Guidance

The 2020 EIA Regulations

The 2020 EIA Regulations

From 1st January 2021

Environmental Impact Assessments (EIA)

Projects listed in Schedule 1 of the 2020 EIA Regulations are subject to an EIA process as required by regulation 5(1). Projects listed in Schedule 2 are subject to a screening process to determine if an EIA is necessary, but the developer may wish to undertake an EIA as set out in regulation 5(2)(b), if they choose. To access further information on projects which are subject to the EIA process, please use the relevant link below.

Environmental Impact Assessments (EIA) - Transitional Cases

For projects where the Oil and Gas Authority decision on whether to grant consent is pending at the time when the 2020 EIA Regulations came into force, EIA’s are subject to the provisions of regulation 29 (Transitional and Saving Provisions relating to the 1999 Regulations). To access further information on EIA projects which are subject to the provisions of regulation 29, please use the relevant link below.

Screening Directions

Projects listed in Schedule 2 of the 2020 EIA Regulations require a screening direction in accordance with regulation 5(2)(a) to determine if an EIA is necessary. Screening directions for projects which have been through the screening process since 1st January 2021 can be accessed using the link below.

Deep Drilling Screening Directions

Pipeline Screening Directions

Production Screening Directions

Regulation 5(3) Decisions that No environmental impact assessment is needed without a screening direction

Schedule 3 Projects

The 2020 EIA Regulations provide that projects that fall under Schedule 3 do not require an EIA where the Secretary of State considers that the project is not likely to have a significant effect on the environment pursuant to regulation 7. Those projects are:

  • The construction of a pipeline for the transport of oil, combustible gas, or chemicals, or for the transport of carbon dioxide streams for the purposes of geological storage of carbon dioxide, or the maintenance, repair, replacement, protection or extension of an existing pipeline constructed for those purposes where no part of the pipeline or related works would extend more than 500 metres from a well or any part of an installation to which that pipeline would be directly or indirectly attached.

A list of Schedule 3 project decisions made since 1st January 2021 can be accessed at the following link:

Updates to this page

Published 5 January 2021
Last updated 1825 May 2026 + show all updates
  1. Schedule 3 Projects Register updated

