The 2020 EIA Regulations
From 1st January 2021
Projects listed in Schedule 1 of the 2020 EIA Regulations are subject to an EIA process as required by regulation 5(1). Projects listed in Schedule 2 are subject to a screening process to determine if an EIA is necessary, but the developer may wish to undertake an EIA as set out in regulation 5(2)(b), if they choose. To access further information on projects which are subject to the EIA process, please use the relevant link below.
For projects where the Oil and Gas Authority decision on whether to grant consent is pending at the time when the 2020 EIA Regulations came into force, EIA’s are subject to the provisions of regulation 29 (Transitional and Saving Provisions relating to the 1999 Regulations). To access further information on EIA projects which are subject to the provisions of regulation 29, please use the relevant link below.
Projects listed in Schedule 2 of the 2020 EIA Regulations require a screening direction in accordance with regulation 5(2)(a) to determine if an EIA is necessary. Screening directions for projects which have been through the screening process since 1st January 2021 can be accessed using the link below.
The 2020 EIA Regulations provide that projects that fall under Schedule 3 do not require an EIA where the Secretary of State considers that the project is not likely to have a significant effect on the environment pursuant to regulation 7. Those projects are:
A list of Schedule 3 project decisions made since 1st January 2021 can be accessed at the following link:
Schedule 3 Projects Register updated
Schedule 3 Projects Register Updated
Schedule 3 Projects Register - updated
Schedule 3 Projects Register updated
Schedule 3 Projects Register uploaded
Schedule 3 Projects Register Update
Schedule 3 updated
Schedule 3 Projects Register updated.
Schedule 3 Projects Register Updated
Schedule 3 Projects Register updated.
Schedule 3 Projects Register - Updated
Schedule 3 Projects Register
Schedule 3 spreadsheet updated.
Schedule 3 Projects register updated.
Schedule 3 project register - updated
Schedule 3 register updated
Schedule 3 Projects Register - Updated
Schedule 3 Projects Register updated
Updated Schedule 3 Projects Register.
Schedule 3 spreadsheet updated.
Schedule 3 Projects Register - Uploaded
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Project Register uploaded.
Schedule 3 Spreadsheet updated.
Schedule 3 Projects Register updated
Schedule 3 Projects Register - Uploaded
Schedule 3 Projects Register - uploaded
Schedule 3 Projects Register updated
Schedule 3 Spreadsheet updated.
Schedule 3 Projects Register- uploaded
2025 Production Screening Directions and 2025 Pipeline Screening Directions added
Schedule 3 Projects Register - uploaded
Schedule 3 Projects Register updated.
Schedule 3 Projects Register updated
Schedule 3 register updated
Uploaded Schedule 3 Projects Register w.c. 03.02.2025
Schedule 3 Register updated.
Schedule 3 Projects Register updated
Deep Drilling Screening Directions 2025 Environmental Impact Assessments (EIA) 2025
Schedule 3 Projects Register - updated
Schedule 3 Projects Register updated
Updated SNS Activity Tracker W/C 16/12/2024.
Schedule 3 Projects Register - uploaded
Schedule 3 Projects Register updated.
Schedule 3 Projects Register - Uploaded
Schedule 3 Projects Register- Uploaded
Schedule 3 Projects Register- uploaded
Schedule 3 Projects Register - file attachment updated
Schedule 3 Projects Register updated
Update Schedule 3
Schedule 3 Spreadsheet updated.
Schedule 3 Projects Register updated.
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Projects register updated.
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Tracker Update
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated to most recent version
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Update Schedule 3 - 24.06.24
Schedule 3 project register updated.
Schedule 3 Projects Register Updated to most recent version
Schedule 3 Projects Register updated
Schedule 3 register updated
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated to most recent version
schedule 3 spreadsheet updated
New link to 2024 Production Screening Directions added
Schedule 3 update
Schedule 3 Projects Register updated to most recent version
Schedule 3 projects register updated.
