:55
Schedule 3 Projects Register weekly update

2023-08-15 16:05
Schedule 3 Projects Register updated to most recent version

2023-08-09 14:59
Schedule 3 Projects register – weekly update

2023-08-02 14:07
Schedule 3 updated

2023-07-17 11:32
Schedule 3 spreadsheet updated

2023-07-10 16:21
Schedule 3 Projects register updated to most recent version

2023-07-06 13:13
Updated Schedule 3 Projects Register – 03/07/2023

2023-06-28 10:36
Schedule 3 Projects Register w.c. 26.06.2023 – updated

2023-06-20 09:01
Schedule 3 spreadsheet updated

2023-06-14 09:43
Schedule 3 Projects Register updated to most recent version

2023-06-05 14:53
Schedule 3 Project Register updated to most recent version

2023-05-30 10:05
Schedule 3 Projects Register – 29.05.2023 – UPDATE

2023-05-16 10:12
Current Schedule 3 Spreadsheet

2023-04-24 13:57
Schedule 3 Projects Register updated to most recent version

2023-04-05 16:06
Updated Schedule 3

2023-02-21 16:45
Schedule 3 Project Register updated to latest version

2023-02-10 15:34
add 2023 Pipeline Screening Directions link

2023-02-08 14:28
Schedule 3 projects register update

2023-01-25 14:38
Schedule 3 Projects Register updated

2023-01-05 15:36
Link added to Deep Drilling Screening Directions – 2023

2022-12-20 10:26
Schedule 3 Projects Register updated to most recent version

2022-12-13 11:57
Schedule 3 spreadsheet updated

2022-11-28 10:44
Schedule 3 Project Register updated.

2022-11-15 13:39
Most recent Schedule 3 projects register uploaded

2022-10-12 08:45
Schedule 3 register updated

2022-10-04 12:14
Updated Schedule 3 Projects Register added

2022-09-27 10:20
Updated Schedule 3 spreadsheet

2022-09-20 13:43
Schedule 3 Projects Register Updated

2022-08-30 11:21
Update to schedule 3 projects register

2022-08-23 14:01
Updated Schedule 3 Projects Register as at 22.08.2022

2022-08-15 14:00
Schedule 3 uploaded

2022-08-09 09:37
Schedule 3 Projects Register updated

2022-07-27 09:27
Schedule 3 register updated

2022-07-20 12:46
Schedule 3 Projects Register w.c. 18.07.2022 – Update

2022-07-11 13:08
Schedule 3 projects register updated

2022-06-28 09:30
Schedule 3 updated

2022-06-23 13:14
Schedule 3 updated

2022-06-14 15:30
Schedule 3 spreadsheet updated

2022-05-23 13:26
Schedule 3 register updated

2022-05-17 14:51
Schedule 3 updated

2022-05-03 14:08
Schedule 3 Projects Register updated to most recent version

2022-04-28 16:34
A link to 2022 Environmental Statements added.

2022-04-26 15:50
Schedule 3 updated

2022-04-19 12:43
Schedule 3 updated

2022-04-05 12:38
Schedule 3 register updated

2022-03-29 15:16
Schedule 3 replaced with the newest version

2022-03-21 14:44
Schedule 3 Register updated

2022-03-14 15:44
Schedule 3 Register updated

2022-03-08 15:29
Schedule 3 project register updated

2022-02-28 15:07
Update to Schedule 3 Projects Register

2022-02-23 14:32
Updated schedule 3 spreadsheet