  2. Schedule 3 Projects Register updated

  3. Schedule 3 Projects Register Updated

  4. Schedule 3 - uploaded

  5. Schedule 3 document updated

  6. Schedule 3 Projects - updated

  7. Schedule 3 Projects Register updated

  8. Schedule 3 Projects Register Updated

  9. Schedule 3 Projects Register updated

  10. Schedule 3 Project Register Updated

  11. Schedule 3 Projects Register updated

  12. Schedule 3 Projects Register - updated

  13. Production Screening Directions – 2026

  14. Schedule 3 Projects Register updated.

  15. Updated Schedule 3 Project Register

  16. Schedule 3 Projects Register updated

  17. Schedule 3 Projects Register - updated

  18. Schedule 3 Projects Register updated.

  19. Addition of 2026 page to Pipeline Screening Directions

  20. Schedule 3 Projects Register updated

  21. Schedule 3 Projects Register updated

  22. Schedule 3 Projects Register Updated

  23. Addition of 2026

  24. Schedule 3 Projects Register updated

  25. Schedule 3 Projects Register updated

  26. Schedule 3 Projects Register - updated

  27. Schedule 3 Projects Register updated.

  28. Schedule 3 Projects Register updated.

  29. Schedule 3 updated.

  30. Schedule 3 Projects Register - Updated

  31. Schedule 3 updated.

  32. Schedule 3 Projects Register - file attachment updated

  33. Schedule 3 Projects Register updated.

  34. Schedule 3 Projects Register - Updated

  35. Schedule 3 Projects Register updated

  36. Schedule 3 Projects Register Updated

  37. Schedule 3 Projects Register - updated

  38. Schedule 3 Projects Register updated

  39. Schedule 3 Projects Register uploaded

  40. Schedule 3 Projects Register Update

  41. Schedule 3 updated

  42. Schedule 3 Projects Register updated.

  43. Schedule 3 Projects Register Updated

  44. Schedule 3 Projects Register updated.

  45. Schedule 3 Projects Register - Updated

  46. Schedule 3 Projects Register

  47. Schedule 3 spreadsheet updated.

  48. Schedule 3 Projects register updated.

  49. Schedule 3 project register - updated

  50. Schedule 3 register updated

  51. Schedule 3 Projects Register - Updated

  52. Schedule 3 Projects Register updated

  53. Updated Schedule 3 Projects Register.

  54. Schedule 3 spreadsheet updated.

  55. Schedule 3 Projects Register - Uploaded

  56. Schedule 3 Projects Register updated

  57. Schedule 3 Projects Register updated

  58. Schedule 3 Project Register uploaded.

  59. Schedule 3 Spreadsheet updated.

  60. Schedule 3 Projects Register updated

  61. Schedule 3 Projects Register - Uploaded

  62. Schedule 3 Projects Register - uploaded

  63. Schedule 3 Projects Register updated

  64. Schedule 3 Spreadsheet updated.

  65. Schedule 3 Projects Register- uploaded

  66. 2025 Production Screening Directions and 2025 Pipeline Screening Directions added