Update of Schedule 3 document
schedule 3 project register updated to most recent version
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated
Schedule 3 Project Register updated
Addition of link to 2024 PL screening directions
Schedule 3 Projects Register updated
Schedule 3 Projects Register updated to most recent version
Schedule 3 - 29/01/2024
2024 page added
Schedule 3 register updated
Schedule 3 updated
Link to Deep Drilling Screening Directions - 2024 added
Schedule 3 spreadsheet updated
Schedule 3 register updated
Schedule 3 Projects register updated to most recent version
Schedule 3 - Updated
Schedule 3 updated
Schedule 3 Projects Register updated
Updated Schedule 3 Projects Register Spreadsheet
Schedule 3 Projects Register updated to most recent version
Schedule 3 projects register updated
Update Schedule 3
Schedule 3 Projects Register updated
Schedule 3 Spreadsheet updated
Schedule 3 Projects Register updated to most recent version
Link added to EIA Submissions and Decisions - 2023 webpage
Schedule 3 Projects Register updated to most recent version
Schedule 3 Projects Register updated to most recent version
Schedule 3 project register - updated
Schedule 3 Projects register updated
Schedule 3 Projects Register - file attachment UPDATED
Schedule 3 Projects Register weekly update
Schedule 3 Projects Register updated to most recent version
Schedule 3 Projects register - weekly update
Schedule 3 updated
Schedule 3 spreadsheet updated
Schedule 3 Projects register updated to most recent version
Updated Schedule 3 Projects Register - 03/07/2023
Schedule 3 Projects Register w.c. 26.06.2023 - updated
Schedule 3 spreadsheet updated
Schedule 3 Projects Register updated to most recent version
Schedule 3 Project Register updated to most recent version
Schedule 3 Projects Register - 29.05.2023 - UPDATE
Current Schedule 3 Spreadsheet
Schedule 3 Projects Register updated to most recent version
Updated Schedule 3
Schedule 3 Project Register updated to latest version
add 2023 Pipeline Screening Directions link
Schedule 3 projects register update
Schedule 3 Projects Register updated
Link added to Deep Drilling Screening Directions - 2023
Schedule 3 Projects Register updated to most recent version
Schedule 3 spreadsheet updated
Schedule 3 Project Register updated.
Most recent Schedule 3 projects register uploaded
Schedule 3 register updated
Updated Schedule 3 Projects Register added
Updated Schedule 3 spreadsheet
Schedule 3 Projects Register Updated
Update to schedule 3 projects register
Updated Schedule 3 Projects Register as at 22.08.2022
Schedule 3 uploaded
Schedule 3 Projects Register updated
Schedule 3 register updated
Schedule 3 Projects Register w.c. 18.07.2022 - Update
Schedule 3 projects register updated
Schedule 3 updated
Schedule 3 updated
Schedule 3 spreadsheet updated
Schedule 3 register updated
Schedule 3 updated
Schedule 3 Projects Register updated to most recent version
A link to 2022 Environmental Statements added.
Schedule 3 updated
Schedule 3 updated
Schedule 3 register updated
Schedule 3 replaced with the newest version
Schedule 3 Register updated
Schedule 3 Register updated
Schedule 3 project register updated
Update to Schedule 3 Projects Register
Updated schedule 3 spreadsheet
Addition of Pipeline Screening Directions - 2022
Schedule 3 register updated
Addition of link to Production Screening Direction 2022 page
Weekly Schedule 3 Projects Register update
Weekly Schedule 3 Projects Register Spreadsheet Update
Weekly Update to Schedule 3 Projects Register
Addition of Deep Drilling Screening Directions page for 2022
Schedule 3 Project Tracker updated
Schedule 3 tracking sheet updated.
Schedule 3 tracking spreadsheet updated
Schedule 3 register updated
Schedule 3 tracker updated.
Schedule 3 Projects Register updated.
Weekly Schedule 3 Projects Register Spreadsheet
Updated Schedule 3 register
Schedule 3 tracking register updated.
New schedule 3 register uploaded
Schedule 3 Projects Register updated.
Updated Schedule 3 register
Updated Schedule 3 Projects Register,
Schedule 3 Register updated
updated schedule 3 register
Weekly Schedule 3 Projects Register udpate
Updated schedule 3 register
Updated Schedule 3 Register
Schedule 3 Projects Register weekly update
Weekly Schedule 3 Projects Register update
Schedule 3 projects register updated.
Schedule 3 register updated
Updated Schedule 3 Register
Schedule 3 tracking spreadsheet updated.