  67. Schedule 3 Projects Register - uploaded

  68. Schedule 3 Projects Register updated.

  69. Schedule 3 Projects Register updated

  70. Schedule 3 register updated

  71. Uploaded Schedule 3 Projects Register w.c. 03.02.2025

  72. Schedule 3 Register updated.

  73. Schedule 3 Projects Register updated

  74. Deep Drilling Screening Directions 2025 Environmental Impact Assessments (EIA) 2025

  75. Schedule 3 Projects Register - updated

  76. Schedule 3 Projects Register updated

  77. Updated SNS Activity Tracker W/C 16/12/2024.

  78. Schedule 3 Projects Register - uploaded

  79. Schedule 3 Projects Register updated.

  80. Schedule 3 Projects Register - Uploaded

  81. Schedule 3 Projects Register- Uploaded

  82. Schedule 3 Projects Register- uploaded

  83. Schedule 3 Projects Register - file attachment updated

  84. Schedule 3 Projects Register updated

  85. Update Schedule 3

  86. Schedule 3 Spreadsheet updated.

  87. Schedule 3 Projects Register updated.

  88. Schedule 3 Projects Register updated

  89. Schedule 3 Projects Register updated

  90. Schedule 3 Projects Register updated

  91. Schedule 3 Projects register updated.

  92. Schedule 3 Projects Register updated

  93. Schedule 3 Projects Register updated

  94. Schedule 3 Tracker Update

  95. Schedule 3 Projects Register updated

  96. Schedule 3 Projects Register updated

  97. Schedule 3 Projects Register updated to most recent version

  98. Schedule 3 Projects Register updated

  99. Schedule 3 Projects Register updated

  100. Schedule 3 Projects Register updated

  101. Update Schedule 3 - 24.06.24

  102. Schedule 3 project register updated.

  103. Schedule 3 Projects Register Updated to most recent version

  104. Schedule 3 Projects Register updated

  105. Schedule 3 register updated

  106. Schedule 3 Projects Register updated

  107. Schedule 3 Projects Register updated

  108. Schedule 3 Projects Register updated to most recent version

  109. schedule 3 spreadsheet updated

  110. New link to 2024 Production Screening Directions added

  111. Schedule 3 update

  112. Schedule 3 Projects Register updated to most recent version

  113. Schedule 3 projects register updated.

  114. Update of Schedule 3 document

  115. schedule 3 project register updated to most recent version

  116. Schedule 3 Projects Register updated

  117. Schedule 3 Projects Register updated

  118. Schedule 3 Projects Register updated

  119. Schedule 3 Project Register updated

  120. Addition of link to 2024 PL screening directions

  121. Schedule 3 Projects Register updated

  122. Schedule 3 Projects Register updated to most recent version

  123. Schedule 3 - 29/01/2024

  124. 2024 page added

  125. Schedule 3 register updated

  126. Schedule 3 updated

  127. Link to Deep Drilling Screening Directions - 2024 added

  128. Schedule 3 spreadsheet updated

  129. Schedule 3 register updated

  130. Schedule 3 Projects register updated to most recent version

  131. Schedule 3 - Updated

  132. Schedule 3 updated

  133. Schedule 3 Projects Register updated

  134. Updated Schedule 3 Projects Register Spreadsheet

  135. Schedule 3 Projects Register updated to most recent version

  136. Schedule 3 projects register updated

  137. Update Schedule 3

  138. Schedule 3 Projects Register updated

  139. Schedule 3 Spreadsheet updated

  140. Schedule 3 Projects Register updated to most recent version

  141. Link added to EIA Submissions and Decisions - 2023 webpage

  142. Schedule 3 Projects Register updated to most recent version

  143. Schedule 3 Projects Register updated to most recent version

  144. Schedule 3 project register - updated

  145. Schedule 3 Projects register updated

  146. Schedule 3 Projects Register - file attachment UPDATED

  147. Schedule 3 Projects Register weekly update

  148. Schedule 3 Projects Register updated to most recent version

  149. Schedule 3 Projects register - weekly update

  150. Schedule 3 updated

  151. Schedule 3 spreadsheet updated

  152. Schedule 3 Projects register updated to most recent version

  153. Updated Schedule 3 Projects Register - 03/07/2023

  154. Schedule 3 Projects Register w.c. 26.06.2023 - updated

  155. Schedule 3 spreadsheet updated

  156. Schedule 3 Projects Register updated to most recent version

  157. Schedule 3 Project Register updated to most recent version

  158. Schedule 3 Projects Register - 29.05.2023 - UPDATE

  159. Current Schedule 3 Spreadsheet

  160. Schedule 3 Projects Register updated to most recent version

  161. Updated Schedule 3

  162. Schedule 3 Project Register updated to latest version

  163. add 2023 Pipeline Screening Directions link

  164. Schedule 3 projects register update

  165. Schedule 3 Projects Register updated

  166. Link added to Deep Drilling Screening Directions - 2023

  167. Schedule 3 Projects Register updated to most recent version

  168. Schedule 3 spreadsheet updated

  169. Schedule 3 Project Register updated.

  170. Most recent Schedule 3 projects register uploaded