Updated Schedule 3 Register
Schedule 3 tracker updated.
Schedule 3 tracker updated.
Schedule 3 register updated.
Weekly 'Schedule 3 Projects Register' update
Schedule 3 Register updated
Schedule 3 tracking sheet updated.
Schedule 3 Projects Register updated.
Weekly Update to Schedule 3 Projects Register Spreadsheet
Schedule 3 tracking updated.
Schedule 3 tracking spreadsheet updated.
Schedule 3 tracking spreadsheet updated.
Update to Schedule 3 Projects Register
Schedule 3 Projects Register updated.
Addition of section for 'Environmental Impact Asssements (EIA) - Transitional Cases' within the 'Environmental Impact Assesssments (EIA)' section
Weekly update to the Schedule 3 Projects spreadsheet
Update of - Sched 3 spreadsheets - 25/01/2021
'Schedule 3 Projects Register' spreadsheet weekly update
First published.
2026-01-05 14:28
Schedule 3 Projects Register Updated
2025-12-30 15:29
Addition of 2026
2025-12-29 11:11
Schedule 3 Projects Register updated
2025-12-15 08:57
Schedule 3 Projects Register updated
2025-12-08 16:14
Schedule 3 Projects Register – updated
2025-12-01 15:06
Schedule 3 Projects Register updated.
2025-11-24 15:58
Schedule 3 Projects Register updated.
2025-11-18 09:53
Schedule 3 updated.
2025-11-10 15:21
Schedule 3 Projects Register – Updated
2025-11-03 13:49
Schedule 3 updated.
2025-10-27 12:47
Schedule 3 Projects Register – file attachment updated
2025-10-20 11:47
Schedule 3 Projects Register updated.
2025-10-13 15:22
Schedule 3 Projects Register – Updated
2025-10-07 15:51
Schedule 3 Projects Register updated
2025-09-29 10:46
Schedule 3 Projects Register Updated
2025-09-22 12:03
Schedule 3 Projects Register – updated
2025-09-15 11:16
Schedule 3 Projects Register updated
2025-09-08 13:59
Schedule 3 Projects Register uploaded
2025-09-01 10:43
Schedule 3 Projects Register Update
2025-08-26 11:56
Schedule 3 updated
2025-08-18 13:45
Schedule 3 Projects Register updated.
2025-08-11 09:11
Schedule 3 Projects Register Updated
2025-08-04 10:46
Schedule 3 Projects Register updated.
2025-07-28 15:50
Schedule 3 Projects Register – Updated
2025-07-21 12:13
Schedule 3 Projects Register
2025-07-14 11:28
Schedule 3 spreadsheet updated.
2025-07-09 09:53
Schedule 3 Projects register updated.
2025-06-30 14:14
Schedule 3 project register – updated
2025-06-24 11:22
Schedule 3 register updated
2025-06-16 15:44
Schedule 3 Projects Register – Updated
2025-06-09 13:59
Schedule 3 Projects Register updated
2025-06-02 14:38
Updated Schedule 3 Projects Register.
2025-05-26 15:53
Schedule 3 spreadsheet updated.
2025-05-19 13:55
Schedule 3 Projects Register – Uploaded
2025-05-13 10:24
Schedule 3 Projects Register updated
2025-05-06 08:52
Schedule 3 Projects Register updated
2025-04-28 10:16
Schedule 3 Project Register uploaded.
2025-04-22 13:29
Schedule 3 Spreadsheet updated.
2025-04-14 16:13
Schedule 3 Projects Register updated
2025-04-07 15:21
Schedule 3 Projects Register – Uploaded
2025-04-01 07:49
Schedule 3 Projects Register – uploaded
2025-03-24 16:44
Schedule 3 Projects Register updated
2025-03-17 13:03
Schedule 3 Spreadsheet updated.
2025-03-10 12:57
Schedule 3 Projects Register- uploaded
2025-03-03 15:48
2025 Production Screening Directions and 2025 Pipeline Screening Directions added
2025-03-03 14:27
Schedule 3 Projects Register – uploaded
2025-02-24 13:43
Schedule 3 Projects Register updated.
2025-02-17 13:41
Schedule 3 Projects Register updated
2025-02-11 13:58
Schedule 3 register updated
2025-02-03 11:09
Uploaded Schedule 3 Projects Register w.c. 03.02.2025
2025-01-27 15:08
Schedule 3 Register updated.