  171. Schedule 3 register updated

  172. Updated Schedule 3 Projects Register added

  173. Updated Schedule 3 spreadsheet

  174. Schedule 3 Projects Register Updated

  175. Update to schedule 3 projects register

  176. Updated Schedule 3 Projects Register as at 22.08.2022

  177. Schedule 3 uploaded

  178. Schedule 3 Projects Register updated

  179. Schedule 3 register updated

  180. Schedule 3 Projects Register w.c. 18.07.2022 - Update

  181. Schedule 3 projects register updated

  182. Schedule 3 updated

  183. Schedule 3 updated

  184. Schedule 3 spreadsheet updated

  185. Schedule 3 register updated

  186. Schedule 3 updated

  187. Schedule 3 Projects Register updated to most recent version

  188. A link to 2022 Environmental Statements added.

  189. Schedule 3 updated

  190. Schedule 3 updated

  191. Schedule 3 register updated

  192. Schedule 3 replaced with the newest version

  193. Schedule 3 Register updated

  194. Schedule 3 Register updated

  195. Schedule 3 project register updated

  196. Update to Schedule 3 Projects Register

  197. Updated schedule 3 spreadsheet

  198. Addition of Pipeline Screening Directions - 2022

  199. Schedule 3 register updated

  200. Addition of link to Production Screening Direction 2022 page

  201. Weekly Schedule 3 Projects Register update

  202. Weekly Schedule 3 Projects Register Spreadsheet Update

  203. Weekly Update to Schedule 3 Projects Register

  204. Addition of Deep Drilling Screening Directions page for 2022

  205. Schedule 3 Project Tracker updated

  206. Schedule 3 tracking sheet updated.

  207. Schedule 3 tracking spreadsheet updated

  208. Schedule 3 register updated

  209. Schedule 3 tracker updated.

  210. Schedule 3 Projects Register updated.

  211. Weekly Schedule 3 Projects Register Spreadsheet

  212. Updated Schedule 3 register

  213. Schedule 3 tracking register updated.

  214. New schedule 3 register uploaded

  215. Schedule 3 Projects Register updated.

  216. Updated Schedule 3 register

  217. Updated Schedule 3 Projects Register,

  218. Schedule 3 Register updated

  219. updated schedule 3 register

  220. Weekly Schedule 3 Projects Register udpate

  221. Updated schedule 3 register

  222. Updated Schedule 3 Register

  223. Schedule 3 Projects Register weekly update

  224. Weekly Schedule 3 Projects Register update

  225. Schedule 3 projects register updated.

  226. Schedule 3 register updated

  227. Updated Schedule 3 Register

  228. Schedule 3 tracking spreadsheet updated.

  229. Updated Schedule 3 Register

  230. Schedule 3 tracker updated.

  231. Schedule 3 tracker updated.

  232. Schedule 3 register updated.

  233. Weekly 'Schedule 3 Projects Register' update

  234. Schedule 3 Register updated

  235. Schedule 3 tracking sheet updated.

  236. Schedule 3 Projects Register updated.

  237. Weekly Update to Schedule 3 Projects Register Spreadsheet

  238. Schedule 3 tracking updated.

  239. Schedule 3 tracking spreadsheet updated.

  240. Schedule 3 tracking spreadsheet updated.

  241. Update to Schedule 3 Projects Register

  242. Schedule 3 Projects Register updated.

  243. Addition of section for 'Environmental Impact Asssements (EIA) - Transitional Cases' within the 'Environmental Impact Assesssments (EIA)' section

  244. Weekly update to the Schedule 3 Projects spreadsheet

  245. Update of - Sched 3 spreadsheets - 25/01/2021

  246. 'Schedule 3 Projects Register' spreadsheet weekly update

  247. First published.

Sign up for emails or print this page

Update history

2026-05-25 16:06
Schedule 3 Projects Register updated

2026-05-18 15:44
Schedule 3 Projects Register updated

2026-05-11 16:09
Schedule 3 Projects Register Updated

2026-05-05 14:52
Schedule 3 – uploaded

2026-04-28 10:47
Schedule 3 document updated

2026-04-21 13:15
Schedule 3 Projects – updated

2026-04-13 14:33
Schedule 3 Projects Register updated

2026-04-07 10:06
Schedule 3 Projects Register Updated

2026-03-30 13:29
Schedule 3 Projects Register updated

2026-03-23 10:01
Schedule 3 Project Register Updated

2026-03-17 11:07
Schedule 3 Projects Register updated

2026-03-09 15:11
Schedule 3 Projects Register – updated

2026-03-04 11:53
Production Screening Directions – 2026

2026-03-02 11:24
Schedule 3 Projects Register updated.

2026-02-23 14:46
Updated Schedule 3 Project Register

2026-02-16 10:16
Schedule 3 Projects Register updated

2026-02-09 14:38
Schedule 3 Projects Register – updated

2026-02-02 12:19
Schedule 3 Projects Register updated.

2026-01-30 08:17
Addition of 2026 page to Pipeline Screening Directions

2026-01-19 11:54
Schedule 3 Projects Register updated

2026-01-12 10:50
Schedule 3 Projects Register updated

2026-01-05 14:28
Schedule 3 Projects Register Updated

2025-12-30 15:29
Addition of 2026

2025-12-29 11:11
Schedule 3 Projects Register updated

2025-12-15 08:57
Schedule 3 Projects Register updated

2025-12-08 16:14
Schedule 3 Projects Register – updated

2025-12-01 15:06
Schedule 3 Projects Register updated.