2025-01-20 15:19
Schedule 3 Projects Register updated
2025-01-13 13:57
Deep Drilling Screening Directions 2025Environmental Impact Assessments (EIA) 2025
2025-01-13 13:37
Schedule 3 Projects Register – updated
2025-01-06 09:25
Schedule 3 Projects Register updated
2024-12-16 10:52
Updated SNS Activity Tracker W/C 16/12/2024.
2024-12-09 14:01
Schedule 3 Projects Register – uploaded
2024-12-03 12:47
Schedule 3 Projects Register updated.
2024-11-25 14:10
Schedule 3 Projects Register – Uploaded
2024-11-18 14:27
Schedule 3 Projects Register- Uploaded
2024-11-11 12:09
Schedule 3 Projects Register- uploaded
2024-11-05 10:54
Schedule 3 Projects Register – file attachment updated
2024-10-29 09:33
Schedule 3 Projects Register updated
2024-10-23 10:50
Update Schedule 3
2024-10-18 12:54
Schedule 3 Spreadsheet updated.
2024-10-07 11:51
Schedule 3 Projects Register updated.
2024-09-30 15:08
Schedule 3 Projects Register updated
2024-09-23 09:54
Schedule 3 Projects Register updated
2024-09-17 10:29
Schedule 3 Projects Register updated
2024-09-10 13:31
Schedule 3 Projects register updated.
2024-09-02 13:25
Schedule 3 Projects Register updated
2024-08-28 10:15
Schedule 3 Projects Register updated
2024-08-19 14:54
Schedule 3 Tracker Update
2024-08-12 15:10
Schedule 3 Projects Register updated
2024-07-29 10:05
Schedule 3 Projects Register updated
2024-07-23 08:56
Schedule 3 Projects Register updated to most recent version
2024-07-15 11:12
Schedule 3 Projects Register updated
2024-07-08 11:27
Schedule 3 Projects Register updated
2024-07-01 10:41
Schedule 3 Projects Register updated
2024-06-24 10:50
Update Schedule 3 – 24.06.24
2024-06-20 10:19
Schedule 3 project register updated.
2024-06-10 16:17
Schedule 3 Projects Register Updated to most recent version
2024-06-03 09:35
Schedule 3 Projects Register updated
2024-05-27 11:27
Schedule 3 register updated
2024-05-20 11:52
Schedule 3 Projects Register updated
2024-05-14 13:21
Schedule 3 Projects Register updated
2024-04-30 14:22
Schedule 3 Projects Register updated to most recent version
2024-04-22 16:04
schedule 3 spreadsheet updated
2024-04-18 14:37
New link to 2024 Production Screening Directions added
2024-04-16 13:29
Schedule 3 update
2024-04-09 15:22
Schedule 3 Projects Register updated to most recent version
2024-04-02 13:33
Schedule 3 projects register updated.