2025-11-24 15:58
Schedule 3 Projects Register updated.

2025-11-18 09:53
Schedule 3 updated.

2025-11-10 15:21
Schedule 3 Projects Register – Updated

2025-11-03 13:49
Schedule 3 updated.

2025-10-27 12:47
Schedule 3 Projects Register – file attachment updated

2025-10-20 11:47
Schedule 3 Projects Register updated.

2025-10-13 15:22
Schedule 3 Projects Register – Updated

2025-10-07 15:51
Schedule 3 Projects Register updated

2025-09-29 10:46
Schedule 3 Projects Register Updated

2025-09-22 12:03
Schedule 3 Projects Register – updated

2025-09-15 11:16
Schedule 3 Projects Register updated

2025-09-08 13:59
Schedule 3 Projects Register uploaded

2025-09-01 10:43
Schedule 3 Projects Register Update

2025-08-26 11:56
Schedule 3 updated

2025-08-18 13:45
Schedule 3 Projects Register updated.

2025-08-11 09:11
Schedule 3 Projects Register Updated

2025-08-04 10:46
Schedule 3 Projects Register updated.

2025-07-28 15:50
Schedule 3 Projects Register – Updated

2025-07-21 12:13
Schedule 3 Projects Register

2025-07-14 11:28
Schedule 3 spreadsheet updated.

2025-07-09 09:53
Schedule 3 Projects register updated.

2025-06-30 14:14
Schedule 3 project register – updated

2025-06-24 11:22
Schedule 3 register updated

2025-06-16 15:44
Schedule 3 Projects Register – Updated

2025-06-09 13:59
Schedule 3 Projects Register updated

2025-06-02 14:38
Updated Schedule 3 Projects Register.

2025-05-26 15:53
Schedule 3 spreadsheet updated.

2025-05-19 13:55
Schedule 3 Projects Register – Uploaded

2025-05-13 10:24
Schedule 3 Projects Register updated

2025-05-06 08:52
Schedule 3 Projects Register updated

2025-04-28 10:16
Schedule 3 Project Register uploaded.

2025-04-22 13:29
Schedule 3 Spreadsheet updated.

2025-04-14 16:13
Schedule 3 Projects Register updated

2025-04-07 15:21
Schedule 3 Projects Register – Uploaded

2025-04-01 07:49
Schedule 3 Projects Register – uploaded

2025-03-24 16:44
Schedule 3 Projects Register updated

2025-03-17 13:03
Schedule 3 Spreadsheet updated.

2025-03-10 12:57
Schedule 3 Projects Register- uploaded

2025-03-03 15:48
2025 Production Screening Directions and 2025 Pipeline Screening Directions added

2025-03-03 14:27
Schedule 3 Projects Register – uploaded

2025-02-24 13:43
Schedule 3 Projects Register updated.

2025-02-17 13:41
Schedule 3 Projects Register updated

2025-02-11 13:58
Schedule 3 register updated

2025-02-03 11:09
Uploaded Schedule 3 Projects Register w.c. 03.02.2025

2025-01-27 15:08
Schedule 3 Register updated.

2025-01-20 15:19
Schedule 3 Projects Register updated

2025-01-13 13:57
Deep Drilling Screening Directions 2025Environmental Impact Assessments (EIA) 2025

2025-01-13 13:37
Schedule 3 Projects Register – updated

2025-01-06 09:25
Schedule 3 Projects Register updated

2024-12-16 10:52
Updated SNS Activity Tracker W/C 16/12/2024.

2024-12-09 14:01
Schedule 3 Projects Register – uploaded

2024-12-03 12:47
Schedule 3 Projects Register updated.

2024-11-25 14:10
Schedule 3 Projects Register – Uploaded

2024-11-18 14:27
Schedule 3 Projects Register- Uploaded

2024-11-11 12:09
Schedule 3 Projects Register- uploaded

2024-11-05 10:54
Schedule 3 Projects Register – file attachment updated

2024-10-29 09:33
Schedule 3 Projects Register updated

2024-10-23 10:50
Update Schedule 3

2024-10-18 12:54
Schedule 3 Spreadsheet updated.

2024-10-07 11:51
Schedule 3 Projects Register updated.

2024-09-30 15:08
Schedule 3 Projects Register updated

2024-09-23 09:54
Schedule 3 Projects Register updated

2024-09-17 10:29
Schedule 3 Projects Register updated

2024-09-10 13:31
Schedule 3 Projects register updated.

2024-09-02 13:25
Schedule 3 Projects Register updated

2024-08-28 10:15
Schedule 3 Projects Register updated

2024-08-19 14:54
Schedule 3 Tracker Update

2024-08-12 15:10
Schedule 3 Projects Register updated

2024-07-29 10:05
Schedule 3 Projects Register updated

2024-07-23 08:56
Schedule 3 Projects Register updated to most recent version

2024-07-15 11:12
Schedule 3 Projects Register updated

2024-07-08 11:27
Schedule 3 Projects Register updated

2024-07-01 10:41
Schedule 3 Projects Register updated

2024-06-24 10:50
Update Schedule 3 – 24.06.24

2024-06-20 10:19
Schedule 3 project register updated.

2024-06-10 16:17
Schedule 3 Projects Register Updated to most recent version

2024-06-03 09:35
Schedule 3 Projects Register updated

2024-05-27 11:27
Schedule 3 register updated

2024-05-20 11:52
Schedule 3 Projects Register updated

2024-05-14 13:21
Schedule 3 Projects Register updated

2024-04-30 14:22
Schedule 3 Projects Register updated to most recent version

2024-04-22 16:04
schedule 3 spreadsheet updated

2024-04-18 14:37
New link to 2024 Production Screening Directions added

2024-04-16 13:29
Schedule 3 update

2024-04-09 15:22
Schedule 3 Projects Register updated to most recent version

2024-04-02 13:33
Schedule 3 projects register updated.