2024-03-26 14:16
Update of Schedule 3 document
2024-03-21 10:11
schedule 3 project register updated to most recent version
2024-03-12 15:18
Schedule 3 Projects Register updated
2024-03-04 15:39
Schedule 3 Projects Register updated
2024-02-27 08:21
Schedule 3 Projects Register updated
2024-02-20 11:21
Schedule 3 Project Register updated
2024-02-14 15:35
Addition of link to 2024 PL screening directions
2024-02-12 15:50
Schedule 3 Projects Register updated
2024-02-07 09:20
Schedule 3 Projects Register updated to most recent version
2024-01-30 08:41
Schedule 3 – 29/01/2024
2024-01-22 13:54
2024 page added
2024-01-22 11:00
Schedule 3 register updated
2024-01-15 14:08
Schedule 3 updated
2024-01-12 13:35
Link to Deep Drilling Screening Directions – 2024 added
2024-01-09 09:37
Schedule 3 spreadsheet updated
2024-01-03 14:17
Schedule 3 register updated
2023-12-18 11:47
Schedule 3 Projects register updated to most recent version
2023-12-11 16:19
Schedule 3 – Updated
2023-12-04 14:17
Schedule 3 updated
2023-11-27 14:49
Schedule 3 Projects Register updated
2023-11-23 16:14
Updated Schedule 3 Projects Register Spreadsheet
2023-11-13 13:37
Schedule 3 Projects Register updated to most recent version
2023-11-06 14:49
Schedule 3 projects register updated
2023-10-30 16:35
Update Schedule 3
2023-10-24 15:38
Schedule 3 Projects Register updated
2023-10-17 11:37
Schedule 3 Spreadsheet updated
2023-10-13 10:59
Schedule 3 Projects Register updated to most recent version
2023-10-05 15:06
Link added to EIA Submissions and Decisions – 2023 webpage
2023-10-03 15:16
Schedule 3 Projects Register updated to most recent version
2023-09-05 13:18
Schedule 3 Projects Register – file attachment UPDATED
2023-08-29 16:55
Schedule 3 Projects Register weekly update
2023-08-15 16:05
Schedule 3 Projects Register updated to most recent version
2023-08-09 14:59
Schedule 3 Projects register – weekly update
2023-08-02 14:07
Schedule 3 updated
2023-07-17 11:32
Schedule 3 spreadsheet updated
2023-07-10 16:21
Schedule 3 Projects register updated to most recent version
2023-07-06 13:13
Updated Schedule 3 Projects Register – 03/07/2023
2023-06-28 10:36
Schedule 3 Projects Register w.c. 26.06.2023 – updated
2023-06-20 09:01
Schedule 3 spreadsheet updated
2023-06-14 09:43
Schedule 3 Projects Register updated to most recent version
2023-06-05 14:53
Schedule 3 Project Register updated to most recent version
2023-05-30 10:05
Schedule 3 Projects Register – 29.05.2023 – UPDATE
2023-05-16 10:12
Current Schedule 3 Spreadsheet
2023-04-24 13:57
Schedule 3 Projects Register updated to most recent version
2023-04-05 16:06
Updated Schedule 3
2023-02-21 16:45
Schedule 3 Project Register updated to latest version
2023-02-10 15:34
add 2023 Pipeline Screening Directions link
2023-02-08 14:28
Schedule 3 projects register update
2023-01-25 14:38
Schedule 3 Projects Register updated
2023-01-05 15:36
Link added to Deep Drilling Screening Directions – 2023
2022-12-20 10:26
Schedule 3 Projects Register updated to most recent version
2022-12-13 11:57
Schedule 3 spreadsheet updated
2022-11-28 10:44
Schedule 3 Project Register updated.
2022-11-15 13:39
Most recent Schedule 3 projects register uploaded
2022-10-12 08:45
Schedule 3 register updated
2022-10-04 12:14
Updated Schedule 3 Projects Register added
2022-09-27 10:20
Updated Schedule 3 spreadsheet
2022-09-20 13:43
Schedule 3 Projects Register Updated
2022-08-30 11:21
Update to schedule 3 projects register
2022-08-23 14:01
Updated Schedule 3 Projects Register as at 22.08.2022
2022-08-15 14:00
Schedule 3 uploaded
2022-08-09 09:37
Schedule 3 Projects Register updated
2022-07-27 09:27
Schedule 3 register updated
2022-07-20 12:46
Schedule 3 Projects Register w.c. 18.07.2022 – Update
2022-07-11 13:08
Schedule 3 projects register updated
2022-06-28 09:30
Schedule 3 updated
2022-06-23 13:14
Schedule 3 updated
2022-06-14 15:30
Schedule 3 spreadsheet updated
2022-05-23 13:26
Schedule 3 register updated
2022-05-17 14:51
Schedule 3 updated
2022-05-03 14:08
Schedule 3 Projects Register updated to most recent version
2022-04-28 16:34
A link to 2022 Environmental Statements added.
2022-04-26 15:50
Schedule 3 updated
2022-04-19 12:43
Schedule 3 updated
2022-04-05 12:38
Schedule 3 register updated
2022-03-29 15:16
Schedule 3 replaced with the newest version
2022-03-21 14:44
Schedule 3 Register updated
2022-03-14 15:44
Schedule 3 Register updated
2022-03-08 15:29
Schedule 3 project register updated
2022-02-28 15:07
Update to Schedule 3 Projects Register
2022-02-23 14:32
Updated schedule 3 spreadsheet