2024-03-26 14:16
Update of Schedule 3 document

2024-03-21 10:11
schedule 3 project register updated to most recent version

2024-03-12 15:18
Schedule 3 Projects Register updated

2024-03-04 15:39
Schedule 3 Projects Register updated

2024-02-27 08:21
Schedule 3 Projects Register updated

2024-02-20 11:21
Schedule 3 Project Register updated

2024-02-14 15:35
Addition of link to 2024 PL screening directions

2024-02-12 15:50
Schedule 3 Projects Register updated

2024-02-07 09:20
Schedule 3 Projects Register updated to most recent version

2024-01-30 08:41
Schedule 3 – 29/01/2024

2024-01-22 13:54
2024 page added

2024-01-22 11:00
Schedule 3 register updated

2024-01-15 14:08
Schedule 3 updated

2024-01-12 13:35
Link to Deep Drilling Screening Directions – 2024 added

2024-01-09 09:37
Schedule 3 spreadsheet updated

2024-01-03 14:17
Schedule 3 register updated

2023-12-18 11:47
Schedule 3 Projects register updated to most recent version

2023-12-11 16:19
Schedule 3 – Updated

2023-12-04 14:17
Schedule 3 updated

2023-11-27 14:49
Schedule 3 Projects Register updated

2023-11-23 16:14
Updated Schedule 3 Projects Register Spreadsheet

2023-11-13 13:37
Schedule 3 Projects Register updated to most recent version

2023-11-06 14:49
Schedule 3 projects register updated

2023-10-30 16:35
Update Schedule 3

2023-10-24 15:38
Schedule 3 Projects Register updated

2023-10-17 11:37
Schedule 3 Spreadsheet updated

2023-10-13 10:59
Schedule 3 Projects Register updated to most recent version

2023-10-05 15:06
Link added to EIA Submissions and Decisions – 2023 webpage

2023-10-03 15:16
Schedule 3 Projects Register updated to most recent version

2023-09-05 13:18
Schedule 3 Projects Register – file attachment UPDATED

2023-08-29 16:55
Schedule 3 Projects Register weekly update

2023-08-15 16:05
Schedule 3 Projects Register updated to most recent version

2023-08-09 14:59
Schedule 3 Projects register – weekly update

2023-08-02 14:07
Schedule 3 updated

2023-07-17 11:32
Schedule 3 spreadsheet updated

2023-07-10 16:21
Schedule 3 Projects register updated to most recent version

2023-07-06 13:13
Updated Schedule 3 Projects Register – 03/07/2023

2023-06-28 10:36
Schedule 3 Projects Register w.c. 26.06.2023 – updated

2023-06-20 09:01
Schedule 3 spreadsheet updated

2023-06-14 09:43
Schedule 3 Projects Register updated to most recent version

2023-06-05 14:53
Schedule 3 Project Register updated to most recent version

2023-05-30 10:05
Schedule 3 Projects Register – 29.05.2023 – UPDATE

2023-05-16 10:12
Current Schedule 3 Spreadsheet

2023-04-24 13:57
Schedule 3 Projects Register updated to most recent version

2023-04-05 16:06
Updated Schedule 3

2023-02-21 16:45
Schedule 3 Project Register updated to latest version

2023-02-10 15:34
add 2023 Pipeline Screening Directions link

2023-02-08 14:28
Schedule 3 projects register update

2023-01-25 14:38
Schedule 3 Projects Register updated

2023-01-05 15:36
Link added to Deep Drilling Screening Directions – 2023

2022-12-20 10:26
Schedule 3 Projects Register updated to most recent version

2022-12-13 11:57
Schedule 3 spreadsheet updated

2022-11-28 10:44
Schedule 3 Project Register updated.

2022-11-15 13:39
Most recent Schedule 3 projects register uploaded

2022-10-12 08:45
Schedule 3 register updated

2022-10-04 12:14
Updated Schedule 3 Projects Register added

2022-09-27 10:20
Updated Schedule 3 spreadsheet

2022-09-20 13:43
Schedule 3 Projects Register Updated

2022-08-30 11:21
Update to schedule 3 projects register

2022-08-23 14:01
Updated Schedule 3 Projects Register as at 22.08.2022

2022-08-15 14:00
Schedule 3 uploaded

2022-08-09 09:37
Schedule 3 Projects Register updated

2022-07-27 09:27
Schedule 3 register updated

2022-07-20 12:46
Schedule 3 Projects Register w.c. 18.07.2022 – Update

2022-07-11 13:08
Schedule 3 projects register updated

2022-06-28 09:30
Schedule 3 updated

2022-06-23 13:14
Schedule 3 updated

2022-06-14 15:30
Schedule 3 spreadsheet updated

2022-05-23 13:26
Schedule 3 register updated

2022-05-17 14:51
Schedule 3 updated

2022-05-03 14:08
Schedule 3 Projects Register updated to most recent version

2022-04-28 16:34
A link to 2022 Environmental Statements added.

2022-04-26 15:50
Schedule 3 updated

2022-04-19 12:43
Schedule 3 updated

2022-04-05 12:38
Schedule 3 register updated

2022-03-29 15:16
Schedule 3 replaced with the newest version

2022-03-21 14:44
Schedule 3 Register updated

2022-03-14 15:44
Schedule 3 Register updated

2022-03-08 15:29
Schedule 3 project register updated

2022-02-28 15:07
Update to Schedule 3 Projects Register

2022-02-23 14:32
Updated schedule 3 spreadsheet